Letter of compliance/Occupancy | | | 7/5/2013 | | DONE |
Tisha Gallop
|
|
|
|
BLD-Final | 5/3/2013 | 5/7/2013 | 5/7/2013 | P | PASS |
Jim Storey
|
|
|
To gain access to the house, there is a key box on the right side of the house -- key box code is 98345. Thanks! Phone #: ###-#### >> Inspection requested via web by Kim Winkle
|
DOC - Permit Finaled | 5/7/2013 | 5/7/2013 | 5/7/2013 | P | PASS |
Jim Storey
|
|
|
|
BLD-Framing/Rough-in | 4/2/2013 | 4/3/2013 | 4/3/2013 | A | PASS |
Jim Storey
|
|
|
TIM Phone #: ###-#### c/n made ok
|
BLD-Energy code compliance | 3/8/2013 | 3/8/2013 | 3/8/2013 | P | PASS |
Jim Storey
|
|
|
|
BLD-Framing/Rough-in | 3/7/2013 | 3/8/2013 | 3/8/2013 | A | FAIL |
Jim Storey
|
|
|
Framing correction engeneering is roll-ed up on top of fireplace. Phone #: ###-#### >> Inspection requested via web by Kim Winkle not supportr at bearing of joist/ support at cut wrong.
|
BLD-Energy code compliance | 2/20/2013 | 2/21/2013 | 2/21/2013 | A | PASS |
Jim Storey
|
|
|
We''ll also need a framing re-inspect at the same time. Call with any questions. Phone #: ###-#### >> Inspection requested via web by Kim Winkle frame part i joist under tub
|
BLD-Framing/Rough-in | 2/21/2013 | 2/21/2013 | 2/21/2013 | A | PART |
Jim Storey
|
|
|
We''ll also need a framing re-inspect at the same time. Call with any questions. Phone #: ###-#### >> Inspection requested via web by Kim Winkle tob joist cut need mfg repair// ok to hang gyp.
|
BLD-Framing/Rough-in | 2/14/2013 | 2/19/2013 | 2/19/2013 | P | FAIL |
Jim Storey
|
|
|
Phone #: ###-#### >> Inspection requested via web by Kim Winkle load of mlb not transphered to pad ft thru floor at bottom of stairs// plm cross over trap cut out i joist at tub provide repair // ok to insulate
|
BLD-Wall Bracing | 2/7/2013 | 2/11/2013 | 2/11/2013 | A | PASS |
Jim Storey
|
|
|
Phone #: ###-#### >> Inspection requested via web by Kim Winkle
|
BLD-Foundation | 1/9/2013 | 1/11/2013 | 1/11/2013 | A | CANC |
Jim Storey
|
|
|
foundation wall//Kevin Phone #: ###-####
|
BLD-Footing | 1/8/2013 | 1/8/2013 | 1/8/2013 | P | PASS |
Jim Storey
|
|
|
Kevin Phone #: ###-####
|
Issue PAID IN FULL permit | | | 1/2/2013 | | DONE |
Tisha Gallop
|
|
|
|
OVERRIDE | | | 12/28/2012 | | |
|
|
|
|
Route to Impact Fee Review | 12/14/2012 | 12/19/2012 | 12/28/2012 | | PASS |
Cindy M. Gould
|
|
|
|
Routing - PLANNING | 12/27/2012 | | 12/28/2012 | | PASS |
Colleen T Carroll
|
|
|
resubmittals recieved
|
Routing - PLAN CHECK | 12/28/2012 | | 12/28/2012 | | PASS |
Perry Paine
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/28/2012 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 12/28/2012 | | |
|
|
|
|
Inspection Record Card- Bld | | | 12/28/2012 | | DONE |
Christina Prado
|
|
|
|
Telephone call | | | 12/28/2012 | | DONE |
|
|
|
spoke with steve permit ready
|
Permit Ready to Issue | | | 12/28/2012 | | DONE |
|
|
|
|
Plan assigned to (PEP) | 12/27/2012 | 12/27/2012 | 12/27/2012 | | FAIL |
Perry Paine
|
|
|
n/a reduced setbacks allowed
|
Plan assigned to (CDM) | | 12/14/2012 | 12/27/2012 | | DEFR |
Carl D Madsen
|
|
|
|
Routing - PLAN CHECK | 12/27/2012 | | 12/27/2012 | | FAIL |
Carl D Madsen
|
|
|
need setback changes
|
Routing - MECHANICAL | 12/18/2012 | | 12/27/2012 | | PASS |
Troy James
|
|
|
|
1st review completed | | | 12/27/2012 | | FAIL |
|
|
|
|
Plan resubmittals received | | | 12/27/2012 | | DONE |
Christina Prado
|
|
|
received two sets of plan sheets marked A1-1, A2-1, A2-2, A2-3, A2-4 & A3-1; gave to Carl Madsen for review
|
Routing - PUBLIC WORKS | | | 12/17/2012 | | PASS |
Connie Baumgartner
|
|
|
|
Routing - Addressing | 12/14/2012 | | 12/14/2012 | | PASS |
April Wing
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 12/14/2012 | | DONE |
Christina Prado
|
|
|
|
Intake Approval | | | 12/14/2012 | | PASS |
Christina Prado
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 12/14/2012 | | DONE |
Christina Prado
|
|
|
|
Application received | | 12/14/2012 | | | |
|
|
|
|
Routing - PLANNING | 12/17/2012 | | | | FAIL |
|
|
|
Can not use reduced setback, garage is over 500 sq. ft.
|