Information based on query as of Sunday, June 30, 2024.
Permit Information
Permit NumberBLD12-03324
StatusFinaled
Name WEBSTER CONSTRUCTION
Site Address 64 N COLE RD
Project NameIdaho Aquarium - Expansion
Customer Number 
ePlanReviewNo
Description
(IDAHO AQUARIUM - EXPANSION) (4-2-14 PLAN MODIFICATION TO USE THE EXPANSION AREA FOR OFFICE AND STORAGE AND NOT FOR ASSEMBLY. THE TOTAL OCCUPANT LOAD OF THE EXPANSION AREA WILL BE 23 AND THE TOTAL OCCUPANT LOAD OF THE TENANT SPACE WILL BE 299 (274 ASSEMBLY, 7 OFFICE, AND 18 STORAGE). A FIRE ALARM SYSTEM IS NOT REQUIRED UNTIL THE OCCUPANT LOAD IS 300 OR MORE. A TOTAL OF ABOUT 4,693 SQUARE FEET OF THIS TENANT SPACE WILL BE AVAILABLE TO THE PUBLIC FOR EXHIBIT TOURS.) (2-19-13 PLAN MODIFICATION TO CONSTRUCT A 36 SQUARE FOOT SITE BUILT AQUARIUM FOR A NEW OCTOPUS EXHIBIT. THE WATER DEPTH IS LIMITED BY THE STRUCTURAL DESIGN TO 48 INCHES MAXIMUM. WORK IS TO INCLUDE 54 INCH HIGH CONCRETE WALLS WITH VERTICAL REBAR AT 16 INCHES ON CENTER AND HORIZONTAL REBAR AT 12 INCHES ON CENTER. VERTICAL REBAR WILL BE EPOXY ANCHORED INTO THE EXISTING CONCRETE SLAB. GLASS OR POLYCARBONATE OBSERVATION PANELS ARE REQUIRED TO BE DESIGNED TO RESIST THE WATER PRESSURE IN ACCORDANCE WITH NATIONALLY RECOGNIZED STANDARDS. A COPY OF THE STRUCTURAL DESIGN FOR THE OBSERVATION PANELS IS REQUIRED TO BE PROVIDED TO THE STRUCTURAL INSPECTOR. EXISTING EXIT DOORS ARE REQUIRED TO BE MAINTAINED.) Fire sprinkler system used for building area increase and for fire area. To expand an existing 9,264 square foot tenant space into an adjacent 4,597 square foot area. After the expansion, this tenant space will have a total floor area of about 13,861 square feet and an assembly occupant load of 393. The first permit for the Idaho Public Aquarium was BLD11-01835 and the second was BLD12-00811. The use of this tenant space is for exhibit tours. A total of about 6,480 square feet of floor area will be available for this use. This facility is NOT approved for day camps and/or overnight stays. Site built aquariums are required to comply with the Structural Engineer’s design. Special inspection is required for epoxy anchors, welding, concrete, and masonry. Precautions shall be taken to prevent children from falling into the aquariums. If guards are not provided, sufficient adult supervision is required at all times when children are present. The work is required to comply with the approved drawings, with the structural design, with the plan review report, and with all applicable codes and ordinances. The fire sprinkler system is required to comply with NFPA 13 and the fire alarm system is required to comply with NFPA 72 as regulated by the Fire Department. **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
First Notice 5/2/20146/3/2014 DONE
per Rita ok to sign off. Unable to obtain accurate values per not able to contact owner and GC was not involved in alot of this project
Permanent Occupancy  4/22/2014 DONE
DetailsChristina Prado
BLD-Final4/21/20144/21/20144/21/2014PPASS
DetailsTom Arcoraci
Joe Phone #: ###-####
FIRE-Final Inspection4/18/20144/18/20144/18/2014PPASS
DetailsForrest France
Verified scope of work per most recent plan modification for the storage and office area expansion. Hardware at the intermediate exit door to the south to be replaced with compliant style prior to structural final as discussed.
BLD-Final4/14/20144/14/20144/14/2014PPART
DetailsTom Arcoraci
Octopus exhibit has been completed and final inspections performed by all trades. Plan modification for offices/storage in western half of facility will have to be completed in order for this permit to be finaled and a permanant CO issued.
FIRE-Final Inspection4/2/20144/3/20144/3/2014PPASS
DetailsTroy Cobbley
life safety passed for the plan modification to add the two new tanks
CHANGE STATUS TO (ISS)  4/3/2014 DONE
DetailsTisha Gallop
plan mod approved and paid
OVERRIDE  4/2/2014  
BLD-Other3/26/20144/2/20144/2/2014APASS
DetailsTom Arcoraci
for octopus tank // Paul Phone #: ###-#### needs all sign offs
Plan assigned to (CJW)4/1/20144/1/20144/2/2014 PASS
DetailsCarl Westfall
Routing - PLAN CHECK4/1/2014 4/2/2014 PASS
DetailsCarl Westfall
Plan modification approved
PLANS/APPL TAKEN TO FRONT DESK  4/2/2014 DONE
Print Occupancy Form  4/2/2014 DONE
DetailsChristina Prado
Permit Ready to Issue  4/2/2014 DONE
DetailsBarbara Stitt
Telephone call  4/2/2014 DONE
DetailsBarbara Stitt
Called and left voie message for Paul that permit is ready & fees due on 4-2-14 @ 4:30pm///BAS
Plan Modification Accepted  4/1/2014 DONE
DetailsChristina Prado
Received two sets of plans marked A1.3 & A2.1 to show proposed changes to two offices, expanding of the laundry & electrical rooms; Plans taken to Carl Westfall for further review
(F) Reprint permit  12/20/2013 DONE
CHANGE STATUS TO (ISS)  12/20/2013 DONE
OVERRIDE  12/19/2013  
Plan assigned to (CJW)12/16/201312/16/201312/19/2013 PASS
DetailsCarl Westfall
Routing - PLAN CHECK12/16/2013 12/19/2013 PASS
DetailsCarl Westfall
Plan modification review completed
PLANS/APPL TAKEN TO FRONT DESK  12/19/2013 DONE
Print Occupancy Form  12/19/2013 DONE
DetailsBarbara Stitt
Permit Ready to Issue  12/19/2013 DONE
DetailsBarbara Stitt
Plan Modification Accepted  12/16/2013 DONE
DetailsTisha Gallop
Plan modification accepted to add new octopus exhibit with 8" thick concrete walls. Current space has nothing there now. ; submitted with structrual calcs and plan sheet A1; routed to Carl Westfall.
BLD-Conference6/7/20137/10/201310/30/2013ACANC
DetailsTom Arcoraci
Case Summary (BLD)  9/25/2013 DONE
BLD-Conference9/23/20139/23/20139/23/2013PPASS
DetailsTom Arcoraci
BLD-Conference9/20/20139/23/20139/23/2013APASS
DetailsTom Arcoraci
David Phone #: ###-#### WILL MEET PM
Print Occupancy Form  8/8/2013 DONE
BLD-Conference6/6/20136/6/20136/7/2013PPASS
DetailsTom Arcoraci
work on this permit at temp stop
BLD-Conference6/5/20136/6/20136/6/2013ACANC
DetailsTom Arcoraci
BLD-Conference6/5/20136/5/20136/6/2013PCANC
DetailsTom Arcoraci
Check status of project, no call for inspection.
BLD-Wall Bracing4/15/20134/15/20134/15/2013PPART
DetailsTom Arcoraci
Wall bracing shall be per detail on page A2. Architectual resubmittal required if increased spacing of braces wanted.
(F) Reprint permit  3/25/2013 DONE
DetailsTisha Gallop
Print Occupancy Form  3/25/2013 DONE
DetailsTisha Gallop
Meeting  3/25/2013 DONE
DetailsTisha Gallop
Transfered permit to new GC, Webster Construction.
MISC ACTIONS  3/11/2013 DONE
DetailsChristina Prado
Per attached letter - Todd Campbell contruction will no longer be swerving as General Contractor for this project. The new contractor awarded must pay $46.31 to transfer the BLD over and fill out new GC form as well as $52.50 to transfer the Rp over.
Telephone call  3/7/2013 DONE
DetailsRita DeYoung
Received phone call from Amanda that Todd Campbell Const. will no longer be the GC. I told Amanda that the new cont. will need to come in and pay the admin fee, fill out new GC, RP information. We will reprint the permits with new information.
BLD-Conference3/5/20133/5/20133/2/2013APEND
DetailsTom Arcoraci
No activity in progress, waiting to complete exterior door on other permit before resuming work.
Issue PAID IN FULL permit  2/26/2013 DONE
DetailsBarbara Stitt
Plan assigned to (CJW)1/18/20131/18/20132/21/2013 PASS
DetailsCarl Westfall
IDAHO AQUARIUM EXPANSION (20 days - Feb 12)
Routing - PLAN CHECK2/20/2013 2/21/2013 DONE
DetailsCarl Westfall
Routing completed
PLANS/APPL TAKEN TO FRONT DESK  2/21/2013 DONE
Print Occupancy Form  2/21/2013 DONE
DetailsChristina Prado
Override - Parcel Holds  2/21/2013  
Permit Ready to Issue  2/21/2013 DONE
DetailsTisha Gallop
Telephone call  2/21/2013 DONE
DetailsTisha Gallop
called the phone number Ammon put on the application, which was the front desk for Idaho Aquarium. Left message with girl who answered for Ammon that permit is ready, fee due, need GC & form and RP. She said would let him know.
Routing - PLAN CHECK2/12/2013 2/20/2013 DONE
DetailsCarl Westfall
Wainting for ESC resubittal
Plan resubmittals received  2/20/2013  
2-20-13 received 2 erosion and sediment control checklist with project information on Idaho Aquarium sent to Carl M
Routing - Erosion and Sediment2/20/2013 2/20/2013 PASS
DetailsKimberly M. Johnson
Route to Impact Fee Review2/8/20132/13/20132/13/2013 PASS
DetailsCindy M. Gould
Tenant improvement no impact fees
Routing - FIRE2/8/20132/8/20132/12/2013 PASS
DetailsScott Arellano
Attached Fire Review comments to plans.
1st review completed  2/12/2013 FAIL
Failed ESC
Routing - PLAN CHECK1/29/2013 2/8/2013 PASS
DetailsCarl Westfall
Drawings approved with "red lines".
Routing - Design Review1/28/2013 1/29/2013 PASS
DetailsJosh Wilson
Routing - PLUMBING1/25/2013 1/28/2013 PASS
DetailsBill VanDegrift
no plumbing per plan intake
Routing - Erosion and Sediment1/22/2013 1/25/2013 FAIL
DetailsKimberly M. Johnson
plan required. Called J Truex Architecture to inform. Called Mr. Covino to inform who was not available. Sent email to J Truex and Mr. Covino.
Routing - PUBLIC WORKS1/18/2013 1/22/2013 PASS
DetailsBeverly Mountain
Routing PW Sewer Rating1/18/2013 1/22/2013 PASS
DetailsConnie Baumgartner
Routing PW Environmental1/22/2013 1/22/2013 PASS
DetailsWalt Baumgartner
West Boise Sewer District jurisdiction, facility subject to pretreatment inspection for compliance w/ District sewer discharge rules
Plan Reviewer's activity  1/18/2013 DONE
DetailsJason Blais
Sent email for applicant to contact ACHD for evaluation of any impact fees. Written verification from ACHD needs to be provided to our Permit Counter prior to the building permit being issued.
Pending Assignment by JCB1/17/2013 1/18/2013 DONE
DetailsJason Blais
Routing - Addressing1/18/2013 1/18/2013 PASS
DetailsJason C. Taylor
Application received 12/26/20121/17/2013 DONE
DetailsTisha Gallop
Override - Parcel Holds  1/17/2013  
Recd Pcfee & Taken To Pln CK  1/16/2013 DONE
DetailsTisha Gallop
Intake Approval  1/16/2013 PASS
2nd plan intake
Plans ACCEPTED BY PLAN TECH  1/16/2013 DONE
DetailsTisha Gallop
Intake Approval  12/26/2012 FAIL
Address circled items on the plan intake form.