Permit Information
Permit NumberBLD12-03333
StatusFinaled
Name CSDI CONSTRUCTION INC
Site Address 1357 N LILLY AVE
Project NameKeeneland Park
Customer Number 
ePlanReviewYes
Description
Keeneland Park Clubhouse - To construct a new 2,539 square foot, one story, wood framed, multi-purpose residential community clubhouse for the Keenland Park subdivision. The clubhouse will have a 1,067 sq.ft. Great room/Warming Kitchen/Dining area/Sitting room/ Entry lobby, two accessible restrooms, a 373 sq.ft. Exercise room, a 200 sq.ft. Managers office, a 221 sq.ft. leasing/Office, an attached 94 sq.ft. Covered porch, a attached 230 sq.ft. covered rear patio, an 124 sq.ft. Attached pool equipment storage room, and related site improvements. The occupant load for the clubhouse portion is 72 and shall be posted in a conspicuous place, near the main exit. This permit does not include the installation of the swimming pool. A separate permit is required to construct the swimming pool. All construction shall be per the approved plans, Engineering, approvals from all other reviewing departments, and the attached plan review report. This building is NOT fire sprinklered. DRH12-00344 - CUP05-00009 per Planning and Zoning. **SRZ**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice 2/2/20142/6/2014 DONE
DetailsChristina Prado
emailed 2-6-14
Second Notice 12/9/20131/28/2014 DONE
mailed
First Notice 11/11/201311/29/2013 DONE
Faxed 11-29-13
Permanent Occupancy  11/1/2013 DONE
DetailsTisha Gallop
e-mailed to Jeffrey Langan/CSDI Const
BLD-Final10/31/201310/31/201310/31/2013PPASS
DetailsMike Jordan
need final pass for perm occ since pw signed for perm. Ok for perm. occ
PubWorks Occupancy Approval10/31/201310/31/201310/31/2013 PASS
DetailsBrian Murphy
Override - Parcel Holds  10/31/2013  
Override - Parcel Holds  10/31/2013  
BLD-Final10/24/201310/25/201310/25/2013PPART
DetailsMike Jordan
PLease call Jeffrey 45 mins before site visit-Jeffrey Phone #: ###-####. Ok for temp occ. once public works signs temp. Will be ok for perm occ once public works signs perm.
Override - Parcel Holds10/24/20131/1/190010/24/2013  
temp occupancy
Zoning Approval9/19/20139/19/20139/19/2013 PASS
DetailsJosh Wilson
Override - Parcel Holds  9/19/2013  
BLD-Final9/17/20139/17/20139/17/2013PCANC
DetailsMike Jordan
rocko Phone #: ###-####. Cancelled by contractor via phone call.
Override - Parcel Holds9/17/20131/1/19009/17/2013  
Poo house final
BLD-Final9/10/20139/11/20139/11/2013ANR
DetailsJim Storey
rob Phone #: ###-#### open plm and mec permits need p&z sign off as well as public works
BLD-Conference9/4/20139/5/20139/5/2013ADONE
DetailsMike Jordan
Rocko Phone #: ###-####
FIRE-Final Inspection9/4/20139/4/20139/4/2013PPASS
DetailsTroy Cobbley
life safety passed. The sliding door hardware is not ADA compliant and will need to be corrected prior to the building final.
Override - Parcel Holds9/4/20131/1/19009/4/2013  
conference inspection
BLD-Framing/Rough-in6/27/20136/27/20136/27/2013PCANC
DetailsMike Jordan
rocco Phone #: ###-####
BLD-Energy code compliance6/27/20136/27/20136/27/2013PPASS
DetailsMike Jordan
rocco Phone #: ###-####
BLD-Framing/Rough-in6/25/20136/26/20136/25/2013APASS
DetailsJim Sly
Rocko Phone #: ###-####
BLD-Framing/Rough-in6/20/20136/20/20136/20/2013PFAIL
DetailsMike Jordan
rocco Phone #: ###-####. Complete airseal pack, fireblock all furdowns, provide truss engineering and strap beam to column connetctions.
FIRE-Conference6/18/20136/18/20136/19/2013PDONE
DetailsForrest France
On site conference regarding fire life safety conditions and requirements for occupancy approval.
BLD-Wall Bracing6/12/20136/12/20136/12/2013PPASS
DetailsMike Jordan
roco Phone #: ###-####
BLD-Wall Bracing6/11/20136/12/20136/12/2013AFAIL
DetailsMike Jordan
rocco Phone #: ###-####. Provide conversion chart or nail off per approved plan.
OVERRIDE  6/3/2013  
BLD-Foundation5/14/20135/15/20135/15/2013APASS
DetailsMike Jordan
Late morning - rocco Phone #: ###-####
BLD-Footing5/10/20135/13/20135/13/2013PPASS
DetailsMike Jordan
rocco early pm if possible Phone #: ###-####0. Perimeter footings and column pad footings for front entry ok. No special inspection on concrete. Desighn 2,500psi per engineer of record.
CHANGE STATUS TO (ISS)  5/1/2013 DONE
DetailsChristina Prado
Print Occupancy Form  5/1/2013 DONE
DetailsChristina Prado
Issue PAID IN FULL permit  5/1/2013 DONE
DetailsChristina Prado
Telephone call  4/24/2013 DONE
DetailsTisha Gallop
received e-mail from Jeffrey Langan/CSDI, received RP, GC initial value and GC form. I told him fees due and still need ACHD.
Routing Off Site - STRUCTURAL2/25/2013 2/25/2013 PASS
DetailsSam Zahorka
PLANS/APPL TAKEN TO FRONT DESK  2/25/2013 DONE
DetailsSam Zahorka
Permit Ready to Issue  2/25/2013 DONE
DetailsChristina Prado
Plan assigned to (SRZ)1/15/2013 2/25/2013 PASS
DetailsSam Zahorka
1st review completed.
Routing PW Solid Waste1/15/2013 2/25/2013 PASS
DetailsPeter J. McCullough
Passed per Connie Baumgartner
Routing Off Site - STRUCTURAL2/12/2013 2/19/2013 FAIL
DetailsSam Zahorka
Routing - PLAN CHECK2/12/2013 2/14/2013 PASS
DetailsSam Zahorka
1st review completed  2/8/2013 DONE
DetailsSam Zahorka
Failed Structural Review and Building Plan Review
Routing - PLAN CHECK1/15/2013 2/8/2013 FAIL
DetailsSam Zahorka
Routing Off Site - STRUCTURAL1/15/2013 1/24/2013 FAIL
DetailsSam Zahorka
Routing - FIRE1/15/20131/15/20131/18/2013 PASS
DetailsScott Arellano
Attached Fire Code report to plans.
Routing PW Drainage1/15/2013 1/17/2013 PASS
DetailsBrian Murphy
Routing - Erosion and Sediment1/15/2013 1/16/2013 PASS
DetailsKimberly M. Johnson
Payment Received  1/15/2013 DONE
Payment received via Govolutions
Route to Impact Fee Review1/15/20131/18/20131/15/2013 PASS
DetailsCindy M. Gould
Routing - Design Review1/15/2013 1/15/2013 PASS
DetailsJosh Wilson
OK per DRH12-00344
Routing - PLANNING Land Div1/15/2013 1/15/2013 PASS
DetailsDave Abo
Clubhouse on Lot 5, Block 3 of Keeneland Subdivision.
Pending Assignment by JCM1/15/2013 1/15/2013 DONE
DetailsJohn Menard
Routing - PUBLIC WORKS1/15/2013 1/15/2013 PASS
DetailsConnie Baumgartner
Route to Impact Fee Review1/15/2013 1/15/2013 PASS
DetailsCindy M. Gould
Routing PW Sewer Design1/15/2013 1/15/2013 PASS
DetailsKyle S. Rosenmeyer
Proposed sewer connection to provided 4" service off of N Lilly Ave. Be advised the lot is also served from N Wildwood Way with a 6" service approximatley mid lot, which may extend into the property.
Routing - Addressing1/15/2013 1/15/2013 PASS
DetailsJason C. Taylor
Routing PW Sewer Rating1/15/2013 1/15/2013 PASS
DetailsConnie Baumgartner
Application received  12/28/2012 DONE
Application submitted via PDS Online on Dec 28 2012 10:45AM
Routing - PLUMBING1/15/2013 1/17/2012 PASS
DetailsDaryl Spivey
Per plans and 2009 ISPC.