Third Notice | | 2/8/2014 | 2/28/2014 | | DONE |
|
|
|
|
Third Notice | | 1/13/2014 | 2/3/2014 | | DONE |
|
|
|
e-mailed to Aaron Campos (mail to project address is undeliverable/no receptacle)
|
Second Notice | | 11/9/2013 | 12/23/2013 | | DONE |
|
|
|
|
First Notice | | 10/21/2013 | 10/30/2013 | | DONE |
Christina Prado
|
|
|
mailed 10-31-13 // returned mail from project address, e-mailed to Aaron Campos on 11/27/13 leg
|
Permanent Occupancy | | | 10/11/2013 | | DONE |
|
|
|
|
Print Occupancy Form | | | 10/8/2013 | | DONE |
|
|
|
|
BLD-Final | 10/4/2013 | 10/7/2013 | 10/7/2013 | P | PASS |
Tom Arcoraci
|
|
|
Lily Phone #: ###-####
|
FIRE-Final Inspection | 10/1/2013 | 10/2/2013 | 10/2/2013 | P | PASS |
Troy Cobbley
|
|
|
Life safety passed. Addressed to be installed prior to the building inspection.
|
BLD-Final | 10/1/2013 | 10/2/2013 | 10/2/2013 | P | CANC |
Tom Arcoraci
|
|
|
Lilly Phone #: ###-####
|
FIRE-Conference | 10/1/2013 | 10/1/2013 | 10/1/2013 | P | DONE |
Troy Cobbley
|
|
|
Went over life safety requirements with Lilly.
|
Override - Parcel Holds | 8/16/2013 | 1/1/1900 | 8/16/2013 | | |
|
|
|
this is not for a final
|
BLD-Framing/Rough-in | 4/18/2013 | 4/19/2013 | 4/19/2013 | A | PART |
Tom Arcoraci
|
|
|
aaron Phone #: ###-#### bathrooms only ok to cover
|
OVERRIDE | | | 2/1/2013 | | |
|
|
|
|
Print Occupancy Form | | | 2/1/2013 | | DONE |
Barbara Stitt
|
|
|
|
Issue PAID IN FULL permit | | | 2/1/2013 | | DONE |
Barbara Stitt
|
|
|
|
Permit Ready to Issue | | | 2/1/2013 | | DONE |
Barbara Stitt
|
|
|
|
Plan assigned to (SRZ) | 1/3/2013 | 1/3/2013 | 1/31/2013 | | PASS |
Sam Zahorka
|
|
|
ePlanReview - SALON EDEN
|
Routing PW Environmental | 1/31/2013 | | 1/31/2013 | | PASS |
Walt Baumgartner
|
|
|
Floor sink under class 1 hood deleted
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/31/2013 | | DONE |
Sam Zahorka
|
|
|
|
Routing - PLAN CHECK | 1/3/2013 | | 1/30/2013 | | PASS |
Sam Zahorka
|
|
|
|
1st review completed | | | 1/30/2013 | | DONE |
Sam Zahorka
|
|
|
Failed in PW Enviromental
|
Routing - PLUMBING | 1/3/2013 | | 1/7/2013 | | PASS |
Bill VanDegrift
|
|
|
1. delete existing floor sink under grill, mop sink ok to sanitary sewer per Walt B.
2. May require additional backflow protection.
|
Routing - FIRE | 1/3/2013 | | 1/4/2013 | | PASS |
Scott Arellano
|
|
|
Attached plan review comments to plans.
|
Routing - Erosion and Sediment | 1/3/2013 | | 1/4/2013 | | PASS |
Kimberly M. Johnson
|
|
|
waiver approved
|
Routing PW Sewer Rating | 1/3/2013 | | 1/4/2013 | | PASS |
Connie Baumgartner
|
|
|
|
Routing PW Environmental | 1/4/2013 | | 1/4/2013 | | FAIL |
Walt Baumgartner
|
|
|
correction - connect floor sink under existing class 1 hood to new grease line
|
Routing - Addressing | 1/3/2013 | | 1/3/2013 | | PASS |
Jason C. Taylor
|
|
|
|
Routing - PUBLIC WORKS | 1/3/2013 | | 1/3/2013 | | PASS |
Beverly Mountain
|
|
|
|
Intake Approval | | | 1/3/2013 | | PASS |
Tim L. Woodard
|
|
|
|
Pending Assignment by JCB | 1/3/2013 | | 1/3/2013 | | DONE |
Jason Blais
|
|
|
|
Intake Approval | | | 1/2/2013 | | FAIL |
Tim L. Woodard
|
|
|
Bill,
Please upload additional information. With the addition of a greese interceptor and a new curb ramp in the parking lot an ESC waiver and application needs to be submitted.
Best regards,
Tim Woodard
Plans Examiner II
City of Boise
Twoodard@cityofboise.org
|
Application received | | | 12/28/2012 | | DONE |
|
|
|
Application submitted via PDS Online on Dec 28 2012 1:40PM
|
Routing - Design Review | 1/3/2013 | | | | PASS |
Sarah Schafer
|
|
|
Sarah Schafer Minor exterior changes approved through building permit application.
|