Third Notice | | 8/10/2013 | 8/15/2013 | | DONE |
|
|
|
This permit finaled on the web by Ronald Van Auker
|
Second Notice | | 7/12/2013 | 8/5/2013 | | DONE |
|
|
|
|
First Notice | | 6/2/2013 | 7/2/2013 | | DONE |
|
|
|
Faxed 7-2-13
|
BLD-Final | 5/23/2013 | 5/23/2013 | 5/23/2013 | P | PASS |
Mike Jordan
|
|
|
Ros has been approved.
|
Permanent Occupancy | | | 5/23/2013 | | DONE |
Barbara Stitt
|
|
|
|
Plan Reviewer's activity | | | 5/20/2013 | | DONE |
Jason Blais
|
|
|
Record of Survey (ROS12-00054) completed. Permit can be finaled when all work is completed.
|
BLD-Final | 5/17/2013 | 5/17/2013 | 5/17/2013 | P | DEFR |
Jim Storey
|
|
|
Gayle Phone #: ###-#### pending ros aproval
|
FIRE-Final Inspection | 5/17/2013 | 5/17/2013 | 5/17/2013 | P | PASS |
Troy Cobbley
|
|
|
life safety passed
|
FIRE-Final Inspection | 5/15/2013 | 5/16/2013 | 5/16/2013 | A | FAIL |
Troy Cobbley
|
|
|
Life safety is passed but due to an outstanding ROS permit, per plan review, this permit can not be signed off.
|
Override - Condition Holds | 5/15/2013 | 1/1/1900 | 5/15/2013 | | |
|
|
|
Fire life safety only
|
FIRE-Final Inspection | 1/31/2013 | 2/1/2013 | 2/1/2013 | A | FAIL |
Forrest France
|
|
|
Provide fire sprinkler coverage at the "computer room" in the warehouse area-or remove ceiling, permit documents indicate no racking exceeding 8' in height allowed- provide a fire sprinkler system analysis and a racking permit for the intended use- or remove existing racking >8'.
|
BLD-Framing/Rough-in | 1/24/2013 | 1/24/2013 | 1/24/2013 | P | PASS |
Jim Sly
|
|
|
ron Phone #: ###-####
|
Override - Parcel Holds | | | 1/11/2013 | | |
|
|
|
|
Permit Ready to Issue | | | 1/11/2013 | | |
|
|
|
|
Print Occupancy Form | | | 1/11/2013 | | DONE |
|
|
|
|
Telephone call | | | 1/11/2013 | | |
|
|
|
1-11-13 called Gayle Jensen permit ready and fee given ///dld
|
Override - Parcel Holds | | | 1/11/2013 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 1/11/2013 | | |
|
|
|
|
Routing - PLANNING Land Div | 1/9/2013 | | 1/10/2013 | | PASS |
Dave Abo
|
|
|
The applicant has submitted a record of survey for a lot consolidation and has agreed to withhold occupancy until the lot consolidation has been completed.
|
1st review completed | | | 1/10/2013 | | DONE |
Tim L. Woodard
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/10/2013 | | DONE |
Tim L. Woodard
|
|
|
|
Case Summary (BLD) | | | 1/10/2013 | | DONE |
Tim L. Woodard
|
|
|
|
Print Occupancy Form | | | 1/10/2013 | | DONE |
|
|
|
|
Plan assigned to (TLW) | 1/7/2013 | | 1/10/2013 | | PASS |
Tim L. Woodard
|
|
|
|
Routing - PUBLIC WORKS | | | 1/10/2013 | | PASS |
Connie Baumgartner
|
|
|
|
Routing - PLAN CHECK | 1/10/2013 | | 1/10/2013 | | PASS |
Tim L. Woodard
|
|
|
|
Routing PW Environmental | 1/10/2013 | | 1/10/2013 | | PASS |
Walt Baumgartner
|
|
|
Terry Alber 1000 gal concrete sand/grease interceptor okay, installer to vent head space in accordance w/ plumbing code.
|
Routing PW Sewer Rating | 1/8/2013 | | 1/8/2013 | | PASS |
Connie Baumgartner
|
|
|
|
Routing PW Drainage | 1/8/2013 | | 1/8/2013 | | PASS |
Brian Murphy
|
|
|
no drainage plan needed t. i.
|
Routing - Addressing | 1/7/2013 | | 1/8/2013 | | PASS |
Jason C. Taylor
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 1/7/2013 | | |
|
|
|
ok per Tim W to take in as a level 1
|
Recd Pcfee & Taken To Pln CK | | | 1/7/2013 | | |
|
|
|
|
Application received | | 1/7/2013 | | | |
|
|
|
|