Information based on query as of Friday, August 16, 2024.
Permit Information
Permit NumberBLD13-00028
StatusIssued
Name ALTA CONSTRUCTION
Site Address 12601 W BRIDGER ST
Project NameIdaho Power - Boise Center Wes
Customer Number 
ePlanReviewNo
Description
(IDAHO POWER – Boise Center West – Mezzanine and Entry – Phase 6) This building is fire sprinklered for unlimited area provisions.PLAN MODIFICATION 4-8-13 – Modification submitted to add a platform lift to new mezzanine and add additional windows in the exterior walls. **TLW** Permit is to add a 2,997 square foot interior mezzanine and a 720 square foot entry vestibule. Work is to include: construction of mezzanine (new bearing columns, new steel joists, new 4 inch 20 ga. B-deck, new steel headers, and two new stairways), construction of new vestibule (new exterior bearing walls, new FRT plywood roof deck, new metal roof joists, and new steel headers), new cement plaster exterior finish on vestibule, new windows added to existing exterior masonry wall, installation of new accessible doors / hardware, and interior finishes. This building is fully Fire Sprinklered with an approved Fire Alarm system. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. NOTE: This permit cannot be finaled and given a C of O until BLD13-00002 is finaled. PLAN MODIFICATION 4-8-13 – Modification submitted to add a platform lift to new mezzanine and add additional windows in the exterior walls. **TLW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
FIRE-Final Inspection8/29/20138/30/20138/30/2013APASS
DetailsTroy Cobbley
Life safety passed
BLD-Final8/29/20138/29/20138/29/2013PPART
DetailsJim Storey
handrail 12 at landinds/ si report
OVERRIDE  7/30/2013  
OVERRIDE  7/30/2013  
CHANGE STATUS TO (ISS)  7/30/2013 DONE
DetailsChristina Prado
(F) Reprint permit  7/30/2013 DONE
DetailsChristina Prado
Routing - Design Review7/30/2013 7/30/2013 PASS
DetailsAndrea Tuning
Routing - PLAN CHECK7/30/2013 7/30/2013 PASS
DetailsTim L. Woodard
PLANS/APPL TAKEN TO FRONT DESK  7/30/2013 DONE
DetailsTim L. Woodard
Telephone call  7/30/2013 DONE
DetailsChristina Prado
called David to advise plan mod #3 is ready and gave fees due
Permit Ready to Issue  7/30/2013 DONE
Plan assigned to (TLW)7/8/2013 7/30/2013 PASS
DetailsTim L. Woodard
Routing - PLAN CHECK7/8/2013 7/30/2013 PASS
DetailsTim L. Woodard
Plan mod only changed location of windows. TLW
Routing - PLANNING7/8/2013 7/8/2013 FAIL
DetailsAndrea Tuning
The applicant will be required to complete a DR application prior to the building permit.
Plan resubmittals received  7/8/2013 DONE
DetailsChristina Prado
received two revised sheets marked A3.00 & A3.02; routed to Tim for further review
OVERRIDE  6/14/2013  
Telephone call  6/14/2013 DONE
DetailsTisha Gallop
called David Blodgett and told him plan mod is ready and fees.
Plan assigned to (TLW)5/24/2013 6/14/2013 PASS
DetailsTim L. Woodard
Routing - PLAN CHECK5/24/2013 6/14/2013 PASS
DetailsTim L. Woodard
Added 1 hour for revised anchorage connection. No change to scope of work. TLW
PLANS/APPL TAKEN TO FRONT DESK  6/14/2013 DONE
DetailsTim L. Woodard
BLD-Framing/Rough-in6/10/20136/10/20136/10/2013APASS
DetailsJim Storey
north west exterior entry ok to cover inside pending ele aproval.
Plan resubmittals received  5/24/2013 DONE
DetailsTisha Gallop
received two copies of plan sheet A3.00; changed plans to REV status and taken back to Tim W.
Plan assigned to (TLW)3/15/2013 4/9/2013 PASS
DetailsTim L. Woodard
Routing - PLAN CHECK4/8/2013 4/9/2013 PASS
DetailsTim L. Woodard
Case Summary (BLD)  4/9/2013 DONE
DetailsTim L. Woodard
Print Occupancy Form  4/9/2013 DONE
Permit Ready to Issue  4/9/2013  
Telephone call  4/9/2013  
4-9-13 called David Blodgett permit ready and fee given Also called Alta construction they need to pay past due fees on bld11-0 ///dld
Routing - PLANNING4/5/2013 4/8/2013 PASS
DetailsAndrea Tuning
Routing - PLAN CHECK3/15/2013 4/5/2013 PASS
DetailsTim L. Woodard
New windows and platform lift modifications approved. TLW
BLD-Concrete3/22/20133/22/20133/22/2013APASS
DetailsJim Storey
vestabule slab rebar ect ok to place pour back of interior slab east end ok
BLD-Footing3/19/20133/19/20133/19/2013APASS
DetailsJim Storey
exterior ft and walls rebar ok
Plan Modification Accepted  3/15/2013 DONE
DetailsChristina Prado
received plan modification to add a wheelchair access lift to mezzanine and window changes; received three sets of plans marke A0.00, A0.01, A0.02, A1.00, A1.01, A2.01, A2.02, A2.11, A2.12, A2.31, A3.00, A3.01, A3.02, A4.01, A5.01, S0.01, S1.01, S1.10, S2.01 & S2.10; Taken to Tim Woodard for review
BLD-Footing3/7/20133/7/20133/7/2013APASS
DetailsJim Storey
pending si report
Issue PAID IN FULL permit  3/1/2013 DONE
OVERRIDE  2/21/2013  
Routing - FIRE2/12/2013 2/21/2013 PASS
DetailsScott Arellano
Attached IFC comments to plans.
Routing - PLAN CHECK2/21/2013 2/21/2013 PASS
DetailsTim L. Woodard
Approved with plan review report & BLD13-00002. TLW
PLANS/APPL TAKEN TO FRONT DESK  2/21/2013  
DetailsTim L. Woodard
Case Summary (BLD)  2/21/2013 DONE
DetailsTim L. Woodard
Print Occupancy Form  2/21/2013 DONE
Telephone call  2/21/2013 DONE
DetailsChristina Prado
called David to advise permit is ready pending GC info and gave fees due
Permit Ready to Issue  2/21/2013 DONE
DetailsChristina Prado
Plan assigned to (TLW)  2/21/2013 PASS
DetailsTim L. Woodard
Routing - PLAN CHECK1/28/2013 2/21/2013 PASS
DetailsTim L. Woodard
Routing - PLAN CHECK2/5/2013 2/12/2013 PASS
DetailsTim L. Woodard
Routing - Erosion and Sediment2/4/2013 2/5/2013 PASS
DetailsKimberly M. Johnson
Plan resubmittals received  2/4/2013 DONE
DetailsTisha Gallop
received two copies of ESC narrative; taken to Tim Woodard
1st review completed  1/28/2013 FAIL
Failed ESC & Fire
Routing - FIRE1/25/2013 1/28/2013 FAIL
DetailsScott Arellano
Faxed & emailed Resubmittal item to architect.
Routing - PLAN CHECK1/16/2013 1/25/2013 PASS
DetailsTim L. Woodard
Approved with redlines and with the finaling of BLD13-00021. TLW
Case Summary (BLD)  1/25/2013 DONE
DetailsTim L. Woodard
Routing - Erosion and Sediment1/14/2013 1/15/2013 FAIL
DetailsKimberly M. Johnson
Redlines sent to PD
Routing - PLANNING1/11/2013 1/14/2013 PASS
DetailsAndrea Tuning
Routing PW Sewer Rating1/11/2013 1/11/2013 PASS
DetailsConnie Baumgartner
Routing - PUBLIC WORKS1/9/2013 1/11/2013 PASS
DetailsConnie Baumgartner
Routing - Addressing1/10/2013 1/10/2013 PASS
DetailsJason C. Taylor
Plans ACCEPTED BY PLAN TECH  1/9/2013 DONE
DetailsChristina Prado
Recd Pcfee & Taken To Pln CK  1/9/2013 DONE
DetailsChristina Prado
Intake Approval  1/7/2013 PASS
DetailsTim L. Woodard
Application received 1/8/2013