BLD-Final | 2/7/2013 | 2/8/2013 | 2/8/2013 | A | PASS |
Tom Arcoraci
|
|
|
Heidi Phone #: ###-####
|
FIRE-Final Inspection | 2/7/2013 | 2/8/2013 | 2/8/2013 | A | PASS |
Troy Cobbley
|
|
|
Life safety passed. Fire alarm is N/A
|
Permanent Occupancy | | | 2/8/2013 | | DONE |
Barbara Stitt
|
|
|
|
FIRE-Final Inspection | 1/10/2013 | 1/11/2013 | 1/11/2013 | A | PART |
Troy Cobbley
|
|
|
A temporary occupancy is being given with Romeo's permission until the fire sprinkler issues have been addressed. A letter has been provided that states a fire sprinkler contractor has been hired to perform the work.
|
BLD-Final | 1/10/2013 | 1/11/2013 | 1/11/2013 | P | PASS |
Tom Arcoraci
|
|
|
Heidi Phone #: ###-#### ok for temp occ ok for perm when fire signs perm
|
Temporary Occupancy | 1/11/2013 | 4/11/2013 | 1/11/2013 | | DONE |
Barbara Stitt
|
|
|
|
Plan assigned to (CDM) | 1/10/2013 | 1/10/2013 | 1/10/2013 | | DONE |
Carl D Madsen
|
|
|
|
1st review completed | | | 1/10/2013 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 1/10/2013 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/10/2013 | | |
|
|
|
|
Print Occupancy Form | | | 1/10/2013 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 1/10/2013 | | |
|
|
|
|
Telephone call | | | 1/10/2013 | | |
|
|
|
1-10-13 called Heidi Roberts, occupancy ready for pick up ///dld
|
Issue PAID IN FULL permit | | | 1/10/2013 | | DONE |
Tisha Gallop
|
|
|
|
Plan assigned to (TLW) | 1/8/2013 | | 1/10/2013 | | DEFR |
Tim L. Woodard
|
|
|
Defered to Carl Madsen
|
Routing - PLAN CHECK | 1/8/2013 | | 1/10/2013 | | PASS |
Carl D Madsen
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 1/8/2013 | | |
|
|
|
1-8-13 ok per Tim W to take in
|
First Notice | | 2/18/2013 | | | |
|
|
|
|
Application received | | 1/8/2013 | | | |
|
|
|
|