Third Notice | | 8/4/2013 | 8/10/2013 | | DONE |
|
|
|
This permit finaled on the web by Chris Eby
|
Third Notice | | 7/7/2013 | 7/30/2013 | | DONE |
|
|
|
mailed
|
Third Notice | | 6/16/2013 | 7/2/2013 | | DONE |
|
|
|
mailed
|
Second Notice | | 5/3/2013 | 6/11/2013 | | DONE |
|
|
|
Mailed 6-11-13
|
First Notice | | 4/12/2013 | 4/23/2013 | | DONE |
|
|
|
Mailed 4-24-13
|
BLD-Final | 4/2/2013 | 4/2/2013 | 4/2/2013 | P | PASS |
Tony Young
|
|
|
blake Phone #: ###-####,, perm occ. ok now
|
Permanent Occupancy | | | 4/2/2013 | | DONE |
Tisha Gallop
|
|
|
|
BLD-Final | 3/19/2013 | 3/20/2013 | 3/20/2013 | P | PART |
Tony Young
|
|
|
Chris Phone #: ###-####,,temp ok
|
FIRE-Final Inspection | 3/19/2013 | 3/20/2013 | 3/20/2013 | A | PASS |
Troy Cobbley
|
|
|
Life safety passed. Occupant load sign to be posted prior to building inspection
|
Temporary Occupancy | 3/20/2013 | 6/18/2013 | 3/20/2013 | | DONE |
Tisha Gallop
|
|
|
|
Routing PW Environmental | 3/19/2013 | | 3/19/2013 | | PASS |
Walt Baumgartner
|
|
|
Ok for FINAL, Ok for CofO, all PW Pretreatment requirements are satisfied. Call Walt 3991 w/ any questions.
|
BLD-Framing/Rough-in | 3/8/2013 | 3/8/2013 | 3/8/2013 | P | PASS |
Jim Sly
|
|
|
steel stud sofit framed above the couter tops please-Chris Phone #: ###-####
|
Override - Parcel Holds | 3/8/2013 | 1/1/1900 | 3/8/2013 | | |
|
|
|
scheduling framing inspection
|
Meeting | | | 3/1/2013 | | DONE |
Sam Zahorka
|
|
|
Meeting with owner of the company, Kim Johnson, and myself. Identified the required ESC permit for the grease interceptor work required by Wault Baumgartner / Enviromental. Helped the applicant through the ESC permit process.
|
Permit Ready to Issue | | | 2/22/2013 | | DONE |
Barbara Stitt
|
|
|
|
Print Occupancy Form | | | 2/22/2013 | | DONE |
Barbara Stitt
|
|
|
|
Issue PAID IN FULL permit | | | 2/22/2013 | | DONE |
Barbara Stitt
|
|
|
|
Routing PW Environmental | 2/21/2013 | | 2/21/2013 | | PASS |
Tim L. Woodard
|
|
|
Approved E plan
|
Routing - PLUMBING | 2/21/2013 | | 2/21/2013 | | PASS |
Tim L. Woodard
|
|
|
Approved in e plan
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/21/2013 | | DONE |
Tim L. Woodard
|
|
|
|
Routing Off Site - C.D.H | 2/5/2013 | | 2/21/2013 | | PASS |
Tim L. Woodard
|
|
|
Approved
|
Plan assigned to (TLW) | 1/22/2013 | | 2/21/2013 | | PASS |
Tim L. Woodard
|
|
|
|
Routing PW Environmental | 2/20/2013 | | 2/20/2013 | | FAIL |
Walt Baumgartner
|
|
|
Resubmitted equipment plan plumbing sheet not stamped by Musgrove Engineering. Plan sheet shows GI w/ triple sink and DW routed to GI. Floor sink under planned Class 1 hood and mop sink need to be routed to GI. New plan sheet required stamped by engineer.
|
Routing - PLUMBING | 2/20/2013 | | 2/20/2013 | | FAIL |
Bill VanDegrift
|
|
|
pass public works pretreatment review prior to plumbing review on changes to original design.
|
Routing PW Environmental | 1/22/2013 | | 1/31/2013 | | FAIL |
Walt Baumgartner
|
|
|
Outside inground grease interceptor required for triple sink, dishwasher, exisiting mop sink and floor sink under class 1 hood.
|
Routing PW Solid Waste | 1/22/2013 | | 1/31/2013 | | PASS |
Peter J. McCullough
|
|
|
No review required per E-plan review. TLW
|
1st review completed | | | 1/31/2013 | | DONE |
Tim L. Woodard
|
|
|
|
Routing - PLAN CHECK | 1/22/2013 | | 1/31/2013 | | PASS |
Tim L. Woodard
|
|
|
Approved with Redlines in E-Plan Review. TLW
|
Routing - PLUMBING | 1/22/2013 | | 1/31/2013 | | PASS |
Bill VanDegrift
|
|
|
Approved with comments in E-Plan Review. TLW
|
Routing PW Sewer Rating | 1/22/2013 | | 1/23/2013 | | PASS |
Connie Baumgartner
|
|
|
|
Payment Received | | | 1/22/2013 | | DONE |
|
|
|
Payment received via Govolutions
|
Intake Approval | | | 1/22/2013 | | PASS |
Tim L. Woodard
|
|
|
|
Routing - PUBLIC WORKS | 1/22/2013 | | 1/22/2013 | | PASS |
Beverly Mountain
|
|
|
|
Routing - Addressing | 1/22/2013 | | 1/22/2013 | | PASS |
Jason C. Taylor
|
|
|
|
Intake Approval | | | 1/10/2013 | | FAIL |
Tim L. Woodard
|
|
|
Blake,
Plans look good. There are a couple of procedural errors that need corrected though. First, plan sheets all need to be uploaded into the "Drawings" folder within the eplan review case. Second, drawing sheets MG1, M1.0, and M2.0 must be uploaded individually vs as a package. Last thing, the #518 Minor TI Submittal Checklist must be filled out and uploaded to the Documents folder.
Please call with any questions,
Tim Woodard
|
Application received | | | 1/9/2013 | | DONE |
|
|
|
Application submitted via PDS Online on Jan 9 2013 9:47AM
|