Permit Information
Permit NumberBLD13-00042
StatusFinaled
Name PATRICK AND JAMIE TIERNEY
Site Address 106 N CASTELLO PL
Project NameTierney Residence
Customer Number 
ePlanReviewNo
Description
WUI ZONE A, FIRE SPRINKLER SYSTEM REQUIRED, 7/22/15 ENGINEERED REVISONS TO DECK, **AJS**PLAN MODIFICATION FOR REVISED GRADING AND ENGINEERED RETAINING WALLS **AJS** 4/14/15Permit for the construction of a new 5,886 sq. ft. single family dwelling (first story 4,003 sq. ft., and 1,883 sq. ft. finished basement) with 6 bedrooms, 5.5 bathrooms, approximately 1,495 sq. ft. of covered patio/porch and a 1,178 sq. ft. attached garage per the approved plans, perscriptive energy, attached initial structural engineering, attached revised engineering, attached suplimental engineering, plan review report and any notations. A-1 zoning and setbacks per planning. AJS
Per a 01-19-1999 meeting of the Boise City Council and a follow up commentary letter dated 01-22-1999, item 7, the home is required to have a modified NFPA 13D fire sprinkler systems. In addition, to the NFPA 13D requirmenets all closets, bathrooms and attached garages are to be sprinklered. - TRF - A letter from the applicant’s geotechnical engineer indicating that the footing subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at 384-3946

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Jason Taylor at 384-3946.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Case Summary (BLD)  11/15/2018 DONE
Case Summary (BLD)  11/15/2018 DONE
Case Summary (BLD)  11/15/2018 DONE
DetailsAdele J Schaffeld-Griffin
Case Summary (BLD)  10/7/2016 DONE
Case Summary (BLD)  9/19/2016 DONE
Letter of compliance/Occupancy  5/2/2016 DONE
Case Summary (BLD)  4/26/2016 DONE
BLD-Final12/3/201512/3/201512/3/2015PDONE
DetailsBob Archibald
All corrective provisions completed. Swimming pool will be finaled under its own permit #BLD13-03079.
DOC - C/O Approved  12/3/2015 DONE
PubWorks Occupancy Approval10/9/201510/9/201510/9/2015 DONE
DetailsJason C. Taylor
All site work and stabilization activities (retaining walls, hyrdo-mulch, rock mulch, etc.) as been completed. Site is finished and is approved for occupancy. Jason Taylor ###-####
SUPER- Supervisor's review10/1/201510/1/201510/1/2015 PEND
DetailsBob Archibald
All items listed on CN dated 4-25-14 with exception of public works approval on drainage and tennis court have been completed.
Routing PW Grading-Hillside8/7/2015 8/7/2015 PASS
DetailsJason C. Taylor
Recieved structural engineers calculations for retaining wall construction. Alos, recieved verification from RPC that existing wall was built with a keyway. Wall is approved as constructed based on evidence provided. Jason Taylor ###-####.
BLD-Framing/Rough-in7/31/20158/3/20158/4/2015PPASS
DetailsDave Hannah
Deck framing/repair. Lee @###-####
OVERRIDE  7/22/2015  
Plan assigned to (AJS)7/17/20157/17/20157/22/2015 PASS
DetailsAdele J Schaffeld-Griffin
Routing - PLAN CHECK7/17/2015 7/22/2015 PASS
DetailsAdele J Schaffeld-Griffin
deck revisions
Telephone call  7/22/2015 DONE
Called Patrick to let know plan mod is ready and how much is owed-please do no re-issue the permit
CHANGE STATUS TO (ISS)  7/22/2015 DONE
DetailsChristina Prado
PLANS/APPL TAKEN TO FRONT DESK  7/22/2015 DONE
Permit Ready to Issue  7/22/2015 DONE
please do in re-issue
Telephone call  7/21/2015 DONE
called homeowner Patrick Tierney to let him know that his plan modification for the retaining wall was ready to be picked up and fees due.
Plan Modification Accepted  7/17/2015 DONE
DetailsChristina Prado
Plan mod accepted for additional retaining wall modiications. Three sets of sheets C1.00 & C2.00 and three sets of revised structural calcs were accepted
Routing PW Grading-Hillside7/17/2015 7/17/2015 PASS
DetailsJason C. Taylor
A letter from the applicant’s geotechnical engineer indicating that the wall subgrade is acceptable must be approved by Public Works. Call Jason Taylor at ###-####
BLD-Conference7/16/20157/16/20157/16/2015APEND
DetailsBob Archibald
Informed Nate and Patrick that 17 Fire Marshal approved soffit vents would be required
BLD-Conference7/8/20157/8/20157/9/2015APEND
DetailsBob Archibald
Dave Hannah and I met with Legacy, roofing contractors, structural engineer and current contractor in regard to requirements for structural engineering on patio deck,10 ft retaining wall and attic space ventilation requirements. Structural engineer will provide design calcs for both deck and retaining wall and roofing contractor to provide attic ridge vent dimensions for calculation of additional soffit or roof venting.
PubWorks Subgrade Approval6/15/20156/15/20156/15/2015 DONE
DetailsJason C. Taylor
* FRONT RETAINING WALLS (ROCKERY) CLSM FOOTING***A letter from the applicant’s geotechnical engineer indicating that the footing subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.

CHANGE STATUS TO (ISS)  4/16/2015 DONE
OVERRIDE  4/14/2015  
Plan assigned to (AJS)3/19/20153/19/20154/14/2015 PASS
DetailsAdele J Schaffeld-Griffin
waiting on complete submittal for retaining walls and grading. Tierny Residence
Case Summary (BLD)  4/14/2015 DONE
DetailsAdele J Schaffeld-Griffin
Routing - PLAN CHECK4/14/2015 4/14/2015 PASS
DetailsAdele J Schaffeld-Griffin
exterior site only
PLANS/APPL TAKEN TO FRONT DESK  4/14/2015 DONE
Permit Ready to Issue  4/14/2015  
All requirements met****DO NOT RE ISSUE*******
Telephone call  4/14/2015 DONE
called Jason to let know plan mod was ready and how much is owed, Left message on his phone at office
Plan Modification Accepted  4/13/2015 DONE
plan mod received-1 transmittal & 3 sheets of C2.00-took to Adele S
Routing PW Grading-Hillside4/13/2015 4/13/2015 PASS
DetailsJason C. Taylor
A letter from the applicant’s geotechnical engineer indicating that the retaining wall footing subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at ###-####

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Jason Taylor at ###-####.
Routing PW Grading-Hillside4/10/2015 4/10/2015 FAIL
DetailsJason C. Taylor
Need 2 additoal copies of grading and driange plan. S1.1
Plan resubmittals received  4/7/2015 DONE
received 3 copies of sheet S1.1- put on Adele's desk
Routing PW Grading-Hillside3/27/2015 4/2/2015 FAIL
DetailsJason C. Taylor
Plans need revised to include retaining wall drainage details. Jason Taylor ###-####.
Plan resubmittals received  3/27/2015 DONE
DetailsCandy A. Nichols
resubmittals recieved plan review response transmittal,2 boulder retaining wall calcs, 2 supplimental struc calcs, 3 sets of sheet C1.00, C2.00-2 sets of sheet S1.1 & took to Adele S
Plan resubmittals received  3/19/2015 DONE
received 3 copies of sheets C1.00 and C2.00- put on Adele's desk
Plan Reviewer's activity  3/19/2015 DONE
DetailsAdele J Schaffeld-Griffin
sheets recieved on 3/19/15 were grading and drainiage plans only, will route to PW.
Meeting  2/25/2015 DONE
DetailsJason Blais
Meeting with Todd Weltner of Vertical Construction and several folks from the Land Group. Discussed new proposals and requirements to correct the site grading and retaining walls on the site. Legacy Homes, however, is still responsible for correcting outstanding items in or on the house itself.
Change Expiration Date Only  12/16/2014 DONE
DetailsJason Blais
Plan Reviewer's activity  12/16/2014 DONE
DetailsJason Blais
Phone call with owner Patrick Tierney. Still working through civil mediation in hopes to find resolution to have outstanding items completed with the project. Patrick will send an email request for an extension on the permit.
BLD-Other4/25/20144/25/20144/25/2014PPEND
DetailsBob Archibald
Correction Notice emailed to contractor.
BLD-Conference4/23/20144/23/20144/23/2014PDONE
DetailsBob Archibald
Site visit and review with all trades.
BLD-Final3/19/20143/20/20143/21/2014PFAIL
DetailsDave Hannah
david Phone #: ###-#### tempered glass front door hill side signoff
Plan Modification Accepted  2/10/2014 DONE
new manual j
Routing - MECHANICAL2/10/2014 2/10/2014 PASS
DetailsTroy James
resubmitted manual j
BLD-Energy code compliance10/17/201310/17/201310/18/2013PPASS
DetailsDave Hannah
David Phone #: ###-####
BLD-Framing/Rough-in10/15/201310/15/201310/15/2013PPASS
DetailsDave Hannah
david Phone #: ###-####
BLD-Foundation10/14/201310/15/201310/15/2013APASS
DetailsDave Hannah
retaining wall // Josh Phone #: ###-####
BLD-Wall Bracing10/15/201310/15/201310/15/2013APASS
DetailsDave Hannah
david Phone #: ###-####
BLD-Framing/Rough-in10/11/201310/14/201310/15/2013PPART
DetailsDave Hannah
david Phone #: ###-#### shear ok to cover ext but still needs a mec rough in inspection
BLD-Footing10/11/201310/14/201310/14/2013APASS
DetailsDave Hannah
after 10 // call before// footing for retaining wall // Josh Phone #: ###-####
BLD-Framing/Rough-in10/9/201310/10/201310/11/2013PNR
DetailsDave Hannah
david Phone #: ###-#### needs mec rough in and plumbing rough in
BLD-Framing/Rough-in10/8/201310/9/201310/9/2013PCANC
DetailsDave Hannah
dAVID hiCKS Phone #: ###-#### // cancelled per David, will call back to reschedule
BLD-Foundation10/7/201310/8/201310/8/2013APART
DetailsJim Sly
Josh Phone #: ###-####
OK to pour retaining wall located furthest East. Engineer Brian Sielaff OK'd # 5 horiz. in lieu of # 6 as shown on plan. Stamped letter verified. Called Mike J. He gave me a verbal that rebar in footing was OK'd by him.........He was waiting for approval of subgrade from Geotech.
PubWorks Subgrade Approval10/1/201310/1/201310/1/2013 DONE
DetailsJason C. Taylor
A letter from the applicant’s geotechnical engineer indicating that the retaining wall footing subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
BLD-Footing9/27/20139/27/20139/27/2013ANR
DetailsMike Jordan
josh Phone #: ###-####. East retaining wall per engineering and RFI. No concrete is allowed at this time. No approval on geotech report.
BLD-Footing9/24/20139/24/20139/24/2013PCANC
DetailsJim Sly
josh Phone #: ###-####
Canc by Contr.
PubWorks Subgrade Approval7/11/20137/11/20137/11/2013 DONE
DetailsJason C. Taylor
Recieved subgrade approval from geotechnical engineer for the column pads on the north side of the residence. Building department may be scheduled for footing inspections. Jason Taylor ###-####.
BLD-Foundation6/27/20136/28/20136/28/2013APASS
DetailsDave Hannah
found wall//Josh Phone #: ###-####
BLD-Other6/14/20136/17/20136/18/2013APART
DetailsDave Hannah
early am please//rebar//Josh Phone #: ###-#### first wall poor ok
BLD-Footing6/11/20136/11/20136/12/2013PPASS
DetailsDave Hannah
Josh Phone #: ###-####
BLD-Footing6/10/20136/11/20136/11/2013ANR
DetailsDave Hannah
Josh Phone #: ###-####
BLD-Footing6/5/20136/6/20136/6/2013APART
DetailsDave Hannah
Josh Phone #: ###-#### basement ftgs and garage ftgs ok
PubWorks Subgrade Approval6/5/20136/5/20136/5/2013 DONE
DetailsJason C. Taylor
Recieved subgrade approval from geotechnical engineer (MTI) for northeast basement corner footings. Building department may be scheduled for inspections. Jason Taylor ###-####
PubWorks Subgrade Approval6/4/20136/4/20136/4/2013 DONE
DetailsJason C. Taylor
Recieved engineers approval for basement, garage, and colum pads for south side of residence. Footings in crawl space on north side of residence were not approved. Placement of concrete elements in the approved areas can be scheduled with the building department. Jason Taylor ###-####.
Issue PAID IN FULL permit  5/14/2013 DONE
OVERRIDE  5/6/2013  
Plan assigned to (AJS)3/11/20133/11/20135/6/2013 PASS
DetailsAdele J Schaffeld-Griffin
1ST REVIEW COMPLETED 3-20-13 /second plan review - re submittal recieved 4/26/13 comments sent 5-1-13 via email to Nate
Meeting  5/6/2013 DONE
DetailsAdele J Schaffeld-Griffin
Met with Dave and he picked up the 2 sets fo revised plans that were dropped off 5/3/13 to get engineers stamp and corrections made to structural portion of the plans.
Routing - PLAN CHECK5/6/2013 5/6/2013 PASS
DetailsAdele J Schaffeld-Griffin
Case Summary (BLD)  5/6/2013 DONE
DetailsAdele J Schaffeld-Griffin
PLANS/APPL TAKEN TO FRONT DESK  5/6/2013 DONE
Inspection Record Card- Bld  5/6/2013 DONE
DetailsChristina Prado
Telephone call  5/6/2013 DONE
DetailsChristina Prado
called Nate to advise permit is ready for pick up and gave fees due
Override - Parcel Holds  5/6/2013  
Permit Ready to Issue  5/6/2013 DONE
DetailsChristina Prado
Plan resubmittals received  5/3/2013 DONE
DetailsChristina Prado
eceived two copies of structural calcs and two copies of plan sheets 0.1, 0.2, 0.3, C1.0, C2.0, C3.0, C4.0, C5.0, S1.0, 1.1, 1.2, 2.1, 2.2, 3.1, 3.2, 4.1, 4.2, 4.3, 5.1, 5.2; taken to Adele.
Routing - PLAN CHECK4/29/2013 5/1/2013 FAIL
DetailsAdele J Schaffeld-Griffin
see second plan review comments in documents
Routing - MECHANICAL4/30/2013 4/30/2013 PASS
DetailsTroy James
Routing - MECHANICAL4/29/2013 4/29/2013 FAIL
DetailsTroy James
emailed corrections to Integrity Heating
Routing PW Grading-Hillside4/25/2013 4/26/2013 PASS
DetailsJason C. Taylor
A letter from the applicant’s geotechnical engineer indicating that the footing sub-grade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at ###-####

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Jason Taylor at ###-####.
Routing - PLANNING4/24/2013 4/25/2013 PASS
DetailsDavid Moser
Approved as redlined; The chimneys shall not exceed 35 feet in height. The chimneys need to be removed or relocated so they comply with the height limit of the A-1 zone
Plan resubmittals received  4/24/2013 DONE
DetailsTisha Gallop
received two copies of structural calcs and three copies of plan sheets 0.1, 0.2, 0.3, C1.0, C2.0, C3.0, C4.0, C5.0, S1.0, 1.1, 1.2, 2.1, 2.2, 3.1, 3.2, 4.1, 4.2, 4.3, 5.1, 5.2; taken to Adele.
Routing - Erosion and Sediment3/22/2013 3/26/2013 PASS
DetailsKimberly M. Johnson
recieved revised plans routed to KMJ 3/22/13 ajs
Plan resubmittals received  3/22/2013 DONE
DetailsTisha Gallop
received two copies of narrative in binder and three copies of plan sheet C5.0; taken to Adele.
1st review completed  3/21/2013 FAIL
DetailsAdele J Schaffeld-Griffin
Routing - PLAN CHECK3/20/2013 3/20/2013 FAIL
DetailsAdele J Schaffeld-Griffin
Emailed comments to Nate and Doug 3/21/13 also include WUI requirments. See documents for plan review letter sent.
Routing - FIRE3/18/2013 3/20/2013 PASS
DetailsScott Arellano
FIRE SPRINKLERS REQUIRED
Notes on plat, item 7, the home is required to have a modified NFPA 13D fire sprinkler systems. In addition, to the NFPA 13D requirmenets all closets, bathrooms and attached garages are to be sprinklered
Routing - Erosion and Sediment3/15/2013 3/18/2013 FAIL
DetailsKimberly M. Johnson
LM for applicant; need ESC narrative
Routing - PUBLIC WORKS3/11/2013 3/15/2013 PASS
DetailsConnie Baumgartner
Routing - MECHANICAL3/15/2013 3/15/2013 FAIL
DetailsTroy James
emailed corrections to brownco
Routing - PLANNING3/15/2013 3/15/2013 FAIL
DetailsDavid Moser
CFH13-00007 Hillside Application is not complete.
Routing - Addressing3/11/2013 3/14/2013 PASS
DetailsJason C. Taylor
Routing PW Grading-Hillside3/11/2013 3/14/2013 FAIL
DetailsJason C. Taylor
CFH pending. Grading plan is preliminary, need final grading plan to proceed. Jason Taylor ###-####.
Plan resubmittals received  3/14/2013  
3-14-13 received 3 copies of sheet C2.0 sent to Adele
Route to Impact Fee Review3/11/20133/14/20133/12/2013 PASS
DetailsCindy M. Gould
Intake Approval  3/11/2013 PASS
DetailsTisha Gallop
Recd Pcfee & Taken To Pln CK  3/11/2013 DONE
DetailsTisha Gallop
Application received 1/9/20131/9/2013 DONE
DetailsBarbara Stitt
Intake Approval  1/9/2013 FAIL
DetailsBarbara Stitt