Information based on query as of Wednesday, July 24, 2024.
Permit Information
Permit NumberBLD13-00055
StatusFinaled
Name BOISE CITY GOVERNMENT BUILDINGS
Site Address 150 N CAPITOL BLVD
Project NameCity Hall -4th floor -Legal
Customer Number 
ePlanReviewNo
Description
(City Hall -4th floor -Legal security door) Permit is to remodel existing offices area by adding a security door and additional doorways. Approval per approved plans on file and attached alternate letter. Work to include: construction of interior non-bearing walls to infill openings and to frame in new security door, relocating exit lights, installation of new hardware (in accordance with attached alternate), and interior finishes in compliance with chapter 8 of the 2009 IBC. This building is fully Fire Sprinklered with an approved Fire Alarm system. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. **TLW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice 10/5/201310/11/2013 DONE
Third Notice 9/3/20139/30/2013 DONE
e-mailed Scott Canning
Third Notice 8/4/20138/29/2013 DONE
e-mailed to Scott Canning
Third Notice 7/6/20137/30/2013 DONE
e-mailed to Scott Canning
Second Notice 5/2/20137/1/2013 DONE
DetailsTisha Gallop
e-mailed to Scott Canning
First Notice3/21/20133/21/20134/22/2013 DONE
DetailsDave Hannah
interoffice mail to Scott Canning/Govt. Bldgs.
BLD-Final3/20/20133/21/20133/21/2013APASS
DetailsDave Hannah
Rich-Please call prior to inspection Phone #: ###-####
DOC - Permit Finaled3/21/20133/21/20133/21/2013PPASS
DetailsDave Hannah
FIRE-Final Inspection3/21/20133/21/20133/21/2013APASS
DetailsForrest France
Fire alarm work completed under FIR13-00123. Fire life safety passed.
FIRE-Conference3/15/20133/15/20133/15/2013ADONE
DetailsForrest France
On site meeting with Rich from Govt. buildings, T. Gainor and J. Blais regarding conditions per IFC for delayed egress. Verified new exit signs and EM lighting have been installed per previous inspection. Determined tie in to the FA system is also required unless verification of an alternate approval is provided.
FIRE-Final Inspection3/14/20133/14/20133/14/2013PFAIL
DetailsForrest France
Missing exit signs per plan red-lines, provide EM lighting at the new door, must meet IFC conditions for delayed egress.
BLD-Framing/Rough-in1/18/20131/22/20131/22/2013APART
DetailsBob Archibald
rich Phone #: ###-#### please call 30 min before going out Framing adjacent to reception desk approved for cover
Override - Parcel Holds1/18/20131/1/19001/18/2013  
for bld ri only
Plans ACCEPTED BY PLAN TECH  1/14/2013 DONE
DetailsChristina Prado
Intake Approval  1/14/2013 PASS
DetailsTim L. Woodard
Recd Pcfee & Taken To Pln CK  1/14/2013 DONE
DetailsChristina Prado
Plan assigned to (TLW)1/14/2013 1/14/2013 PASS
DetailsTim L. Woodard
Routing - PLAN CHECK1/14/2013 1/14/2013 PASS
DetailsTim L. Woodard
1st review completed  1/14/2013 DONE
DetailsTim L. Woodard
PLANS/APPL TAKEN TO FRONT DESK  1/14/2013 DONE
DetailsTim L. Woodard
Case Summary (BLD)  1/14/2013 DONE
DetailsTim L. Woodard
Inspection Record Card- Bld  1/14/2013 DONE
Permit Ready to Issue  1/14/2013  
Issue & PRINT to be Invoiced  1/14/2013  
Application received 1/14/2013