Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD13-00081
StatusFinaled
Name STEED CONSTRUCTION
Site Address 1445 W COMMERCE AVE
Project NameHayden Beverage Office Remodel
Customer Number 
ePlanReviewNo
Description
(HAYDEN BEVERAGE – Office Remodel) This building is fire sprinklered for unlimited area provisions. Permit is to add rearrange existing office space. Work is to include: construction of new interior non-bearing walls to create three new offices and one new conference room, miscellaneous electrical, miscellaneous mechanical, installation of new accessible doors / hardware, and interior finishes. This building is fully Fire Sprinklered with an approved Fire Alarm system. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. **TLW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Second Notice 5/3/20136/4/2013 DONE
6-5-13 - mailed
First Notice 4/22/20134/23/2013 DONE
BLD-Final4/9/20134/12/20134/12/2013PPASS
DetailsJim Storey
>> Inspection requested via web by Gary Band na on mech no work performed. 301 final ok l/c
FIRE-Final Inspection4/11/20134/12/20134/12/2013APASS
DetailsForrest France
Fire life safety inspection completed satisfactory.
Letter of compliance/Occupancy  4/12/2013 DONE
DetailsTisha Gallop
DOC - Permit Finaled  4/12/2013 DONE
FIRE-Final Inspection4/4/20134/5/20134/5/2013APART
DetailsForrest France
Fire life safety appears satisfactory however no plans could be located on site- phone contact unavailable. Some finishes underway.
FIRE-Sprinkler Rough-in4/4/20134/4/20134/4/2013APART
DetailsForrest France
BLD-Final4/4/20134/4/20134/4/2013PPART
DetailsJim Storey
Questions Gary @ ###-#### Thanks Jim >> Inspection requested via web by Gary Band need saftey glazing installed/ fire signed off
BLD-Final4/3/20134/3/20134/3/2013PCANC
DetailsJim Storey
Gary Band ###-#### >> Inspection requested via web by Gary Band Inspection cancelled from web by: Gary Band
BLD-Ceiling Grid Inspection3/28/20133/28/20133/28/2013PPASS
DetailsJim Storey
>> Inspection requested via web by Gary Band
BLD-Framing/Rough-in3/11/20133/11/20133/11/2013PPASS
DetailsJim Storey
light remodel to pre-existing interior walls Phone #: ###-#### >> Inspection requested via web by Gary Band
BLD-Wall cover3/11/20133/11/20133/11/2013PPASS
DetailsJim Storey
light remodel to pre-existing interior walls Phone #: ###-#### >> Inspection requested via web by Gary Band
Issue PAID IN FULL permit  1/29/2013 DONE
Issue PAID IN FULL permit  1/29/2013 DONE
Inspection Record Card- Bld  1/28/2013 DONE
DetailsChristina Prado
Permit Ready to Issue  1/28/2013 DONE
DetailsTisha Gallop
Telephone call  1/28/2013 DONE
DetailsTisha Gallop
called Kevin and told him permit is ready, fee due and need GC form.
Plan assigned to (TLW)1/22/2013 1/25/2013 PASS
DetailsTim L. Woodard
Routing - PLAN CHECK1/22/2013 1/25/2013 PASS
DetailsTim L. Woodard
1st review completed  1/25/2013 DONE
DetailsTim L. Woodard
PLANS/APPL TAKEN TO FRONT DESK  1/25/2013 DONE
DetailsTim L. Woodard
Case Summary (BLD)  1/25/2013 DONE
DetailsTim L. Woodard
Plans ACCEPTED BY PLAN TECH  1/22/2013  
ok per Tim W to take in as a level 1
Application received 1/16/2013