Permit Information
Permit NumberBLD13-00120
StatusFinaled
Name CARLSON MATERIAL HANDLING
Site Address 7185 W BETHEL ST
Project NameDARIGOLD-RACKING
Customer Number 
ePlanReviewNo
Description
(DARIGOLD)(RACKING) To replace existing racking and install new steel storage racking exceeding a height of 8' within the annex building; Add standard selective pallet racks and replace racking on the South wall with new drive in racks per approved plans and structural engineering. SPECIAL INSPECTIONS ARE REQUIRED. Each unit will be bolted to the floor and have more than 36" isles between rows. The design, testing and utilization of industrial steel storage racks shall be in accordance with the RMI/ANSI MH 16.1. A Letter of Completion is to be issued when done. The existing envelope is not being affected by this permit. Original tenant permit completed under BLD10-01273. EACH RACKING SYSTEM SHALL HAVE A PLAQUE LOCATED AT EACH RACKING SYSTEM STATING THE MAXIMUM WEIGHT TO BE STORED ON THAT PERTICULAR RACKING SYSTEM PER THE ENGINEERS CRITERIA STATED ON THE PLANS FOR EACH RACKING SYSTEM. NOTE: Both buildings are fully fire sprinklered for for allowable area increase and high piled storage for occupancy use group "S1" requirements. Any alterations or modifications to the buildings Fire Sprinkler WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 as regulated by the Boise Fire Department." **SRZ**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Second Notice 3/31/20133/28/2013 DONE
DetailsChristina Prado
complete 3-28-13
First Notice3/11/20133/11/20133/21/2013 DONE
DetailsTom Arcoraci
mailed 3-22
BLD-Final3/8/20133/11/20133/11/2013APASS
DetailsTom Arcoraci
Kelly Phone #: ###-####
DOC - Permit Finaled3/11/20133/11/20133/11/2013PPASS
DetailsTom Arcoraci
FIRE-Final Inspection3/8/20133/11/20133/11/2013APASS
DetailsTroy Cobbley
Life safety passed. Max storage height per the sprinkler analyzis letter is 25'
Issue PAID IN FULL permit  2/12/2013 DONE
Plan assigned to (SRZ)1/25/20131/25/20132/8/2013 PASS
DetailsSam Zahorka
1st Review completed. Level 2 - Racking
Routing - PLAN CHECK2/4/2013 2/8/2013 PASS
DetailsSam Zahorka
PLANS/APPL TAKEN TO FRONT DESK  2/8/2013 DONE
DetailsSam Zahorka
Inspection Record Card- Bld  2/8/2013 DONE
Permit Ready to Issue  2/8/2013 DONE
DetailsTisha Gallop
Telephone call  2/8/2013 DONE
DetailsTisha Gallop
called Kelly and left vm at Carlson Material Handling that permit is ready and fee.
Plan resubmittals received  2/7/2013 DONE
DetailsChristina Prado
received one copy og Bld plan review notes and two copies of letter from Treasure Valley Fire Portection; routed to Sam for review
Routing - FIRE  2/7/2013 PASS
DetailsScott Arellano
Attached IFC comments to plans.
Routing - FIRE2/1/2013 2/4/2013 FAIL
DetailsScott Arellano
Emailed applicant resubmittal items.
1st review completed  2/4/2013 FAIL
Failed Fire. A building Fire Sprinkler system design analysis is required.
Routing - PLAN CHECK1/25/2013 2/1/2013 PASS
DetailsSam Zahorka
Application received 1/25/20131/25/2013 DONE
DetailsBarbara Stitt
Recd Pcfee & Taken To Pln CK  1/25/2013 DONE
DetailsBarbara Stitt
Plans ACCEPTED BY PLAN TECH  1/25/2013 DONE
DetailsBarbara Stitt
Intake Approval  1/25/2013 PASS
DetailsTim L. Woodard
Pending Assignment by JCB1/25/2013 1/25/2013 DONE
DetailsJason Blais