Print Statement | | | 9/18/2014 | | DONE |
Tisha Gallop
|
|
|
e-mailed to Duel Christensen at Anderson Const.
|
First Notice | | 7/27/2014 | 9/2/2014 | | DONE |
|
|
|
e-mailed to Patrick Boel and Duel Christensen @ Anderson Const
|
BLD-Final | 7/15/2014 | 7/17/2014 | 7/17/2014 | P | PASS |
Bob Archibald
|
|
|
inspection for temp CO // Jim (or Patrick ###-####) Phone #: ###-####. Ok for final occupancy.
|
FIRE-Final Inspection | 7/15/2014 | 7/17/2014 | 7/17/2014 | P | PASS |
Craig D. Hanson
|
|
|
due to rearragngement of door to back pedicure room, exit sign not needed from back hall. relocated sign to North side of collums.
|
Permanent Occupancy | | | 7/17/2014 | | DONE |
Tisha Gallop
|
|
|
|
BLD-Ceiling Grid Inspection | 6/16/2014 | 6/17/2014 | 6/17/2014 | A | PASS |
Jim Storey
|
|
|
Jim Phone #: ###-#### ok to cover ceilling
|
BLD-Framing/Rough-in | 6/9/2014 | 6/9/2014 | 6/9/2014 | P | PASS |
Dave Hannah
|
|
|
Jim-Ceiling tile inspection Phone #: ###-####
|
BLD-Ceiling Grid Inspection | 6/2/2014 | 6/3/2014 | 6/3/2014 | A | NR |
Dave Hannah
|
|
|
Jim Phone #: ###-####
|
BLD-Ceiling Grid Inspection | 5/19/2014 | 5/20/2014 | 5/20/2014 | A | PASS |
Dave Hannah
|
|
|
Jim Phone #: ###-####
|
BLD-Ceiling Grid Inspection | 5/14/2014 | 5/15/2014 | 5/15/2014 | A | NR |
Jim Storey
|
|
|
Jim-behive area Phone #: ###-####
|
BLD-Framing/Rough-in | 3/26/2014 | 3/26/2014 | 3/26/2014 | A | PASS |
Dave Hannah
|
|
|
ok to cover int walls
|
BLD-Energy code compliance | 3/25/2014 | 3/26/2014 | 3/26/2014 | A | PASS |
Dave Hannah
|
|
|
Jim Phone #: ###-####
|
BLD-Conference | 2/25/2014 | 2/26/2014 | 2/27/2014 | A | PASS |
Dave Hannah
|
|
|
per Bob check progress of work. No inspections have been scheduled work in progress
|
Print Occupancy Form | | | 9/10/2013 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 9/10/2013 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 8/23/2013 | | DONE |
Barbara Stitt
|
|
|
|
Print Occupancy Form | | | 8/23/2013 | | DONE |
Barbara Stitt
|
|
|
|
Print Occupancy Form | | | 8/23/2013 | | DONE |
Barbara Stitt
|
|
|
|
Routing - PLAN CHECK | 7/30/2013 | | 7/30/2013 | | PASS |
Tim L. Woodard
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/30/2013 | | DONE |
Tim L. Woodard
|
|
|
|
Plan assigned to (TLW) | 2/22/2013 | | 7/30/2013 | | PASS |
Tim L. Woodard
|
|
|
1st Review Completed. TLW
|
Routing - MECHANICAL | 7/23/2013 | | 7/23/2013 | | PASS |
Troy James
|
|
|
eplan
|
1st review completed | | | 3/7/2013 | | DONE |
Tim L. Woodard
|
|
|
|
Routing - PLAN CHECK | 2/22/2013 | | 3/7/2013 | | PASS |
Tim L. Woodard
|
|
|
Refer to change marks in e-plan review
|
Routing - PLUMBING | 2/22/2013 | | 2/26/2013 | | PASS |
Bill VanDegrift
|
|
|
1) new water piping shall not overload existing system.
2) pedicure stations must be installed according to manufacturers instructions.
|
Routing - MECHANICAL | 2/22/2013 | | 2/25/2013 | | FAIL |
Troy James
|
|
|
corrections noted on eplan
|
Routing - PUBLIC WORKS | 2/22/2013 | | 2/25/2013 | | PASS |
Connie Baumgartner
|
|
|
|
Routing - Addressing | 2/22/2013 | | 2/25/2013 | | PASS |
Jason C. Taylor
|
|
|
|
Payment Received | | | 2/22/2013 | | DONE |
|
|
|
Payment received via Govolutions
|
Intake Approval | | | 2/22/2013 | | PASS |
Tim L. Woodard
|
|
|
|
Intake Approval | | | 2/1/2013 | | FAIL |
Tim L. Woodard
|
|
|
Matt,
Please upload engineered plumbing plans or talk with Bill Vandegrift (###-####) about the plumbing plans you've submitted being sufficient.
I also wanted to make you aware that ACHD impact fees in the past have been substancial for this area. I will need a letter from ACHD before issuing this project verifying fees are not required or fees have been payed for.
Lastly, submit a letter from the tenant verifying occupant load of the space is 15 or less. This is not required prior to approving the prescreen but would eliminate review comments about separate sex restrooms.
Thanks,
Tim Woodard
City of Boise
Plans Examiner II
|
Application received | | | 1/31/2013 | | DONE |
|
|
|
Application submitted via PDS Online on Jan 31 2013 3:13PM
|