BLD-Framing/Rough-in | 3/12/2013 | 3/12/2013 | 3/12/2013 | P | PASS |
Dave Hannah
|
|
|
call before to meet//Preston (or Kerry ###-####) Phone #: ###-####
|
FIRE-Sprinkler Rough-in | 3/5/2013 | 3/5/2013 | 3/5/2013 | A | PART |
Forrest France
|
|
|
Fire sprinkler work above the new hard lid ceilings is approved for cover. Per contractor, full height recessed cabinets are to be installed below the new soffit at the east side.
|
Plan assigned to (TLW) | 2/1/2013 | | 2/4/2013 | | PASS |
Tim L. Woodard
|
|
|
|
Routing - PLAN CHECK | 2/1/2013 | | 2/4/2013 | | PASS |
Tim L. Woodard
|
|
|
Approved with Separate Fire Sprinkler and Alarm Permits required. TLW
|
1st review completed | | | 2/4/2013 | | DONE |
Tim L. Woodard
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/4/2013 | | DONE |
Tim L. Woodard
|
|
|
|
Case Summary (BLD) | | | 2/4/2013 | | DONE |
Tim L. Woodard
|
|
|
|
Inspection Record Card- Bld | | | 2/4/2013 | | DONE |
Christina Prado
|
|
|
|
Telephone call | | | 2/4/2013 | | DONE |
Tisha Gallop
|
|
|
Called Preston and told him permit is ready, fees, and need GC
|
Permit Ready to Issue | | | 2/4/2013 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 2/4/2013 | | DONE |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 2/1/2013 | | DONE |
Christina Prado
|
|
|
|
Intake Approval | | | 2/1/2013 | | PASS |
Tim L. Woodard
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 2/1/2013 | | DONE |
Christina Prado
|
|
|
|
Application received | | 2/1/2013 | | | |
|
|
|
|