Permit Information
Permit NumberBLD13-00166
StatusExpired
Name PETER BUI (TEN REP)
Site Address 8655 W FRANKLIN RD
Project NameViziato Salon & Day Spa
Customer Number 
ePlanReviewNo
Description
(VIZIATO SALON & DAY SPA - EXPANSION) To expand an existing 3,399 square foot salon and day spa into an adjacent 1,629 square foot area. After the expansion, this tenant space will have a total floor area of about 5,068 square feet. The expansion area will include 2 saunas, 3 massage rooms, 15 pedicure stations, and 4 manicure stations. Work is to include interior nonbearing walls, interior doors, and finishes. The work is required to comply with the approved drawings, with the plan review report, and with all applicable codes and ordinances. The fire sprinkler system is required to comply with NFPA 13 as regulated by the Fire Department. **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
DOC - Permit Expired  9/22/2016 DONE
Property has been vacated.No tenants.
FIRE-Final Inspection8/12/20168/15/20168/15/2016PFAIL
DetailsTroy Cobbley
Peter, the owner, called in a re-inspection but did not answer his phone at first so I stopped by the project and requested access. The staff gave me access and I found that the previous items had not been corrected. Infact the hardware on the doors had been removed. I walked one staff member through all of the items in hopes it would get relayed back to Peter.



As I was getting back into my vehicle Peter called me so I was able to go over the specifics of the corrections needed. I asked him to re-schedule when the items had been corrected.



Troy


Peter// please call before Phone #: ###-####
Plan Reviewer's activity  8/10/2016 DONE
DetailsJason Blais
Called Registered Design Professional Larry Sundell to contact owner for finalizing remaining correction items or we need to meet internally with our legal department. Larry will call back.
FIRE-Conference7/13/20167/18/20167/18/2016ADONE
DetailsTroy Cobbley
Owner was not available and I was not given access. I contacted Forrest France with Boise Fire and he is going to meet with Ray Criner and then contact me for follow up.
FIRE-Conference7/13/20167/13/20167/13/2016PDONE
DetailsTroy Cobbley
I stopped and tried to perform another inspection but the owner was not there and due to business operations could not re-verify corrections. I have re-scheduled my self for a follow up inspection.
FIRE-Final Inspection6/3/20166/3/20166/3/2016PFAIL
DetailsTroy Cobbley
The exit sign has not been repaired, an emergency light in the new area is non-functional and the new door hardware is still not single action. The fire extinguisher is current with its inspection but will expire next month.
BLD-Other5/19/20155/20/20155/20/2015PDONE
DetailsMike Jordan
Verify if fire corrections have been completed. Appeares all issues are resolved except for the fire alarm.
FIRE-Final Inspection4/17/20154/20/20154/20/2015AFAIL
DetailsTroy Cobbley
Provide single action hardware on the new doors, provide annual inspection for all fire extinguishers, repair exit sign at the corridor end in the new area, provide/extend the existing fire alarm system into the new area (this includes all rooms/corridors).
BLD-Final4/16/20154/17/20154/17/2015PPART
DetailsMike Jordan
Peter Phone #: ###-####. All structural issues have been resolved. All trade permits have been finaled. i called and spoke to peter, noted that he needs a life/safety final to be completed.
BLD-Other4/7/20154/7/20154/7/2015AFAIL
DetailsBill VanDegrift
handyman was issued a permit for the plumbing at this location, need a licensed plumbing contractor to pull a permit and call for an inspection.
BLD-Conference4/1/20154/1/20154/1/2015PFAIL
DetailsBob Archibald
Left voice message with Tina @ ###-#### that plumbing permit must be obtained this week or citation will be issued the 6th April.
BLD-Conference2/26/20153/9/20153/10/2015PCANC
DetailsMike Jordan
Status of N&O? wrong date. rescheduled for next monday.
BLD-Conference2/26/20152/26/20152/26/2015PDONE
DetailsMike Jordan
Served 11day N&O and draft citation
BLD-Conference10/17/201410/24/201410/24/2014AFAIL
DetailsMike Jordan
Check on five day notice. Per the conditions on the five day notice, they have not been met. Called and left a message with the owner stating that he has not met the conditions as discussed last friday on the five day notice. Notices of violation and correction notices have been given to bob archibald.
BLD-Other10/24/201410/24/201410/24/2014PPEND
DetailsMike Jordan
Refered to legal dept.
Override - Parcel Holds  10/24/2014  
BLD-Conference10/15/201410/17/201410/17/2014AFAIL
DetailsMike Jordan
A five day notice was issued. All issues must be resolved with in 5 working days, 10-24-14.Per my discussion with Peter on 10-15-14, eelctrical and mech. permits need to be finaled. As of today, friday 10-17-14, the electrical and mech. permits are still open and no inspections have been scheduled. A plumbing permit still has not been isuued to date. As for the undersized waste system, per Bill Vandergrift, the engineer must be willing to accept and take resonsibility for the in place system as per Idaho State Plumbing code 301.4. Also the drinking fountain has not been installed, Doors to saunas not yet removed and bracing for newly built walls not installed all per the city approved plans. A correction notice was also issued and signed by Peter.
BLD-Conference10/15/201410/15/201410/15/2014PDONE
DetailsMike Jordan
called peter and scheduled a building conference with him this friday oct.17th, 2014 at 9:30 am. Will go over to see if the required repairs have been made. Also noted that at this time the electrical and mech. permits have not yet been finaled off. per my discussion last week with peter these two permits were to be finaled. Will issue a five day notice this friday and a correction notice noting the outstanding issues.
BLD-Conference10/1/201410/2/201410/2/2014APEND
DetailsMike Jordan
Check status. If not completed issue 5 day N&O. Calle and left message with peter the owner on job status. No call back today. Rescheduled for 10--03-14 in the am. Will call owner once again prior to issue of 5 day notice to try and get a job status.
BLD-Conference10/2/201410/2/201410/2/2014PCANC
DetailsMike Jordan
Override - Parcel Holds  10/1/2014  
BLD-Conference5/9/20145/9/20145/9/2014PDONE
DetailsMike Jordan
Went over approved plans with owner (Peter). Did a courtesey walk through inspection and discussed everything that he would need to repair to receive a certificate of occupancy. Made all notations and notes on approved plans. Also noted that the owner has decided to delete both sauna rooms and turn them into storage. Both unlisted heaters to be removed, doors to br removed and replaced with curtain. Also dicsussed a timeline of completeing all work. Owner siad he could be complete by july 4th, roughly six weeks.
BLD-Conference5/1/20145/2/20145/2/2014ADONE
DetailsMike Jordan
Noted that electrical and mech. permits have been obtained. Will meet owner on monday may 5th. in the am to review approved plans to move forward and to establish a time frame for all work to be completed.
BLD-Conference4/10/20145/1/20145/1/2014APEND
DetailsMike Jordan
Follow up on 15 day notice. Moved to 5-2 in the am.
BLD-Conference4/10/20144/10/20144/10/2014PCANC
DetailsMike Jordan
BLD-Conference4/10/20144/10/20144/10/2014ADONE
DetailsMike Jordan
Issue 15 day notice to obtain required inspections and CO. A coorection notice was issued to tenant stating that tenant is illegally occupying the adjacent 1,629 S.F. with no certificate of occupancy. Tenant has 15 days to comply with issued building permit, get all required inspections and obtain a certificate of occupancy. At 15 days, a city of boise citation could be issued.
Override - Parcel Holds  4/10/2014  
Override - Parcel Holds  10/10/2013  
Issue PAID IN FULL permit  10/10/2013 DONE
BLD-Conference10/4/201310/4/201310/4/2013PDONE
DetailsMike Jordan
Per Bob Archibald - Give notice to pick up permit within 5 days. A 5 day notice was issued stating to pick bldg. permit that is ready to be issued.
Override - Parcel Holds  10/4/2013  
Telephone call  9/16/2013 DONE
LM for owner to call me back about permit
OVERRIDE  8/23/2013  
OVERRIDE  8/23/2013  
OVERRIDE  8/23/2013  
OVERRIDE  8/23/2013  
Plan assigned to (CJW)4/10/20134/10/20138/23/2013 PASS
DetailsCarl Westfall
VIZIATO SALON & DAY SPA (20 days - May 7)
Routing - PLAN CHECK8/7/2013 8/23/2013 PASS
DetailsCarl Westfall
Drawings approved after 3rd review
Telephone call  8/23/2013 DONE
DetailsBarbara Stitt
Called Larry and left a voice message that told him permit is ready and fees due on 8-23-13 @ 3:45pm///BAS
Routing PW Sewer Rating8/23/2013 8/23/2013 PASS
DetailsCarl Westfall
Replacing a handsink with double drinking fountains. OK per Bev.
PLANS/APPL TAKEN TO FRONT DESK  8/23/2013 DONE
Print Occupancy Form  8/23/2013 DONE
DetailsChristina Prado
Override - Parcel Holds  8/23/2013  
Permit Ready to Issue  8/23/2013 DONE
DetailsBarbara Stitt
Plan resubmittals received  8/13/2013 DONE
DetailsTisha Gallop
received response and two copies of plan sheets One, Two and E-1; taken to Carl Westfall.
Routing - PLAN CHECK7/19/2013 8/7/2013 FAIL
DetailsCarl Westfall
2nd review completed. Items not resolved. Sent Email to the Architect. The resubmittal review was delayed because of more pressing projects and because of a week long vacation.
Routing - PLUMBING8/7/2013 8/7/2013 PASS
DetailsBill VanDegrift
per plans and ISPC
Routing - MECHANICAL  8/7/2013 PASS
Plan resubmittals received  7/19/2013 DONE
DetailsTisha Gallop
received response from architect, pictures of rtu's, and two copies of plans sheets one, two, M-1, P-1, E-1; taken to Carl Madsen.
Routing - PLAN CHECK5/3/2013 7/19/2013  
Waiting for resubmittals.
Telephone call  7/18/2013 DONE
The Architect (Larry Sundell) called. He said that the revised drawings will be in by Friday (July 19).
Route to Impact Fee Review5/2/20135/7/20135/3/2013 PASS
DetailsCindy M. Gould
Tenant expansion into existing space no impact fees
Routing - FIRE5/2/20135/2/20135/3/2013 PASS
DetailsScott Arellano
1st review completed  5/3/2013 FAIL
Failed - Plan Check, Plumbing, Mechanical
Routing - PLAN CHECK4/19/2013 5/2/2013 FAIL
DetailsCarl Westfall
The IBC plan review was started on April 24 and was finished on May 2. Difficult plan review that took lots of research. Revised drawings required.
Routing - MECHANICAL4/16/2013 4/19/2013 FAIL
DetailsTroy James
Nail salon
emailed correction to mechanical engineer
Routing - PLUMBING4/12/2013 4/16/2013 FAIL
DetailsBill VanDegrift
need plumbing lans to show tie in to existing plumbing, location, size and venting. a complete plumbing plan.
Routing - PUBLIC WORKS4/11/2013 4/12/2013 PASS
DetailsConnie Baumgartner
Routing PW Sewer Rating4/11/2013 4/12/2013 PASS
DetailsConnie Baumgartner
Routing - Addressing4/10/2013 4/11/2013 PASS
DetailsJason C. Taylor
Application received 2/4/20134/10/2013 DONE
DetailsTisha Gallop
Plans ACCEPTED BY PLAN TECH  4/10/2013 DONE
DetailsTisha Gallop
Recd Pcfee & Taken To Pln CK  4/10/2013 DONE
DetailsTisha Gallop
Pending Assignment by JCB4/10/2013 4/10/2013 DONE
DetailsJason Blais
Plan Reviewer's activity  4/10/2013 DONE
DetailsJason Blais
Emailed architect to have him contact ACHD for evaluation of any impact fees due. Written verification from ACHD needs to be provided to our Permit Counter prior to the building permit being issued.
Intake Approval  4/1/2013 PASS
OK to submit
Intake Approval  2/4/2013 FAIL
BLD-Conference3/10/20153/16/2015 A 
DetailsMike Jordan
BLD-Conference10/2/201410/3/2014 A 
DetailsMike Jordan
BLD-Conference5/2/20145/5/2014 A 
DetailsMike Jordan
Meet owner on site with approved plans.