Information based on query as of Saturday, June 29, 2024.
Permit Information
Permit NumberBLD13-00184
StatusFinaled
Name PETRA INC
Site Address 5301 E WARM SPRINGS AVE
Project NameThe Terraces of Boise
Customer Number 
ePlanReviewNo
Description
The Terraces of Boise - Main Building Wing H - To construct a new 66,075 square foot, four story, concrete and steel framed assisted living and memory care and commons building. This is a wing of a larger building, with wings separated by two-hour fire walls. This building is fully fire sprinklered. The sprinklers are used for area increase. First Floor: 7,090 sq. ft. consisting of Commons areas. The commons area contains administrative offices and employee back of house areas. Second Floor: 25,155 sq. ft. with 24 memory care apartments and a dining/living area, kitchen, family room and activity areas. Third Floor: 16,915 sq. ft. with 20 assisted living apartments with a 4,280 sq. ft. occupied landscaped roof area. Fourth Floor: 16,915 sq. ft. with 20 assisted living apartments. All floors contain mechanical/electrical and housekeeping areas. The first and second floor commons areas, on the east side of Wing H, will be constructed as part of Phase I and the memory care and assisted living portion of Wing H will be constructed as part of Phase II. All construction per the approved plans and attached comment list. JCM
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice 3/15/20164/18/2016 DONE
Second Notice 2/21/20163/10/2016 DONE
First Notice 1/24/20162/11/2016 DONE
mailed 2-12-16
Permanent Occupancy  1/14/2016 DONE
DetailsChristina Prado
BLD-Final1/13/20161/13/20161/13/2016PPASS
DetailsJim Storey
OK if you do this one at the end of the day per /// John Phone #: ###-####
BLD-Final1/11/20161/12/20161/12/2016PNR
DetailsJim Storey
John Phone #: ###-####
FIRE-Final Inspection1/11/20161/12/20161/12/2016APASS
DetailsJim Page
Previously noted items addressed/repaired. Fire sprinkler inspections complete, fire alarm inspections complete. Life fire safety passed/complete.
BLD-Final12/29/201512/29/201512/29/2015PPART
DetailsJim Storey
John Phone #: ###-#### fd/ pipe protection/at lundry rm/ mech rm/firelite glazing at 2 hr/exteriot complet expation joint and misc. penatrations. fire door and controled exits
FIRE-Final Inspection12/28/201512/29/201512/29/2015APART
DetailsJim Page
Contractor requesting TCO, fire sprinklers are complete, fire alarms have been tested and verified. Alarm contractor needs to install weather proof boxes on the Audio/Visual devices in the restrooms with showers (boxes are on order and will be installed when received). Site fire alarm system is monitored. Life fire safety inspection performed, fire extinguishers are in place, verified path of travel for emergency egress, verified egress lighting including exit discharge landings, door hardware to be installed on doors that are missing the hardware (magnet release hardware/windows). Life fire safety can be finaled after weather proof boxes are installed on A/V devices/FIR permit for alarms is finaled as well as the installation of missing door hardware. TCO authorized for moving in of furniture and employee training, no overnight occupancy for H wing allowed under this TCO, per conversation with Scott Arellano,
BLD-Ceiling Grid Inspection10/28/201510/28/201510/28/2015PPASS
DetailsJim Storey
John Phone #: ###-####
BLD-Ceiling Grid Inspection10/15/201510/16/201510/16/2015PPASS
DetailsJim Storey
John Phone #: ###-####
Zoning Approval9/24/20159/24/20159/24/2015 PASS
DetailsJosh Wilson
BLD-Ceiling Grid Inspection9/21/20159/22/20159/22/2015APASS
DetailsJim Storey
John Phone #: ###-####
BLD-Ceiling Grid Inspection9/11/20159/14/20159/14/2015AFAIL
DetailsJim Storey
John Phone #: ###-#### clips missing/ holes thru ceilling need fire rated/ remove wood
BLD-Ceiling Grid Inspection9/4/20159/8/20159/8/2015PPASS
DetailsPhil Shearer
Paul Phone #: ###-#### H L-Wing
BLD-Ceiling Grid Inspection9/4/20159/4/20159/4/2015PFAIL
DetailsPhil Shearer
H L-Wing; Paul Phone #: ###-####. penetrations thruogh fire walls.
BLD-Framing/Rough-in8/17/20158/18/20158/18/2015APASS
DetailsJim Storey
John Phone #: ###-####
BLD-Framing/Rough-in8/17/20158/17/20158/17/2015PNR
DetailsJim Storey
John Phone #: ###-####
BLD-Ceiling Grid Inspection8/7/20158/10/20158/10/2015APASS
DetailsJim Storey
1st floor; John Phone #: ###-####
BLD-Ceiling Grid Inspection8/6/20158/7/20158/7/2015ADEFR
DetailsJim Storey
1st floor; John Phone #: ###-#### monday am
BLD-Framing/Rough-in8/4/20158/4/20158/4/2015PPART
DetailsJim Storey
John// ceiling framing in corridor- H building-2nd floor Phone #: ###-#### need fire stop listing for ele at 2 hr
BLD-Framing/Rough-in7/23/20157/24/20157/24/2015APASS
DetailsJim Storey
john Phone #: ###-####
BLD-Framing/Rough-in7/23/20157/23/20157/23/2015PNR
DetailsJim Storey
john Phone #: ###-####
BLD-Framing/Rough-in7/21/20157/22/20157/22/2015APASS
DetailsJim Storey
to cover for second floor // John Phone #: ###-#### west side ok
BLD-Wall cover7/20/20157/21/20157/21/2015AFAIL
DetailsJim Storey
3rd floor; John Phone #: ###-#### rebuild 2 hr wall to meet listting
BLD-Framing/Rough-in7/20/20157/20/20157/20/2015PPART
DetailsJim Storey
3rd floor; John Phone #: ###-####
BLD-Ceiling Grid Inspection7/16/20157/17/20157/17/2015APASS
DetailsJim Storey
John Phone #: ###-####
BLD-Ceiling Grid Inspection7/16/20157/16/20157/16/2015PNR
DetailsJim Storey
John Phone #: ###-####
BLD-Ceiling Grid Inspection7/13/20157/14/20157/14/2015PPASS
DetailsJim Storey
2nd floor; John Phone #: ###-#### rooms only ok
BLD-Energy code compliance7/6/20157/7/20157/7/2015APASS
DetailsJim Storey
3rd floor; John Phone #: ###-####
BLD-Framing/Rough-in7/6/20157/7/20157/7/2015APASS
DetailsJim Storey
3rd floor; John Phone #: ###-####
BLD-Framing/Rough-in6/30/20156/30/20156/30/2015PPASS
DetailsJim Storey
John--- 2nd floor, H wing Phone #: ###-#### reviewed 90 min door/jamb walls
BLD-Framing/Rough-in6/23/20156/23/20156/24/2015PPASS
DetailsJim Storey
2nd floor; John Phone #: ###-#### drops above doors
BLD-Energy code compliance6/19/20156/22/20156/22/2015PPASS
DetailsJim Storey
2nd floor; John Phone #: ###-####
BLD-Framing/Rough-in6/18/20156/19/20156/19/2015PPASS
DetailsJim Storey
2nd floor; John Phone #: ###-#### rm walls ok
BLD-Ceiling Grid Inspection6/18/20156/18/20156/18/2015PPASS
DetailsJim Storey
1st floor; John Phone #: ###-####
BLD-Framing/Rough-in6/12/20156/12/20156/12/2015PPART
DetailsTony Young
Wall first half of second floor // John Phone #: ###-####,, see prior notes
BLD-Framing/Rough-in6/11/20156/12/20156/12/2015APART
DetailsTony Young
Wall first half of second floor // John Phone #: ###-####,, ok to one side,, need to add layer on back side of double wall and fire caulk penetrations
BLD-Final6/11/20156/12/20156/12/2015PCANC
DetailsJim Storey
JC// D commons Phone #: ###-####
BLD-Framing/Rough-in6/11/20156/11/20156/11/2015PPART
DetailsTony Young
John-1st floor-south side Phone #: ###-####,, ceiling ok now
BLD-Ceiling Grid Inspection6/9/20156/10/20156/10/2015PPART
DetailsJim Storey
John// 1st floor Phone #: ###-#### all but ref line set ceilling fire stop ok to cover.
BLD-Framing/Rough-in6/9/20156/10/20156/10/2015PPART
DetailsJim Storey
John// 2nd floor Phone #: ###-#### firestoppimg top plate ceilling penatrations
BLD-Ceiling Grid Inspection6/9/20156/9/20156/9/2015PFAIL
DetailsJim Storey
To cover 1st floor // John Phone #: ###-####
BLD-Framing/Rough-in5/28/20155/28/20155/28/2015PPASS
DetailsJim Storey
basement and first floor of H wing // John Phone #: ###-#### plm 2nd floor floor fire stopping ok also,
BLD-Ceiling Grid Inspection5/27/20155/27/20155/27/2015PPART
DetailsJim Storey
Garth// H basement Phone #: ###-####
BLD-Framing/Rough-in5/20/20155/21/20155/21/2015APART
DetailsJim Storey
Second floor fire walls H wing - John Phone #: ###-####
BLD-Energy code compliance4/28/20154/29/20154/29/2015APASS
DetailsJim Storey
Insulation // John Phone #: ###-#### rm only east side 1st floor ok
BLD-Framing/Rough-in4/23/20154/24/20154/24/2015PPASS
DetailsJim Storey
John-1 st floor exterior walls Phone #: ###-####
BLD-Framing/Rough-in4/3/20154/6/20154/6/2015APART
DetailsJim Storey
John// basement- interior wall Phone #: ###-#### c/n 2hr joint and opening protection c/n isued ok to begin gyp.
BLD-Conference3/11/20153/11/20153/11/2015PPART
DetailsJim Storey
John Phone #: ###-#### need gyp top of walls
BLD-Framing/Rough-in3/5/20153/5/20153/5/2015PPASS
DetailsJim Storey
Gary-H wing 2 & 3 floor-consult Phone #: ###-#### ok to cover
BLD-Framing/Rough-in1/8/20151/9/20151/9/2015APASS
DetailsJim Storey
John-Roofing Phone #: ###-#### roof faming steel trusses ok for cover
BLD-Framing/Rough-in1/5/20151/6/20151/6/2015PPART
DetailsJim Storey
JC-kitchen Phone #: ###-#### need bracing/ truss repairs ok
BLD-Wall Bracing11/6/201411/7/201411/7/2014APASS
DetailsJim Storey
JC Phone #: ###-#### exterior of commons bldg. ok to cover
Plan assigned to (JCM)2/6/2013 8/18/2014 PASS
DetailsJohn Menard
1st Review completed 05-16-2013
Routing - PLAN CHECK6/24/2014 8/18/2014 PASS
DetailsJohn Menard
PLANS/APPL TAKEN TO FRONT DESK  8/18/2014 DONE
DetailsJohn Menard
Permit Ready to Issue  8/18/2014 DONE
DetailsCandy A. Nichols
Telephone call  8/18/2014 DONE
DetailsCandy A. Nichols
called Eugene, transfered to Bill-let know permit is ready to be issued
Inspection Record Card- Bld  8/18/2014 DONE
DetailsCandy A. Nichols
Print Occupancy Form  8/18/2014 DONE
DetailsCandy A. Nichols
Issue & PRINT permit  8/18/2014 DONE
DetailsCandy A. Nichols
Plan resubmittals received  8/13/2014 DONE
DetailsTisha Gallop
received two copies of plan sheets AA600, AA601, AA602, AA603, AA604, AA605, AA606, AA607, AA608, AA609, AA610, AA611, AA700, AA701, AA702, AA703; taken to Ron Hill
Intake Approval  7/15/2014 PASS
DetailsJohn Menard
Routing - PLUMBING6/19/2014 6/24/2014 PASS
DetailsDaryl Spivey
ok
Routing - PLAN CHECK5/30/2014 6/18/2014 FAIL
DetailsJohn Menard
Routing - Design Review6/18/2014 6/18/2014 PASS
DetailsJosh Wilson
OK per DRH14-00034
Plan resubmittals requested  6/18/2014  
DetailsJohn Menard
E-mailed the architect a letter requesting some revisions. JCM
BLD-Footing6/10/20146/10/20146/10/2014PPASS
DetailsJim Storey
john Phone #: ###-####
BLD-Footing5/29/20145/30/20145/30/2014APART
DetailsJim Storey
John Phone #: ###-####wip si on site
Plan resubmittals received  5/27/2014  
DetailsJohn Menard
ENTIRE PLAN PACKAGE FOR WING "H" RESUBMITTALS RECEIVED AND ROUTED TO JOHN M.
BLD-Foundation5/23/20145/23/20145/23/2014PPASS
DetailsJim Storey
JC Phone #: ###-####
BLD-Footing5/16/20145/16/20145/16/2014PPEND
DetailsDave Hannah
John Lowe-Elevator slab Phone #: ###-#### pend spec inspection sign off
(F) Reprint permit  5/13/2014 DONE
DetailsChristina Prado
Per Ron Hill - Permit still under review, this is to show early start so contractor can begin work as full fees have already been paid. Contractor to contact Ron Hill directly to schedule any inspections until full permit can be issued
Routing Off Site - STRUCTURAL5/9/2014 5/9/2014 PASS
DetailsRon Hill
CH2mhill completed plan review and approved drawings.
Routing Off Site - STRUCTURAL4/28/2014 5/8/2014 FAIL
DetailsJohn Menard
Plan resubmittals received  5/8/2014 DONE
DetailsChristina Prado
received three sets of revised plan sheets marked SA201, SA401, SA402, SA403, SA404 & SA405 as well as three revised response letters;Plans given to Ron Hill to route and insert
Plan resubmittals received  4/28/2014 DONE
DetailsTisha Gallop
received three copies of review comment structural calcs and plan sheets SA211, SA214, SA221, SA302, SA303, SA304, SA402, SA404, SA405, ST104, ST105, ST204, ST206, ST209; taken to Ron Hill
Telephone call  4/28/2014 DONE
DetailsTisha Gallop
called Action Couriers for pick up
Routing Off Site - STRUCTURAL3/7/2014 3/20/2014 FAIL
DetailsRon Hill
Sent review comments to Bill Boehler and Steve Cornwell
Routing Off Site - STRUCTURAL3/7/2014 3/19/2014 FAIL
DetailsBarbara Stitt
Called Action Couriers for pick up on 3-7-14 @ 8:18am - Received comment list from consulting structural engineer requesting revisions. JCM
Plan resubmittals requested  3/19/2014 DONE
DetailsJohn Menard
E-mailed the architect a copy of the structural review requesting revisions. JCM
Plan resubmittals received  3/7/2014  
Received 3 copies of Structural calcs (Vol 1 & 2), 3 copies of Sheets Cover Sheet, G001, SA201, SA202, SA210, SA211, SA212, SA213, SA214, SA220, SA221, SA222, SA223, SA224, ST101, ST102, ST103, ST104, ST105, ST201, ST202, ST203, ST204, ST205, ST206, ST207, ST208, ST209, SA302, SA303, SA304, SA401, SA402, SA403, SA404, SA405, 1 copy of cd with calcs & drawings, 1 copy of Special Inspections Statement, 1 copy of Transmittal and Ron took to John Menard
Routing PW Street Lights2/27/2014 2/27/2014 PASS
DetailsMike D Hedge
Routing - MECHANICAL  2/19/2014 PASS
DetailsTroy James
Routing PW Drainage2/15/2013 2/12/2014 PASS
DetailsBrian Murphy
Plan resubmittals received  1/23/2014 DONE
DetailsTisha Gallop
received two copies of resonse and plan sheets AA210, AA211, AA220, AA212, AA213, AA401, AA604, AA702, AA503, AA601, AS201, AS601, AS221, AS300, AS700, AC604, AC211, AC213, AC603, AT100, AT101, AI210, AI516, AI611, AI211, AI212, AI213, AI214, AI217, AI221, AI227, PS201, ES211, ET100, EA301, EA302, EA303, ET100, EI200, EI210, EI300, MI211, MI212, MI213, MI222, MI224, MI225, MI228, MI223, MI226, MI229, MI231, MC211, C400, G003, G201, G211, G220; inserted by Ron Hill.
Plan resubmittals requested  12/13/2013 DONE
DetailsJohn Menard
E-mailed the architect a copy of the second plan review requesting revisions. JCM
Plan resubmittals received  11/7/2013 DONE
rec'd 2 copies of sheets SA212; SA213; SA222; SA223; ST401; ST501; ST510 - taken to JCM
Routing - Erosion and Sediment10/29/2013 11/1/2013 PASS
DetailsEvan Jenkins
Routing - PLUMBING10/30/2013 10/31/2013 PASS
DetailsDaryl Spivey
Routing PW Sewer Rating10/29/2013 10/29/2013 PASS
DetailsConnie Baumgartner
Routing PW Sewer Design10/29/2013 10/29/2013 PASS
DetailsKyle S. Rosenmeyer
Routing PW Environmental10/29/2013 10/29/2013 PASS
DetailsWalt Baumgartner
Routing PW Solid Waste10/29/2013 10/29/2013 PASS
DetailsPeter J. McCullough
Routing - PUBLIC WORKS10/29/2013 10/29/2013 PASS
DetailsConnie Baumgartner
Plan resubmittals received  10/25/2013  
Complete plan set of resubmittals received
Plan resubmittals received  10/21/2013  
Rec'd three copies of structrual calcs and plan sheets; SA213, SA221, SA222, SA223,ST501.
Routing Off Site - STRUCTURAL9/25/2013 10/10/2013 FAIL
DetailsRon Hill
Failed 3rd review. Sent requirements to Mike Brown and Architects.
Plan resubmittals received  9/25/2013 DONE
DetailsChristina Prado
received three sets of revised structural calcs and plans marked SA211, SA212, SA213, SA214, SA221, SA222, SA223, SA224, ST302, ST402, ST403, ST510 and ST601;Plans taen to Ron Hill for routing and review
Telephone call  9/25/2013 DONE
DetailsChristina Prado
called Action COuriers for pick up
Plan resubmittals received  9/18/2013 DONE
Rec'd response letter, calcs and sheets SI200; 201; 202; 203; 210; 211; 212; 213; 214; 215; 220; 221; 222; 223; 224; 230; 231; 232; 233; 234; 235; 600; 610; 620; 630; 700; SC211; 212; ST001; 002; 101; 102; 103; 201; 202; 203; 301; 302; 303; 401; 402; 403; 501; 301; SS210; 211 - taken to JCM
Plan resubmittals received  9/9/2013 DONE
DetailsTisha Gallop
Received three copies of structural calcs and plan sheets SA211, SA212, SA213, SA214, SA220, SA221, SA222, SA223, SA224, SI700, ST001, ST002, ST101, ST102, ST103, ST201, ST202, ST203, ST301, ST302, ST303, ST303, ST401, ST402, ST403, ST601; routed one copy to outside engineering and the other two copies taken to Ron Hill.
Routing Off Site - STRUCTURAL7/15/2013 7/29/2013 FAIL
DetailsJohn Menard
Telephone call  7/15/2013 DONE
DetailsTisha Gallop
called Action Couriers for delivery to outside engineering
Additional plans submitted  7/2/2013  
The remaining lateral analysis for wing "H" was submitted on 7/1/13 / WE will NOT send out for engineering review until ALL engineering calculations have been received.
Additional plans submitted  6/20/2013  
Recieved a portion of wing "H" structural plan sheets and lateral analysis calculations. Core engineering says the rest of the engineering will be submitted next week. We will not send out to consultant until all of engineering has been recieved. 6-20-13
Plan resubmittals requested  5/17/2013 DONE
DetailsJohn Menard
E-mailed the architect a copy of the plan review requesting revisions. JCM
1st review completed  5/15/2013 FAIL
Failed PW, ESC
Routing - PLAN CHECK5/15/2013 5/15/2013  
DetailsJohn Menard
Routing - FIRE5/1/2013 5/15/2013 PASS
DetailsScott Arellano
Attached IFC comments to plans.
Routing - PLAN CHECK2/28/2013 5/11/2013 FAIL
DetailsJohn Menard
John Menard
Route to Impact Fee Review2/6/20132/11/20134/9/2013 PASS
DetailsCindy M. Gould
Impact fees applied to BLD13-00179
Plan resubmittals received  4/3/2013 DONE
DetailsTisha Gallop
received three copies of Structural Calcs and plan sheets ST001, ST002, SI210, SI211, SI212, SI213, SI214, SI215, SI220, SI221, SI222, SI223, SI224, SI230, SI231, SI232, SI233, SI234, SI235, SI600, SI620, SI700, ST101, ST102, ST103, ST201, ST202, ST301, ST302, ST401, ST402, ST501, ST601; Ron Hill took two copies and one copy routed to off site structural.
Telephone call  4/3/2013 DONE
DetailsTisha Gallop
called Action Couriers for pick up
Routing - PLANNING2/27/2013 2/28/2013 PASS
DetailsJosh Wilson
DRH12-00250 Josh Wilson
Routing - Erosion and Sediment2/13/2013 2/15/2013 FAIL
DetailsKimberly M. Johnson
Need more information on non-stormwater discharges. Where will these discharges be directed to. Need phasing plan for clearing and grubbing and permanent stabilization. Ref ESC13-0069 for Plan
Routing PW Street Lights2/14/2013 2/14/2013 FAIL
DetailsMike D Hedge
Routing PW Environmental2/14/2013 2/14/2013 FAIL
DetailsWalt Baumgartner
SEE BLD13 00179
Routing PW Sewer Rating2/13/2013 2/13/2013 PASS
DetailsConnie Baumgartner
Routing PW Sewer Design2/13/2013 2/13/2013 FAIL
DetailsKyle S. Rosenmeyer
Existing main in Lysted 15", not 18". Sewer tap permit required and CCTV inspection of new manhole installation. Existing stub provided off lysted needs to be plugged at manhole, and the base re-channeled.
Routing PW Solid Waste2/13/2013 2/13/2013 FAIL
DetailsPeter J. McCullough
Routing - PUBLIC WORKS2/8/2013 2/13/2013 FAIL
DetailsConnie Baumgartner
Routing - PLANNING Land Div2/7/2013 2/8/2013 PASS
DetailsTodd Tucker
Routing - Addressing2/8/2013 2/8/2013 PASS
DetailsJason C. Taylor
Application received 2/6/20132/7/2013 DONE
DetailsTisha Gallop
Plans ACCEPTED BY PLAN TECH  2/6/2013 DONE
DetailsTisha Gallop
Recd Pcfee & Taken To Pln CK  2/6/2013 DONE
DetailsTisha Gallop