Third Notice | | 3/15/2016 | 4/18/2016 | | DONE |
|
|
|
|
Second Notice | | 2/21/2016 | 3/10/2016 | | DONE |
|
|
|
|
First Notice | | 1/24/2016 | 2/11/2016 | | DONE |
|
|
|
mailed 2-12-16
|
Permanent Occupancy | | | 1/14/2016 | | DONE |
Christina Prado
|
|
|
|
BLD-Final | 1/13/2016 | 1/13/2016 | 1/13/2016 | P | PASS |
Jim Storey
|
|
|
OK if you do this one at the end of the day per /// John Phone #: ###-####
|
BLD-Final | 1/11/2016 | 1/12/2016 | 1/12/2016 | P | NR |
Jim Storey
|
|
|
John Phone #: ###-####
|
FIRE-Final Inspection | 1/11/2016 | 1/12/2016 | 1/12/2016 | A | PASS |
Jim Page
|
|
|
Previously noted items addressed/repaired. Fire sprinkler inspections complete, fire alarm inspections complete. Life fire safety passed/complete.
|
BLD-Final | 12/29/2015 | 12/29/2015 | 12/29/2015 | P | PART |
Jim Storey
|
|
|
John Phone #: ###-#### fd/ pipe protection/at lundry rm/ mech rm/firelite glazing at 2 hr/exteriot complet expation joint and misc. penatrations. fire door and controled exits
|
FIRE-Final Inspection | 12/28/2015 | 12/29/2015 | 12/29/2015 | A | PART |
Jim Page
|
|
|
Contractor requesting TCO, fire sprinklers are complete, fire alarms have been tested and verified. Alarm contractor needs to install weather proof boxes on the Audio/Visual devices in the restrooms with showers (boxes are on order and will be installed when received). Site fire alarm system is monitored. Life fire safety inspection performed, fire extinguishers are in place, verified path of travel for emergency egress, verified egress lighting including exit discharge landings, door hardware to be installed on doors that are missing the hardware (magnet release hardware/windows). Life fire safety can be finaled after weather proof boxes are installed on A/V devices/FIR permit for alarms is finaled as well as the installation of missing door hardware. TCO authorized for moving in of furniture and employee training, no overnight occupancy for H wing allowed under this TCO, per conversation with Scott Arellano,
|
BLD-Ceiling Grid Inspection | 10/28/2015 | 10/28/2015 | 10/28/2015 | P | PASS |
Jim Storey
|
|
|
John Phone #: ###-####
|
BLD-Ceiling Grid Inspection | 10/15/2015 | 10/16/2015 | 10/16/2015 | P | PASS |
Jim Storey
|
|
|
John Phone #: ###-####
|
Zoning Approval | 9/24/2015 | 9/24/2015 | 9/24/2015 | | PASS |
Josh Wilson
|
|
|
|
BLD-Ceiling Grid Inspection | 9/21/2015 | 9/22/2015 | 9/22/2015 | A | PASS |
Jim Storey
|
|
|
John Phone #: ###-####
|
BLD-Ceiling Grid Inspection | 9/11/2015 | 9/14/2015 | 9/14/2015 | A | FAIL |
Jim Storey
|
|
|
John Phone #: ###-#### clips missing/ holes thru ceilling need fire rated/ remove wood
|
BLD-Ceiling Grid Inspection | 9/4/2015 | 9/8/2015 | 9/8/2015 | P | PASS |
Phil Shearer
|
|
|
Paul Phone #: ###-#### H L-Wing
|
BLD-Ceiling Grid Inspection | 9/4/2015 | 9/4/2015 | 9/4/2015 | P | FAIL |
Phil Shearer
|
|
|
H L-Wing; Paul Phone #: ###-####. penetrations thruogh fire walls.
|
BLD-Framing/Rough-in | 8/17/2015 | 8/18/2015 | 8/18/2015 | A | PASS |
Jim Storey
|
|
|
John Phone #: ###-####
|
BLD-Framing/Rough-in | 8/17/2015 | 8/17/2015 | 8/17/2015 | P | NR |
Jim Storey
|
|
|
John Phone #: ###-####
|
BLD-Ceiling Grid Inspection | 8/7/2015 | 8/10/2015 | 8/10/2015 | A | PASS |
Jim Storey
|
|
|
1st floor; John Phone #: ###-####
|
BLD-Ceiling Grid Inspection | 8/6/2015 | 8/7/2015 | 8/7/2015 | A | DEFR |
Jim Storey
|
|
|
1st floor; John Phone #: ###-#### monday am
|
BLD-Framing/Rough-in | 8/4/2015 | 8/4/2015 | 8/4/2015 | P | PART |
Jim Storey
|
|
|
John// ceiling framing in corridor- H building-2nd floor Phone #: ###-#### need fire stop listing for ele at 2 hr
|
BLD-Framing/Rough-in | 7/23/2015 | 7/24/2015 | 7/24/2015 | A | PASS |
Jim Storey
|
|
|
john Phone #: ###-####
|
BLD-Framing/Rough-in | 7/23/2015 | 7/23/2015 | 7/23/2015 | P | NR |
Jim Storey
|
|
|
john Phone #: ###-####
|
BLD-Framing/Rough-in | 7/21/2015 | 7/22/2015 | 7/22/2015 | A | PASS |
Jim Storey
|
|
|
to cover for second floor // John Phone #: ###-#### west side ok
|
BLD-Wall cover | 7/20/2015 | 7/21/2015 | 7/21/2015 | A | FAIL |
Jim Storey
|
|
|
3rd floor; John Phone #: ###-#### rebuild 2 hr wall to meet listting
|
BLD-Framing/Rough-in | 7/20/2015 | 7/20/2015 | 7/20/2015 | P | PART |
Jim Storey
|
|
|
3rd floor; John Phone #: ###-####
|
BLD-Ceiling Grid Inspection | 7/16/2015 | 7/17/2015 | 7/17/2015 | A | PASS |
Jim Storey
|
|
|
John Phone #: ###-####
|
BLD-Ceiling Grid Inspection | 7/16/2015 | 7/16/2015 | 7/16/2015 | P | NR |
Jim Storey
|
|
|
John Phone #: ###-####
|
BLD-Ceiling Grid Inspection | 7/13/2015 | 7/14/2015 | 7/14/2015 | P | PASS |
Jim Storey
|
|
|
2nd floor; John Phone #: ###-#### rooms only ok
|
BLD-Energy code compliance | 7/6/2015 | 7/7/2015 | 7/7/2015 | A | PASS |
Jim Storey
|
|
|
3rd floor; John Phone #: ###-####
|
BLD-Framing/Rough-in | 7/6/2015 | 7/7/2015 | 7/7/2015 | A | PASS |
Jim Storey
|
|
|
3rd floor; John Phone #: ###-####
|
BLD-Framing/Rough-in | 6/30/2015 | 6/30/2015 | 6/30/2015 | P | PASS |
Jim Storey
|
|
|
John--- 2nd floor, H wing Phone #: ###-#### reviewed 90 min door/jamb walls
|
BLD-Framing/Rough-in | 6/23/2015 | 6/23/2015 | 6/24/2015 | P | PASS |
Jim Storey
|
|
|
2nd floor; John Phone #: ###-#### drops above doors
|
BLD-Energy code compliance | 6/19/2015 | 6/22/2015 | 6/22/2015 | P | PASS |
Jim Storey
|
|
|
2nd floor; John Phone #: ###-####
|
BLD-Framing/Rough-in | 6/18/2015 | 6/19/2015 | 6/19/2015 | P | PASS |
Jim Storey
|
|
|
2nd floor; John Phone #: ###-#### rm walls ok
|
BLD-Ceiling Grid Inspection | 6/18/2015 | 6/18/2015 | 6/18/2015 | P | PASS |
Jim Storey
|
|
|
1st floor; John Phone #: ###-####
|
BLD-Framing/Rough-in | 6/12/2015 | 6/12/2015 | 6/12/2015 | P | PART |
Tony Young
|
|
|
Wall first half of second floor // John Phone #: ###-####,, see prior notes
|
BLD-Framing/Rough-in | 6/11/2015 | 6/12/2015 | 6/12/2015 | A | PART |
Tony Young
|
|
|
Wall first half of second floor // John Phone #: ###-####,, ok to one side,, need to add layer on back side of double wall and fire caulk penetrations
|
BLD-Final | 6/11/2015 | 6/12/2015 | 6/12/2015 | P | CANC |
Jim Storey
|
|
|
JC// D commons Phone #: ###-####
|
BLD-Framing/Rough-in | 6/11/2015 | 6/11/2015 | 6/11/2015 | P | PART |
Tony Young
|
|
|
John-1st floor-south side Phone #: ###-####,, ceiling ok now
|
BLD-Ceiling Grid Inspection | 6/9/2015 | 6/10/2015 | 6/10/2015 | P | PART |
Jim Storey
|
|
|
John// 1st floor Phone #: ###-#### all but ref line set ceilling fire stop ok to cover.
|
BLD-Framing/Rough-in | 6/9/2015 | 6/10/2015 | 6/10/2015 | P | PART |
Jim Storey
|
|
|
John// 2nd floor Phone #: ###-#### firestoppimg top plate ceilling penatrations
|
BLD-Ceiling Grid Inspection | 6/9/2015 | 6/9/2015 | 6/9/2015 | P | FAIL |
Jim Storey
|
|
|
To cover 1st floor // John Phone #: ###-####
|
BLD-Framing/Rough-in | 5/28/2015 | 5/28/2015 | 5/28/2015 | P | PASS |
Jim Storey
|
|
|
basement and first floor of H wing // John Phone #: ###-#### plm 2nd floor floor fire stopping ok also,
|
BLD-Ceiling Grid Inspection | 5/27/2015 | 5/27/2015 | 5/27/2015 | P | PART |
Jim Storey
|
|
|
Garth// H basement Phone #: ###-####
|
BLD-Framing/Rough-in | 5/20/2015 | 5/21/2015 | 5/21/2015 | A | PART |
Jim Storey
|
|
|
Second floor fire walls H wing - John Phone #: ###-####
|
BLD-Energy code compliance | 4/28/2015 | 4/29/2015 | 4/29/2015 | A | PASS |
Jim Storey
|
|
|
Insulation // John Phone #: ###-#### rm only east side 1st floor ok
|
BLD-Framing/Rough-in | 4/23/2015 | 4/24/2015 | 4/24/2015 | P | PASS |
Jim Storey
|
|
|
John-1 st floor exterior walls Phone #: ###-####
|
BLD-Framing/Rough-in | 4/3/2015 | 4/6/2015 | 4/6/2015 | A | PART |
Jim Storey
|
|
|
John// basement- interior wall Phone #: ###-#### c/n 2hr joint and opening protection c/n isued ok to begin gyp.
|
BLD-Conference | 3/11/2015 | 3/11/2015 | 3/11/2015 | P | PART |
Jim Storey
|
|
|
John Phone #: ###-#### need gyp top of walls
|
BLD-Framing/Rough-in | 3/5/2015 | 3/5/2015 | 3/5/2015 | P | PASS |
Jim Storey
|
|
|
Gary-H wing 2 & 3 floor-consult Phone #: ###-#### ok to cover
|
BLD-Framing/Rough-in | 1/8/2015 | 1/9/2015 | 1/9/2015 | A | PASS |
Jim Storey
|
|
|
John-Roofing Phone #: ###-#### roof faming steel trusses ok for cover
|
BLD-Framing/Rough-in | 1/5/2015 | 1/6/2015 | 1/6/2015 | P | PART |
Jim Storey
|
|
|
JC-kitchen Phone #: ###-#### need bracing/ truss repairs ok
|
BLD-Wall Bracing | 11/6/2014 | 11/7/2014 | 11/7/2014 | A | PASS |
Jim Storey
|
|
|
JC Phone #: ###-#### exterior of commons bldg. ok to cover
|
Plan assigned to (JCM) | 2/6/2013 | | 8/18/2014 | | PASS |
John Menard
|
|
|
1st Review completed 05-16-2013
|
Routing - PLAN CHECK | 6/24/2014 | | 8/18/2014 | | PASS |
John Menard
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/18/2014 | | DONE |
John Menard
|
|
|
|
Permit Ready to Issue | | | 8/18/2014 | | DONE |
Candy A. Nichols
|
|
|
|
Telephone call | | | 8/18/2014 | | DONE |
Candy A. Nichols
|
|
|
called Eugene, transfered to Bill-let know permit is ready to be issued
|
Inspection Record Card- Bld | | | 8/18/2014 | | DONE |
Candy A. Nichols
|
|
|
|
Print Occupancy Form | | | 8/18/2014 | | DONE |
Candy A. Nichols
|
|
|
|
Issue & PRINT permit | | | 8/18/2014 | | DONE |
Candy A. Nichols
|
|
|
|
Plan resubmittals received | | | 8/13/2014 | | DONE |
Tisha Gallop
|
|
|
received two copies of plan sheets AA600, AA601, AA602, AA603, AA604, AA605, AA606, AA607, AA608, AA609, AA610, AA611, AA700, AA701, AA702, AA703; taken to Ron Hill
|
Intake Approval | | | 7/15/2014 | | PASS |
John Menard
|
|
|
|
Routing - PLUMBING | 6/19/2014 | | 6/24/2014 | | PASS |
Daryl Spivey
|
|
|
ok
|
Routing - PLAN CHECK | 5/30/2014 | | 6/18/2014 | | FAIL |
John Menard
|
|
|
|
Routing - Design Review | 6/18/2014 | | 6/18/2014 | | PASS |
Josh Wilson
|
|
|
OK per DRH14-00034
|
Plan resubmittals requested | | | 6/18/2014 | | |
John Menard
|
|
|
E-mailed the architect a letter requesting some revisions. JCM
|
BLD-Footing | 6/10/2014 | 6/10/2014 | 6/10/2014 | P | PASS |
Jim Storey
|
|
|
john Phone #: ###-####
|
BLD-Footing | 5/29/2014 | 5/30/2014 | 5/30/2014 | A | PART |
Jim Storey
|
|
|
John Phone #: ###-####wip si on site
|
Plan resubmittals received | | | 5/27/2014 | | |
John Menard
|
|
|
ENTIRE PLAN PACKAGE FOR WING "H" RESUBMITTALS RECEIVED AND ROUTED TO JOHN M.
|
BLD-Foundation | 5/23/2014 | 5/23/2014 | 5/23/2014 | P | PASS |
Jim Storey
|
|
|
JC Phone #: ###-####
|
BLD-Footing | 5/16/2014 | 5/16/2014 | 5/16/2014 | P | PEND |
Dave Hannah
|
|
|
John Lowe-Elevator slab Phone #: ###-#### pend spec inspection sign off
|
(F) Reprint permit | | | 5/13/2014 | | DONE |
Christina Prado
|
|
|
Per Ron Hill - Permit still under review, this is to show early start so contractor can begin work as full fees have already been paid. Contractor to contact Ron Hill directly to schedule any inspections until full permit can be issued
|
Routing Off Site - STRUCTURAL | 5/9/2014 | | 5/9/2014 | | PASS |
Ron Hill
|
|
|
CH2mhill completed plan review and approved drawings.
|
Routing Off Site - STRUCTURAL | 4/28/2014 | | 5/8/2014 | | FAIL |
John Menard
|
|
|
|
Plan resubmittals received | | | 5/8/2014 | | DONE |
Christina Prado
|
|
|
received three sets of revised plan sheets marked SA201, SA401, SA402, SA403, SA404 & SA405 as well as three revised response letters;Plans given to Ron Hill to route and insert
|
Plan resubmittals received | | | 4/28/2014 | | DONE |
Tisha Gallop
|
|
|
received three copies of review comment structural calcs and plan sheets SA211, SA214, SA221, SA302, SA303, SA304, SA402, SA404, SA405, ST104, ST105, ST204, ST206, ST209; taken to Ron Hill
|
Telephone call | | | 4/28/2014 | | DONE |
Tisha Gallop
|
|
|
called Action Couriers for pick up
|
Routing Off Site - STRUCTURAL | 3/7/2014 | | 3/20/2014 | | FAIL |
Ron Hill
|
|
|
Sent review comments to Bill Boehler and Steve Cornwell
|
Routing Off Site - STRUCTURAL | 3/7/2014 | | 3/19/2014 | | FAIL |
Barbara Stitt
|
|
|
Called Action Couriers for pick up on 3-7-14 @ 8:18am - Received comment list from consulting structural engineer requesting revisions. JCM
|
Plan resubmittals requested | | | 3/19/2014 | | DONE |
John Menard
|
|
|
E-mailed the architect a copy of the structural review requesting revisions. JCM
|
Plan resubmittals received | | | 3/7/2014 | | |
|
|
|
Received 3 copies of Structural calcs (Vol 1 & 2), 3 copies of Sheets Cover Sheet, G001, SA201, SA202, SA210, SA211, SA212, SA213, SA214, SA220, SA221, SA222, SA223, SA224, ST101, ST102, ST103, ST104, ST105, ST201, ST202, ST203, ST204, ST205, ST206, ST207, ST208, ST209, SA302, SA303, SA304, SA401, SA402, SA403, SA404, SA405, 1 copy of cd with calcs & drawings, 1 copy of Special Inspections Statement, 1 copy of Transmittal and Ron took to John Menard
|
Routing PW Street Lights | 2/27/2014 | | 2/27/2014 | | PASS |
Mike D Hedge
|
|
|
|
Routing - MECHANICAL | | | 2/19/2014 | | PASS |
Troy James
|
|
|
|
Routing PW Drainage | 2/15/2013 | | 2/12/2014 | | PASS |
Brian Murphy
|
|
|
|
Plan resubmittals received | | | 1/23/2014 | | DONE |
Tisha Gallop
|
|
|
received two copies of resonse and plan sheets AA210, AA211, AA220, AA212, AA213, AA401, AA604, AA702, AA503, AA601, AS201, AS601, AS221, AS300, AS700, AC604, AC211, AC213, AC603, AT100, AT101, AI210, AI516, AI611, AI211, AI212, AI213, AI214, AI217, AI221, AI227, PS201, ES211, ET100, EA301, EA302, EA303, ET100, EI200, EI210, EI300, MI211, MI212, MI213, MI222, MI224, MI225, MI228, MI223, MI226, MI229, MI231, MC211, C400, G003, G201, G211, G220; inserted by Ron Hill.
|
Plan resubmittals requested | | | 12/13/2013 | | DONE |
John Menard
|
|
|
E-mailed the architect a copy of the second plan review requesting revisions. JCM
|
Plan resubmittals received | | | 11/7/2013 | | DONE |
|
|
|
rec'd 2 copies of sheets SA212; SA213; SA222; SA223; ST401; ST501; ST510 - taken to JCM
|
Routing - Erosion and Sediment | 10/29/2013 | | 11/1/2013 | | PASS |
Evan Jenkins
|
|
|
|
Routing - PLUMBING | 10/30/2013 | | 10/31/2013 | | PASS |
Daryl Spivey
|
|
|
|
Routing PW Sewer Rating | 10/29/2013 | | 10/29/2013 | | PASS |
Connie Baumgartner
|
|
|
|
Routing PW Sewer Design | 10/29/2013 | | 10/29/2013 | | PASS |
Kyle S. Rosenmeyer
|
|
|
|
Routing PW Environmental | 10/29/2013 | | 10/29/2013 | | PASS |
Walt Baumgartner
|
|
|
|
Routing PW Solid Waste | 10/29/2013 | | 10/29/2013 | | PASS |
Peter J. McCullough
|
|
|
|
Routing - PUBLIC WORKS | 10/29/2013 | | 10/29/2013 | | PASS |
Connie Baumgartner
|
|
|
|
Plan resubmittals received | | | 10/25/2013 | | |
|
|
|
Complete plan set of resubmittals received
|
Plan resubmittals received | | | 10/21/2013 | | |
|
|
|
Rec'd three copies of structrual calcs and plan sheets; SA213, SA221, SA222, SA223,ST501.
|
Routing Off Site - STRUCTURAL | 9/25/2013 | | 10/10/2013 | | FAIL |
Ron Hill
|
|
|
Failed 3rd review. Sent requirements to Mike Brown and Architects.
|
Plan resubmittals received | | | 9/25/2013 | | DONE |
Christina Prado
|
|
|
received three sets of revised structural calcs and plans marked SA211, SA212, SA213, SA214, SA221, SA222, SA223, SA224, ST302, ST402, ST403, ST510 and ST601;Plans taen to Ron Hill for routing and review
|
Telephone call | | | 9/25/2013 | | DONE |
Christina Prado
|
|
|
called Action COuriers for pick up
|
Plan resubmittals received | | | 9/18/2013 | | DONE |
|
|
|
Rec'd response letter, calcs and sheets SI200; 201; 202; 203; 210; 211; 212; 213; 214; 215; 220; 221; 222; 223; 224; 230; 231; 232; 233; 234; 235; 600; 610; 620; 630; 700; SC211; 212; ST001; 002; 101; 102; 103; 201; 202; 203; 301; 302; 303; 401; 402; 403; 501; 301; SS210; 211 - taken to JCM
|
Plan resubmittals received | | | 9/9/2013 | | DONE |
Tisha Gallop
|
|
|
Received three copies of structural calcs and plan sheets SA211, SA212, SA213, SA214, SA220, SA221, SA222, SA223, SA224, SI700, ST001, ST002, ST101, ST102, ST103, ST201, ST202, ST203, ST301, ST302, ST303, ST303, ST401, ST402, ST403, ST601; routed one copy to outside engineering and the other two copies taken to Ron Hill.
|
Routing Off Site - STRUCTURAL | 7/15/2013 | | 7/29/2013 | | FAIL |
John Menard
|
|
|
|
Telephone call | | | 7/15/2013 | | DONE |
Tisha Gallop
|
|
|
called Action Couriers for delivery to outside engineering
|
Additional plans submitted | | | 7/2/2013 | | |
|
|
|
The remaining lateral analysis for wing "H" was submitted on 7/1/13 / WE will NOT send out for engineering review until ALL engineering calculations have been received.
|
Additional plans submitted | | | 6/20/2013 | | |
|
|
|
Recieved a portion of wing "H" structural plan sheets and lateral analysis calculations. Core engineering says the rest of the engineering will be submitted next week. We will not send out to consultant until all of engineering has been recieved. 6-20-13
|
Plan resubmittals requested | | | 5/17/2013 | | DONE |
John Menard
|
|
|
E-mailed the architect a copy of the plan review requesting revisions. JCM
|
1st review completed | | | 5/15/2013 | | FAIL |
|
|
|
Failed PW, ESC
|
Routing - PLAN CHECK | 5/15/2013 | | 5/15/2013 | | |
John Menard
|
|
|
|
Routing - FIRE | 5/1/2013 | | 5/15/2013 | | PASS |
Scott Arellano
|
|
|
Attached IFC comments to plans.
|
Routing - PLAN CHECK | 2/28/2013 | | 5/11/2013 | | FAIL |
John Menard
|
|
|
John Menard
|
Route to Impact Fee Review | 2/6/2013 | 2/11/2013 | 4/9/2013 | | PASS |
Cindy M. Gould
|
|
|
Impact fees applied to BLD13-00179
|
Plan resubmittals received | | | 4/3/2013 | | DONE |
Tisha Gallop
|
|
|
received three copies of Structural Calcs and plan sheets ST001, ST002, SI210, SI211, SI212, SI213, SI214, SI215, SI220, SI221, SI222, SI223, SI224, SI230, SI231, SI232, SI233, SI234, SI235, SI600, SI620, SI700, ST101, ST102, ST103, ST201, ST202, ST301, ST302, ST401, ST402, ST501, ST601; Ron Hill took two copies and one copy routed to off site structural.
|
Telephone call | | | 4/3/2013 | | DONE |
Tisha Gallop
|
|
|
called Action Couriers for pick up
|
Routing - PLANNING | 2/27/2013 | | 2/28/2013 | | PASS |
Josh Wilson
|
|
|
DRH12-00250 Josh Wilson
|
Routing - Erosion and Sediment | 2/13/2013 | | 2/15/2013 | | FAIL |
Kimberly M. Johnson
|
|
|
Need more information on non-stormwater discharges. Where will these discharges be directed to. Need phasing plan for clearing and grubbing and permanent stabilization. Ref ESC13-0069 for Plan
|
Routing PW Street Lights | 2/14/2013 | | 2/14/2013 | | FAIL |
Mike D Hedge
|
|
|
|
Routing PW Environmental | 2/14/2013 | | 2/14/2013 | | FAIL |
Walt Baumgartner
|
|
|
SEE BLD13 00179
|
Routing PW Sewer Rating | 2/13/2013 | | 2/13/2013 | | PASS |
Connie Baumgartner
|
|
|
|
Routing PW Sewer Design | 2/13/2013 | | 2/13/2013 | | FAIL |
Kyle S. Rosenmeyer
|
|
|
Existing main in Lysted 15", not 18". Sewer tap permit required and CCTV inspection of new manhole installation. Existing stub provided off lysted needs to be plugged at manhole, and the base re-channeled.
|
Routing PW Solid Waste | 2/13/2013 | | 2/13/2013 | | FAIL |
Peter J. McCullough
|
|
|
|
Routing - PUBLIC WORKS | 2/8/2013 | | 2/13/2013 | | FAIL |
Connie Baumgartner
|
|
|
|
Routing - PLANNING Land Div | 2/7/2013 | | 2/8/2013 | | PASS |
Todd Tucker
|
|
|
|
Routing - Addressing | 2/8/2013 | | 2/8/2013 | | PASS |
Jason C. Taylor
|
|
|
|
Application received | | 2/6/2013 | 2/7/2013 | | DONE |
Tisha Gallop
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 2/6/2013 | | DONE |
Tisha Gallop
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 2/6/2013 | | DONE |
Tisha Gallop
|
|
|
|