Permit NumberBLD13-00189
StatusFinaled
Name BOISE RETIREMENT COMMUNITY
Site Address 4016 S COUNCIL SPRING RD
Project NameThe Terraces of Boise
Customer Number 
ePlanReviewNo
Description
The Terraces of Boise - Skilled Nursing Cottage J - To construct a new 12,465 square foot, one story, wood framed skilled nursing facility and related site improvements. This nursing home will contain 16 sleeping units with individual restrooms, as well as, a kitchen, dining and hearth room social area. This building will also contain a hair salon, laundry, storage and mechanical areas. This building is divided into two smoke compartments by a one-hour smoke barrier wall. This building will be fully fire sprinkled. All construction per the approved plans and attached comment list. JCM
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Print Statement  5/4/2016 DONE
Print Statement  5/4/2016 DONE
Third Notice 3/15/20164/18/2016 DONE
Third Notice 2/16/20163/10/2016 DONE
sent with a letter
Third Notice 1/19/20162/11/2016 DONE
Third Notice 12/15/20151/14/2016 DONE
Second Notice 11/19/201512/10/2015 DONE
mailed 12-11-15
First Notice 11/9/201511/9/2015 DONE
Mailed 11-10-15
Permanent Occupancy  10/30/2015 DONE
DetailsChristina Prado
BLD-Final10/28/201510/29/201510/29/2015PPASS
DetailsJim Storey
JC Phone #: ###-####
BLD-Final10/2/201510/2/201510/2/2015PPASS
DetailsJim Storey
Phone #: ###-#### final ok pending plm
Temporary Occupancy10/2/201512/31/201510/2/2015 DONE
DetailsChristina Prado
BLD-Final9/30/20159/30/20159/30/2015PNR
DetailsJim Storey
jc Phone #: ###-####
Zoning Approval9/24/20159/24/20159/24/2015 PASS
DetailsJosh Wilson
FIRE-Final Inspection9/22/20159/23/20159/23/2015PDONE
DetailsThomas Walsh
Final fire and life safety inspection for Bldg. J. Tested inreface with egress hardware (mag locks) to ensure proper functioning. Address (temp. sign) posted, pending arrival of permanent address. Fire extinguishers OK. Knox box awaiting permanent keys to building.
NOTE: Address changed (from 4032 to 4016) for this building to that indicated on the permit.
FIRE-Final Inspection9/22/20159/22/20159/22/2015PPART
DetailsThomas Walsh
Fire life-safety inspection for Bldg. J.
Emergency lighting and exit sign test off of generator - OK
Smoke doors installed and operational.
Egress doors, with magnetic door locking hardware still being installed - not tested this visit.
For final sign off, need to complete fire sprinklers and fire alarm finals, need building address posted, need one adiitional fire extinguisher near laundry room, and egress doors tested with fire alarm interface.
Suggest that Boise Fire be contacted to lock building keys into Knox box, which is installed.
BLD-Ceiling Grid Inspection9/10/20159/11/20159/11/2015ANR
DetailsJim Storey
Gary// Bldg. J Phone #: ###-####
BLD-Framing/Rough-in5/13/20155/14/20155/14/2015PPART
DetailsJim Storey
Sean Phone #: ###-#### damper patch at smoke septration 2 locations/ hvac damper 6 and 8 vents ?/2 collors 3 in pipe remove 2x4 and patch
BLD-Energy code compliance3/9/20153/9/20153/10/2015PPASS
DetailsJim Storey
Sean Phone #: ###-#### spa area ok for cover bldg j
BLD-Energy code compliance2/19/20152/19/20152/19/2015PPART
DetailsJim Storey
Shawn-partial exterier walls in the skilled nursing room Phone #: ###-#### need windows insulated.
BLD-Energy code compliance2/17/20152/17/20152/17/2015PPASS
DetailsJim Storey
Shawn-inspection is for whole address Phone #: ###-####-call when you get there so Shawn can meet air seal ok
BLD-Energy code compliance2/12/20152/13/20152/13/2015PFAIL
DetailsDave Hannah
Sean Phone #: ###-#### not ready still working
BLD-Conference2/6/20152/9/20152/9/2015APASS
DetailsJim Storey
Sean Phone #: ###-####
BLD-Framing/Rough-in2/4/20152/5/20152/5/2015APASS
DetailsJim Storey
Shawn-whole building inspection for trusses bldg J-would like inspection after 10:00 Phone #: ###-#### ok to cover ceilling.
BLD-Framing/Rough-in2/2/20152/3/20152/3/2015APART
DetailsJim Storey
Shawn-framing in attic & smoke walls for SKilled Nursing bldg J Phone #: ###-#### truss uplift/ misc
BLD-Framing/Rough-in12/10/201412/11/201412/11/2014APART
DetailsJim Storey
Sean-would like between10:00 and 11:30 if possible or pm-Skilled Nursing Bldg J-locations where they need to install showers Phone #: ###-####
BLD-Energy code compliance11/14/201411/17/201411/17/2014APART
DetailsJim Storey
shean Phone #: ###-#### ele rm and riser rm exterior walls
BLD-Framing/Rough-in11/7/201411/10/201411/10/2014APART
DetailsJim Storey
Shawn-partial for cover on 5 walls in mechanical room-skilled nursing bldg J Phone #: ###-#### exterior walls at ele/plm wall pending plm aproval ok to insulste specific walls.
BLD-Wall Bracing9/11/20149/12/20149/15/2014APASS
DetailsJim Storey
JC Phone #: ###-####425 wall sheer ok
BLD-Wall Bracing9/10/20149/11/20149/11/2014PDEFR
DetailsDave Hannah
JC Phone #: ###-#### resceduled for 8/12 out of time today
BLD-Footing5/7/20145/8/20145/8/2014APASS
DetailsJim Storey
j.c. Phone #: ###-####
OVERRIDE  5/6/2014  
Print Occupancy Form  5/6/2014 DONE
DetailsChristina Prado
Issue & PRINT permit  5/6/2014  
DetailsCandy A. Nichols
PLANS/APPL TAKEN TO FRONT DESK  5/6/2014 DONE
DetailsJohn Menard
Permit Ready to Issue  5/6/2014 DONE
DetailsChristina Prado
Plan assigned to (JCM)2/6/2013 5/6/2014 PASS
DetailsJohn Menard
1st Review completed 5/3/2013
Routing - PLAN CHECK4/28/2014 5/5/2014 PASS
Details
Routing - PLANNING4/25/2014 4/28/2014 PASS
DetailsJosh Wilson
Routing - PLUMBING4/24/2014 4/25/2014 PASS
DetailsDaryl Spivey
Per plan and ISPC.
Routing - FIRE4/24/2014 4/25/2014 PASS
DetailsScott Arellano
No changes to scope. See code alternate attached.
Routing - Erosion and Sediment4/23/2014 4/24/2014 PASS
DetailsRon Hill
Routing - PUBLIC WORKS4/21/2014 4/23/2014 PASS
DetailsConnie Baumgartner
Routing PW Sewer Rating4/22/2014 4/22/2014 PASS
DetailsJennifer Bruner
Routing - Addressing4/18/2014 4/21/2014 PASS
DetailsJason C. Taylor
Routing - PLAN CHECK1/21/2014 4/18/2014 FAIL
DetailsJohn Menard
Plan resubmittals received  4/18/2014 DONE
rec'd two full sets and alternate for swing-up grab bar
Routing PW Street Lights10/29/2013 2/27/2014 PASS
DetailsMike D Hedge
Routing - MECHANICAL  2/19/2014 PASS
DetailsTroy James
Routing PW Drainage2/15/2013 2/12/2014 PASS
DetailsBrian Murphy
Plan resubmittals received  2/11/2014 DONE
DetailsChristina Prado
Received two sets of of alt response letter addressed to Jason, plan review response letters, two sets of responses to Troy James and two sets of plan sheets marked MT103, AS201 & AS601; Plans inserted by Ron Hill and taken back for review
Plan resubmittals received  1/23/2014 DONE
DetailsTisha Gallop
received two copies of resonse and plan sheets AA210, AA211, AA220, AA212, AA213, AA401, AA604, AA702, AA503, AA601, AS201, AS601, AS221, AS300, AS700, AC604, AC211, AC213, AC603, AT100, AT101, AI210, AI516, AI611, AI211, AI212, AI213, AI214, AI217, AI221, AI227, PS201, ES211, ET100, EA301, EA302, EA303, ET100, EI200, EI210, EI300, MI211, MI212, MI213, MI222, MI224, MI225, MI228, MI223, MI226, MI229, MI231, MC211, C400, G003, G201, G211, G220; inserted by Ron Hill.
Routing - FIRE1/16/2014 1/21/2014 PASS
DetailsScott Arellano
Attached comments to plans.
Plan resubmittals requested  12/13/2013 DONE
DetailsJohn Menard
E-mailed the architect a copy of the second plan review requesting revisions. JCM
Routing - Erosion and Sediment10/29/2013 11/1/2013 PASS
DetailsEvan Jenkins
Routing - PLUMBING  10/31/2013 PASS
Routing PW Sewer Design10/29/2013 10/29/2013 PASS
DetailsKyle S. Rosenmeyer
Routing PW Sewer Rating10/29/2013 10/29/2013 PASS
DetailsConnie Baumgartner
Routing PW Solid Waste10/29/2013 10/29/2013 PASS
DetailsPeter J. McCullough
Routing PW Environmental10/29/2013 10/29/2013 PASS
DetailsWalt Baumgartner
Routing - PUBLIC WORKS10/29/2013 10/29/2013 PASS
DetailsConnie Baumgartner
Plan resubmittals received  10/25/2013  
Complete plan set of resubmittals received
Routing Off Site - STRUCTURAL9/21/2013 9/30/2013 PASS
DetailsRon Hill
Routing - PLAN CHECK5/16/2013 9/21/2013 FAIL
DetailsJohn Menard
Plan resubmittals received  9/18/2013  
Rec'd response letter, calcs and sheets SI200; 201; 202; 203; 210; 211; 212; 213; 214; 215; 220; 221; 222; 223; 224; 230; 231; 232; 233; 234; 235; 600; 610; 620; 630; 700; SC211; 212; ST001; 002; 101; 102; 103; 201; 202; 203; 301; 302; 303; 401; 402; 403; 501; 301; SS210; 211 - taken to JCM
Plan resubmittals requested  5/17/2013 DONE
DetailsJohn Menard
E-mailed the architect a copy of the plan review requesting revisions. JCM
1st review completed  5/16/2013 FAIL
Failed Planning, PW, ESC and Fire
Routing - FIRE5/1/2013 5/16/2013 FAIL
DetailsScott Arellano
Emailed and faxed resubmittal items to archtect.
Routing - PLAN CHECK2/28/2013 5/1/2013 FAIL
DetailsJohn Menard
John Menard
Route to Impact Fee Review2/6/20132/11/20134/9/2013 PASS
DetailsCindy M. Gould
Impact fees applied to BLD13-00179
Routing Off Site - STRUCTURAL3/14/2013 3/21/2013 FAIL
DetailsJohn Menard
Received comment list from consulting structural engineer requesting revisions. JCM
Telephone call  3/14/2013 DONE
DetailsTisha Gallop
Called Action Couriers for pick up
Routing - PLANNING2/27/2013 2/28/2013 PASS
DetailsJosh Wilson
DRH12-00250 Josh Wilson
Routing - Erosion and Sediment2/13/2013 2/15/2013 FAIL
DetailsKimberly M. Johnson
Need more information on non-stormwater discharges. Where will these discharges be directed to. Need phasing plan for clearing and grubbing and permanent stabilization. Ref ESC13-0069 for Plan
Routing PW Street Lights2/14/2013 2/14/2013 FAIL
DetailsMike D Hedge
Routing - PUBLIC WORKS2/8/2013 2/13/2013 FAIL
DetailsConnie Baumgartner
Routing PW Sewer Rating2/13/2013 2/13/2013 PASS
DetailsConnie Baumgartner
Routing PW Sewer Design2/13/2013 2/13/2013 FAIL
DetailsKyle S. Rosenmeyer
Existing main in Lysted 15", not 18". Sewer tap permit required and CCTV inspection of new manhole installation. Existing stub provided off lysted needs to be plugged at manhole, and the base re-channeled.
Routing PW Solid Waste2/13/2013 2/13/2013 FAIL
DetailsPeter J. McCullough
Routing - Addressing2/8/2013 2/8/2013 PASS
DetailsJason C. Taylor
Routing - PLANNING Land Div2/7/2013 2/8/2013 PASS
DetailsTodd Tucker
Application received 2/6/20132/7/2013 DONE
DetailsTisha Gallop
Plans ACCEPTED BY PLAN TECH  2/6/2013 DONE
DetailsTisha Gallop
Recd Pcfee & Taken To Pln CK  2/6/2013 DONE
DetailsTisha Gallop