Print Statement | | | 5/4/2016 | | DONE |
|
|
|
|
Print Statement | | | 5/4/2016 | | DONE |
|
|
|
|
Third Notice | | 3/15/2016 | 4/18/2016 | | DONE |
|
|
|
|
Third Notice | | 2/16/2016 | 3/10/2016 | | DONE |
|
|
|
sent with a letter
|
Third Notice | | 1/19/2016 | 2/11/2016 | | DONE |
|
|
|
|
Third Notice | | 12/15/2015 | 1/14/2016 | | DONE |
|
|
|
|
Second Notice | | 11/19/2015 | 12/10/2015 | | DONE |
|
|
|
mailed 12-11-15
|
First Notice | | 11/9/2015 | 11/9/2015 | | DONE |
|
|
|
Mailed 11-10-15
|
Permanent Occupancy | | | 10/30/2015 | | DONE |
Christina Prado
|
|
|
|
BLD-Final | 10/28/2015 | 10/29/2015 | 10/29/2015 | P | PASS |
Jim Storey
|
|
|
JC Phone #: ###-####
|
BLD-Final | 10/2/2015 | 10/2/2015 | 10/2/2015 | P | PASS |
Jim Storey
|
|
|
Phone #: ###-#### final ok pending plm
|
Temporary Occupancy | 10/2/2015 | 12/31/2015 | 10/2/2015 | | DONE |
Christina Prado
|
|
|
|
BLD-Final | 9/30/2015 | 9/30/2015 | 9/30/2015 | P | NR |
Jim Storey
|
|
|
jc Phone #: ###-####
|
Zoning Approval | 9/24/2015 | 9/24/2015 | 9/24/2015 | | PASS |
Josh Wilson
|
|
|
|
FIRE-Final Inspection | 9/22/2015 | 9/23/2015 | 9/23/2015 | P | DONE |
Thomas Walsh
|
|
|
Final fire and life safety inspection for Bldg. J. Tested inreface with egress hardware (mag locks) to ensure proper functioning. Address (temp. sign) posted, pending arrival of permanent address. Fire extinguishers OK. Knox box awaiting permanent keys to building. NOTE: Address changed (from 4032 to 4016) for this building to that indicated on the permit.
|
FIRE-Final Inspection | 9/22/2015 | 9/22/2015 | 9/22/2015 | P | PART |
Thomas Walsh
|
|
|
Fire life-safety inspection for Bldg. J. Emergency lighting and exit sign test off of generator - OK Smoke doors installed and operational. Egress doors, with magnetic door locking hardware still being installed - not tested this visit. For final sign off, need to complete fire sprinklers and fire alarm finals, need building address posted, need one adiitional fire extinguisher near laundry room, and egress doors tested with fire alarm interface. Suggest that Boise Fire be contacted to lock building keys into Knox box, which is installed.
|
BLD-Ceiling Grid Inspection | 9/10/2015 | 9/11/2015 | 9/11/2015 | A | NR |
Jim Storey
|
|
|
Gary// Bldg. J Phone #: ###-####
|
BLD-Framing/Rough-in | 5/13/2015 | 5/14/2015 | 5/14/2015 | P | PART |
Jim Storey
|
|
|
Sean Phone #: ###-#### damper patch at smoke septration 2 locations/ hvac damper 6 and 8 vents ?/2 collors 3 in pipe remove 2x4 and patch
|
BLD-Energy code compliance | 3/9/2015 | 3/9/2015 | 3/10/2015 | P | PASS |
Jim Storey
|
|
|
Sean Phone #: ###-#### spa area ok for cover bldg j
|
BLD-Energy code compliance | 2/19/2015 | 2/19/2015 | 2/19/2015 | P | PART |
Jim Storey
|
|
|
Shawn-partial exterier walls in the skilled nursing room Phone #: ###-#### need windows insulated.
|
BLD-Energy code compliance | 2/17/2015 | 2/17/2015 | 2/17/2015 | P | PASS |
Jim Storey
|
|
|
Shawn-inspection is for whole address Phone #: ###-####-call when you get there so Shawn can meet air seal ok
|
BLD-Energy code compliance | 2/12/2015 | 2/13/2015 | 2/13/2015 | P | FAIL |
Dave Hannah
|
|
|
Sean Phone #: ###-#### not ready still working
|
BLD-Conference | 2/6/2015 | 2/9/2015 | 2/9/2015 | A | PASS |
Jim Storey
|
|
|
Sean Phone #: ###-####
|
BLD-Framing/Rough-in | 2/4/2015 | 2/5/2015 | 2/5/2015 | A | PASS |
Jim Storey
|
|
|
Shawn-whole building inspection for trusses bldg J-would like inspection after 10:00 Phone #: ###-#### ok to cover ceilling.
|
BLD-Framing/Rough-in | 2/2/2015 | 2/3/2015 | 2/3/2015 | A | PART |
Jim Storey
|
|
|
Shawn-framing in attic & smoke walls for SKilled Nursing bldg J Phone #: ###-#### truss uplift/ misc
|
BLD-Framing/Rough-in | 12/10/2014 | 12/11/2014 | 12/11/2014 | A | PART |
Jim Storey
|
|
|
Sean-would like between10:00 and 11:30 if possible or pm-Skilled Nursing Bldg J-locations where they need to install showers Phone #: ###-####
|
BLD-Energy code compliance | 11/14/2014 | 11/17/2014 | 11/17/2014 | A | PART |
Jim Storey
|
|
|
shean Phone #: ###-#### ele rm and riser rm exterior walls
|
BLD-Framing/Rough-in | 11/7/2014 | 11/10/2014 | 11/10/2014 | A | PART |
Jim Storey
|
|
|
Shawn-partial for cover on 5 walls in mechanical room-skilled nursing bldg J Phone #: ###-#### exterior walls at ele/plm wall pending plm aproval ok to insulste specific walls.
|
BLD-Wall Bracing | 9/11/2014 | 9/12/2014 | 9/15/2014 | A | PASS |
Jim Storey
|
|
|
JC Phone #: ###-####425 wall sheer ok
|
BLD-Wall Bracing | 9/10/2014 | 9/11/2014 | 9/11/2014 | P | DEFR |
Dave Hannah
|
|
|
JC Phone #: ###-#### resceduled for 8/12 out of time today
|
BLD-Footing | 5/7/2014 | 5/8/2014 | 5/8/2014 | A | PASS |
Jim Storey
|
|
|
j.c. Phone #: ###-####
|
OVERRIDE | | | 5/6/2014 | | |
|
|
|
|
Print Occupancy Form | | | 5/6/2014 | | DONE |
Christina Prado
|
|
|
|
Issue & PRINT permit | | | 5/6/2014 | | |
Candy A. Nichols
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/6/2014 | | DONE |
John Menard
|
|
|
|
Permit Ready to Issue | | | 5/6/2014 | | DONE |
Christina Prado
|
|
|
|
Plan assigned to (JCM) | 2/6/2013 | | 5/6/2014 | | PASS |
John Menard
|
|
|
1st Review completed 5/3/2013
|
Routing - PLAN CHECK | 4/28/2014 | | 5/5/2014 | | PASS |
|
|
|
|
Routing - PLANNING | 4/25/2014 | | 4/28/2014 | | PASS |
Josh Wilson
|
|
|
|
Routing - PLUMBING | 4/24/2014 | | 4/25/2014 | | PASS |
Daryl Spivey
|
|
|
Per plan and ISPC.
|
Routing - FIRE | 4/24/2014 | | 4/25/2014 | | PASS |
Scott Arellano
|
|
|
No changes to scope. See code alternate attached.
|
Routing - Erosion and Sediment | 4/23/2014 | | 4/24/2014 | | PASS |
Ron Hill
|
|
|
|
Routing - PUBLIC WORKS | 4/21/2014 | | 4/23/2014 | | PASS |
Connie Baumgartner
|
|
|
|
Routing PW Sewer Rating | 4/22/2014 | | 4/22/2014 | | PASS |
Jennifer Bruner
|
|
|
|
Routing - Addressing | 4/18/2014 | | 4/21/2014 | | PASS |
Jason C. Taylor
|
|
|
|
Routing - PLAN CHECK | 1/21/2014 | | 4/18/2014 | | FAIL |
John Menard
|
|
|
|
Plan resubmittals received | | | 4/18/2014 | | DONE |
|
|
|
rec'd two full sets and alternate for swing-up grab bar
|
Routing PW Street Lights | 10/29/2013 | | 2/27/2014 | | PASS |
Mike D Hedge
|
|
|
|
Routing - MECHANICAL | | | 2/19/2014 | | PASS |
Troy James
|
|
|
|
Routing PW Drainage | 2/15/2013 | | 2/12/2014 | | PASS |
Brian Murphy
|
|
|
|
Plan resubmittals received | | | 2/11/2014 | | DONE |
Christina Prado
|
|
|
Received two sets of of alt response letter addressed to Jason, plan review response letters, two sets of responses to Troy James and two sets of plan sheets marked MT103, AS201 & AS601; Plans inserted by Ron Hill and taken back for review
|
Plan resubmittals received | | | 1/23/2014 | | DONE |
Tisha Gallop
|
|
|
received two copies of resonse and plan sheets AA210, AA211, AA220, AA212, AA213, AA401, AA604, AA702, AA503, AA601, AS201, AS601, AS221, AS300, AS700, AC604, AC211, AC213, AC603, AT100, AT101, AI210, AI516, AI611, AI211, AI212, AI213, AI214, AI217, AI221, AI227, PS201, ES211, ET100, EA301, EA302, EA303, ET100, EI200, EI210, EI300, MI211, MI212, MI213, MI222, MI224, MI225, MI228, MI223, MI226, MI229, MI231, MC211, C400, G003, G201, G211, G220; inserted by Ron Hill.
|
Routing - FIRE | 1/16/2014 | | 1/21/2014 | | PASS |
Scott Arellano
|
|
|
Attached comments to plans.
|
Plan resubmittals requested | | | 12/13/2013 | | DONE |
John Menard
|
|
|
E-mailed the architect a copy of the second plan review requesting revisions. JCM
|
Routing - Erosion and Sediment | 10/29/2013 | | 11/1/2013 | | PASS |
Evan Jenkins
|
|
|
|
Routing - PLUMBING | | | 10/31/2013 | | PASS |
|
|
|
|
Routing PW Sewer Design | 10/29/2013 | | 10/29/2013 | | PASS |
Kyle S. Rosenmeyer
|
|
|
|
Routing PW Sewer Rating | 10/29/2013 | | 10/29/2013 | | PASS |
Connie Baumgartner
|
|
|
|
Routing PW Solid Waste | 10/29/2013 | | 10/29/2013 | | PASS |
Peter J. McCullough
|
|
|
|
Routing PW Environmental | 10/29/2013 | | 10/29/2013 | | PASS |
Walt Baumgartner
|
|
|
|
Routing - PUBLIC WORKS | 10/29/2013 | | 10/29/2013 | | PASS |
Connie Baumgartner
|
|
|
|
Plan resubmittals received | | | 10/25/2013 | | |
|
|
|
Complete plan set of resubmittals received
|
Routing Off Site - STRUCTURAL | 9/21/2013 | | 9/30/2013 | | PASS |
Ron Hill
|
|
|
|
Routing - PLAN CHECK | 5/16/2013 | | 9/21/2013 | | FAIL |
John Menard
|
|
|
|
Plan resubmittals received | | | 9/18/2013 | | |
|
|
|
Rec'd response letter, calcs and sheets SI200; 201; 202; 203; 210; 211; 212; 213; 214; 215; 220; 221; 222; 223; 224; 230; 231; 232; 233; 234; 235; 600; 610; 620; 630; 700; SC211; 212; ST001; 002; 101; 102; 103; 201; 202; 203; 301; 302; 303; 401; 402; 403; 501; 301; SS210; 211 - taken to JCM
|
Plan resubmittals requested | | | 5/17/2013 | | DONE |
John Menard
|
|
|
E-mailed the architect a copy of the plan review requesting revisions. JCM
|
1st review completed | | | 5/16/2013 | | FAIL |
|
|
|
Failed Planning, PW, ESC and Fire
|
Routing - FIRE | 5/1/2013 | | 5/16/2013 | | FAIL |
Scott Arellano
|
|
|
Emailed and faxed resubmittal items to archtect.
|
Routing - PLAN CHECK | 2/28/2013 | | 5/1/2013 | | FAIL |
John Menard
|
|
|
John Menard
|
Route to Impact Fee Review | 2/6/2013 | 2/11/2013 | 4/9/2013 | | PASS |
Cindy M. Gould
|
|
|
Impact fees applied to BLD13-00179
|
Routing Off Site - STRUCTURAL | 3/14/2013 | | 3/21/2013 | | FAIL |
John Menard
|
|
|
Received comment list from consulting structural engineer requesting revisions. JCM
|
Telephone call | | | 3/14/2013 | | DONE |
Tisha Gallop
|
|
|
Called Action Couriers for pick up
|
Routing - PLANNING | 2/27/2013 | | 2/28/2013 | | PASS |
Josh Wilson
|
|
|
DRH12-00250 Josh Wilson
|
Routing - Erosion and Sediment | 2/13/2013 | | 2/15/2013 | | FAIL |
Kimberly M. Johnson
|
|
|
Need more information on non-stormwater discharges. Where will these discharges be directed to. Need phasing plan for clearing and grubbing and permanent stabilization. Ref ESC13-0069 for Plan
|
Routing PW Street Lights | 2/14/2013 | | 2/14/2013 | | FAIL |
Mike D Hedge
|
|
|
|
Routing - PUBLIC WORKS | 2/8/2013 | | 2/13/2013 | | FAIL |
Connie Baumgartner
|
|
|
|
Routing PW Sewer Rating | 2/13/2013 | | 2/13/2013 | | PASS |
Connie Baumgartner
|
|
|
|
Routing PW Sewer Design | 2/13/2013 | | 2/13/2013 | | FAIL |
Kyle S. Rosenmeyer
|
|
|
Existing main in Lysted 15", not 18". Sewer tap permit required and CCTV inspection of new manhole installation. Existing stub provided off lysted needs to be plugged at manhole, and the base re-channeled.
|
Routing PW Solid Waste | 2/13/2013 | | 2/13/2013 | | FAIL |
Peter J. McCullough
|
|
|
|
Routing - Addressing | 2/8/2013 | | 2/8/2013 | | PASS |
Jason C. Taylor
|
|
|
|
Routing - PLANNING Land Div | 2/7/2013 | | 2/8/2013 | | PASS |
Todd Tucker
|
|
|
|
Application received | | 2/6/2013 | 2/7/2013 | | DONE |
Tisha Gallop
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 2/6/2013 | | DONE |
Tisha Gallop
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 2/6/2013 | | DONE |
Tisha Gallop
|
|
|
|