Permit Information
Permit NumberBLD13-00192
StatusFinaled
Name PETRA INC
Site Address 3872 S COUNCIL SPRING RD
Project NameThe Terraces of Boise
Customer Number 
ePlanReviewNo
Description
Duplex 1, Type A (3872 & 3874 S. Council Springls Rd.) Permit for the construction of a 2,941 sq. ft. duplex with approximately 400 sq. ft. of covered patio/porch and 832 sq. ft. of attached garage. The square footage of the garage, covered patio/porch and living space is split equally between the units with each having 2 bedrooms and 2 bathrooms. All work per the approved plans, plan review report and any notations. SP-02 zoning and setbacks per planning.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final5/5/20155/6/20155/6/2015APASS
DetailsJim Storey
Sean Phone #: ###-####
DOC - Permit Finaled5/6/20155/6/20155/6/2015PPASS
DetailsJim Storey
BLD-Framing/Rough-in5/6/20155/6/20155/6/2015ACANC
DetailsJim Storey
BLD-Final4/15/20154/16/20154/16/2015APART
DetailsJim Storey
Sean// inspection for Duplex #1 Phone #: ###-#### c/n
BLD-Energy code compliance8/14/20148/15/20148/15/2014AFAIL
DetailsJim Storey
Shawn Phone #: ###-#### west garage plm comon wall bearing studs not repaied
BLD-Framing/Rough-in8/11/20148/13/20148/13/2014PPART
DetailsJim Storey
Shawn-framing and air seal Phone #: ###-#### plm fix bearing wall studs/ seal srv ele cable in draftstop/grout grage wall/ need envlope energy aduit.
BLD-Energy code compliance7/21/20147/21/20147/21/2014PPART
DetailsJim Storey
JC Phone #: ###-#### ok for pregyp
BLD-Framing/Rough-in6/5/20146/6/20146/6/2014APART
DetailsJim Storey
JC Phone #: ###-#### exterior ok to cover
BLD-Framing/Rough-in5/2/20145/5/20145/5/2014APART
DetailsJim Storey
JC Phone #: ###-#### resubmit for garage front. ok to cover roof and ext.
BLD-Other3/27/20143/31/20143/31/2014PPART
DetailsJim Storey
2-3pm please // stem wall // JC Phone #: ###-#### wip si on site/ pad ft ok for rebar.
BLD-Foundation3/27/20143/28/20143/28/2014PPASS
DetailsJim Storey
2-3pm please // JC Phone #: ###-####
BLD-Foundation3/26/20143/27/20143/27/2014PCANC
DetailsJim Storey
3pm // JC Phone #: ###-####
Issue PAID IN FULL permit  2/28/2014 DONE
DetailsChristina Prado
OVERRIDE  2/27/2014  
Plan assigned to (CDM)2/6/20132/6/20132/27/2014 PASS
DetailsCarl D Madsen
First review completed
Routing - PLAN CHECK2/28/2013 2/27/2014 PASS
DetailsCarl D Madsen
Telephone call  2/27/2014  
Called Art Stevens and informed him the country homes permits were ready to be picked up.
Case Summary (BLD)  2/27/2014 DONE
Inspection Record Card- Bld  2/27/2014 DONE
DetailsChristina Prado
PLANS/APPL TAKEN TO FRONT DESK  2/27/2014 DONE
Telephone call  2/27/2014 DONE
DetailsChristina Prado
called Eugene to advise permits are ready for pick up
Permit Ready to Issue  2/27/2014 DONE
DetailsChristina Prado
Routing PW Environmental10/29/2013 2/26/2014 PASS
DetailsWalt Baumgartner
Plan resubmittals received  2/19/2014 DONE
DetailsChristina Prado
Received two sets of revised plan sheets marked MH201 & MH211 as well as one transmittal sheet; Plans taken and inserted by Ron Hill
Routing - MECHANICAL  2/19/2014 PASS
DetailsTroy James
Routing PW Drainage2/15/2013 2/12/2014 PASS
DetailsBrian Murphy
Routing - Erosion and Sediment10/29/2013 11/1/2013 PASS
DetailsEvan Jenkins
Routing - PLUMBING10/31/2013 10/31/2013 PASS
DetailsDaryl Spivey
Routing - PUBLIC WORKS10/29/2013 10/29/2013 PASS
DetailsConnie Baumgartner
Routing PW Solid Waste10/29/2013 10/29/2013 PASS
DetailsPeter J. McCullough
The duplexes on the dead end drive will have to move their trash and recycle carts to the main street for collection or pay for premium carry-out service.
Routing PW Sewer Rating10/29/2013 10/29/2013 PASS
DetailsConnie Baumgartner
Routing PW Sewer Design10/29/2013 10/29/2013 PASS
DetailsKyle S. Rosenmeyer
Plan resubmittals received  10/25/2013  
Complete plan set of resubmittals received
Plan Reviewer's activity  5/6/2013 DONE
DetailsScott Arellano
*PDS/Fire to verify FD access roadway and FH water supply only.
Route to Impact Fee Review2/6/20132/11/20134/9/2013 PASS
DetailsCindy M. Gould
Plan resubmittals received  3/13/2013  
Routing - PLANNING2/27/2013 2/28/2013 PASS
DetailsJosh Wilson
DRH12-00250 Josh Wilson
Routing - PLAN CHECK  2/25/2013 FAIL
DetailsCarl D Madsen
Failed pending resubmittals for shear wall engineering, emergency escape and rescue openings for the front bedrooms and clarification on rated wall transected by girder trusses. Called and talked to Bill at AG Architecture. 2-25-13 CDM.
These plans will not meet the 1st review timeframes as they are being routed with the commercial submittal package.
1st review completed  2/25/2013 FAIL
Failed pending resubmittals for shear wall engineering, emergency escape and rescue openings for the front bedrooms and clarification on rated wall transected by girder trusses. Called and talked to Bill at AG Architecture. 2-25-13 CDM.
These plans will not meet the 1st review timeframes as they are being routed with the commercial submittal package.
Routing - Erosion and Sediment2/13/2013 2/15/2013 FAIL
DetailsKimberly M. Johnson
Need more information on non-stormwater discharges. Where will these discharges be directed to. Need phasing plan for clearing and grubbing and permanent stabilization. Ref ESC13-0069 for Plan
Routing PW Sewer Rating2/13/2013 2/13/2013 PASS
DetailsConnie Baumgartner
Routing - PUBLIC WORKS2/8/2013 2/13/2013 FAIL
DetailsConnie Baumgartner
Routing - Addressing2/8/2013 2/8/2013 PASS
DetailsJason C. Taylor
Application received 2/6/20132/7/2013 DONE
DetailsTisha Gallop
Plans ACCEPTED BY PLAN TECH  2/6/2013 DONE
DetailsTisha Gallop
Recd Pcfee & Taken To Pln CK  2/6/2013 DONE
DetailsTisha Gallop