DOC - Permit Finaled | 10/28/2015 | 10/28/2015 | 10/28/2015 | P | PASS |
Jim Storey
|
|
|
|
BLD-Final | 5/5/2015 | 5/6/2015 | 5/6/2015 | A | PASS |
Jim Storey
|
|
|
Sean Phone #: ###-####
|
BLD-Final | 4/15/2015 | 4/16/2015 | 4/16/2015 | A | PART |
Jim Storey
|
|
|
Sean// inspection for Duplex #4 Phone #: ###-#### c/n
|
BLD-Energy code compliance | 9/2/2014 | 9/3/2014 | 9/3/2014 | A | PASS |
Jim Storey
|
|
|
shaun Phone #: ###-####
|
BLD-Energy code compliance | 8/27/2014 | 8/28/2014 | 8/28/2014 | P | NR |
Jim Storey
|
|
|
Shawn Phone #: ###-####
|
BLD-Framing/Rough-in | 8/27/2014 | 8/28/2014 | 8/28/2014 | P | PASS |
Jim Storey
|
|
|
Shawn Phone #: ###-####
|
BLD-Framing/Rough-in | 6/5/2014 | 6/6/2014 | 6/6/2014 | A | PART |
Jim Storey
|
|
|
JC Phone #: ###-#### exterior ok to cover
|
BLD-Footing | 4/9/2014 | 4/10/2014 | 4/10/2014 | A | DONE |
Tom Arcoraci
|
|
|
JC Phone #: ###-####
|
Issue PAID IN FULL permit | | | 2/28/2014 | | DONE |
Christina Prado
|
|
|
|
OVERRIDE | | | 2/27/2014 | | |
|
|
|
|
Plan assigned to (CDM) | 2/6/2013 | 2/6/2013 | 2/27/2014 | | PASS |
Carl D Madsen
|
|
|
First review completed
|
Inspection Record Card- Bld | | | 2/27/2014 | | DONE |
Christina Prado
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/27/2014 | | DONE |
|
|
|
|
Telephone call | | | 2/27/2014 | | DONE |
Christina Prado
|
|
|
called Eugene to advise permits are ready for pick up
|
Permit Ready to Issue | | | 2/27/2014 | | DONE |
Christina Prado
|
|
|
|
Case Summary (BLD) | | | 2/26/2014 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 2/28/2013 | | 2/26/2014 | | PASS |
Carl D Madsen
|
|
|
|
Routing - MECHANICAL | | | 2/19/2014 | | PASS |
Troy James
|
|
|
|
Plan resubmittals received | | | 2/19/2014 | | DONE |
Christina Prado
|
|
|
Received two sets of revised plan sheets marked MH201 & MH211 as well as one transmittal sheet; Plans taken and inserted by Ron Hill
|
Routing PW Drainage | 2/15/2013 | | 2/12/2014 | | PASS |
Brian Murphy
|
|
|
|
Routing - Erosion and Sediment | 10/29/2013 | | 11/1/2013 | | PASS |
Evan Jenkins
|
|
|
|
Routing - PLUMBING | 10/31/2013 | | 10/31/2013 | | PASS |
Daryl Spivey
|
|
|
|
Routing PW Drainage | 10/29/2013 | | 10/30/2013 | | PASS |
Brian Murphy
|
|
|
|
Routing PW Solid Waste | 10/29/2013 | | 10/29/2013 | | PASS |
Peter J. McCullough
|
|
|
|
Routing PW Sewer Rating | 10/29/2013 | | 10/29/2013 | | PASS |
Connie Baumgartner
|
|
|
|
Routing PW Sewer Design | 10/29/2013 | | 10/29/2013 | | PASS |
Kyle S. Rosenmeyer
|
|
|
|
Routing PW Environmental | 10/29/2013 | | 10/29/2013 | | PASS |
Walt Baumgartner
|
|
|
|
Routing - PUBLIC WORKS | 10/29/2013 | | 10/29/2013 | | PASS |
Connie Baumgartner
|
|
|
|
Plan resubmittals received | | | 10/25/2013 | | |
|
|
|
Complete plan set of resubmittals received
|
Plan Reviewer's activity | | | 5/6/2013 | | DONE |
Scott Arellano
|
|
|
PDS/Fire to verify FD access roadway and FH water supply only.
|
Route to Impact Fee Review | 2/6/2013 | 2/11/2013 | 3/13/2013 | | PASS |
Cindy M. Gould
|
|
|
|
Plan resubmittals received | | | 3/13/2013 | | |
|
|
|
|
Routing - PLANNING | 2/27/2013 | | 2/28/2013 | | PASS |
Josh Wilson
|
|
|
DRH12-00250 Josh Wilson
|
Routing - PLAN CHECK | | | 2/25/2013 | | FAIL |
Carl D Madsen
|
|
|
Failed pending resubmittals for shear wall engineering, emergency escape and rescue openings for the front bedrooms and clarification on rated wall transected by girder trusses. Called and talked to Bill at AG Architecture. 2-25-13 CDM.
These plans will not meet the 1st review timeframes as they are being routed with the commercial submittal package.
|
1st review completed | | | 2/25/2013 | | FAIL |
|
|
|
Failed pending resubmittals for shear wall engineering, emergency escape and rescue openings for the front bedrooms and clarification on rated wall transected by girder trusses. Called and talked to Bill at AG Architecture. 2-25-13 CDM.
These plans will not meet the 1st review timeframes as they are being routed with the commercial submittal package.
|
Routing - Erosion and Sediment | 2/13/2013 | | 2/15/2013 | | FAIL |
Kimberly M. Johnson
|
|
|
Need more information on non-stormwater discharges. Where will these discharges be directed to. Need phasing plan for clearing and grubbing and permanent stabilization. Ref ESC13-0069 for Plan
|
Routing PW Sewer Rating | 2/13/2013 | | 2/13/2013 | | PASS |
Connie Baumgartner
|
|
|
|
Routing - PUBLIC WORKS | | | 2/13/2013 | | FAIL |
Connie Baumgartner
|
|
|
|
Routing - Addressing | 2/8/2013 | | 2/8/2013 | | PASS |
Jason C. Taylor
|
|
|
|
Application received | | 2/6/2013 | 2/7/2013 | | DONE |
Tisha Gallop
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 2/6/2013 | | DONE |
Tisha Gallop
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 2/6/2013 | | DONE |
Tisha Gallop
|
|
|
|