Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD13-00197
StatusFinaled
Name PETRA INC
Site Address 3982 S COUNCIL SPRING RD
Project NameThe Terraces of Boise
Customer Number 
ePlanReviewNo
Description
Duplex 6, Type B (3982 & 3984 S. Council Springls Rd.) Permit for the construction of a 2,941 sq. ft. duplex with approximately 400 sq. ft. of covered patio/porch and 888 sq. ft. of attached garage. The square footage of the garage, covered patio/porch and living space is split equally between the units with each having 2 bedrooms and 2 bathrooms. All work per the approved plans, plan review report and any notations. SP-02 zoning and setbacks per planning.
Contact Information
See Activities list for contact information
Color Key
Current location of plans being reviewed:  
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final5/5/20155/6/20155/6/2015APASS
DetailsJim Storey
Sean Phone #: ###-####
DOC - Permit Finaled5/6/20155/6/20155/6/2015PPASS
DetailsJim Storey
BLD-Final4/15/20154/16/20154/16/2015APART
DetailsJim Storey
Sean// inspection for Duplex #6 Phone #: ###-#### c/n
BLD-Energy code compliance9/30/201410/1/201410/1/2014APASS
DetailsJim Sly
Sean Phone #: ###-####
BLD-Framing/Rough-in9/23/20149/23/20149/23/2014PPASS
DetailsDave Hannah
Sean Phone #: ###-####
BLD-Wall Bracing7/23/20147/25/20147/25/2014APASS
DetailsJim Storey
please call ahead - shawn Phone #: ###-####exterior ok to cover
BLD-Foundation4/30/20144/30/20144/30/2014PDONE
DetailsJim Storey
JC Phone #: ###-####
Issue PAID IN FULL permit  2/28/2014 DONE
DetailsChristina Prado
OVERRIDE  2/27/2014  
Plan assigned to (CDM)2/7/20132/7/20132/27/2014 PASS
DetailsCarl D Madsen
First review completed
Routing - PLAN CHECK2/28/2013 2/27/2014 PASS
DetailsCarl D Madsen
Inspection Record Card- Bld  2/27/2014 DONE
DetailsChristina Prado
Case Summary (BLD)  2/27/2014 DONE
PLANS/APPL TAKEN TO FRONT DESK  2/27/2014 DONE
Telephone call  2/27/2014 DONE
DetailsChristina Prado
called Eugene to advise permits are ready for pick up
Permit Ready to Issue  2/27/2014 DONE
DetailsChristina Prado
Plan resubmittals received  2/19/2014 DONE
DetailsChristina Prado
Received two sets of revised plan sheets marked MH201 & MH211 as well as one transmittal sheet; Plans taken and inserted by Ron Hill
Routing - MECHANICAL2/19/2014 2/19/2014 PASS
DetailsTroy James
Routing PW Drainage2/15/2013 2/12/2014 PASS
DetailsBrian Murphy
Routing - MECHANICAL  11/5/2013 FAIL
DetailsTroy James
emailed corrections to Anthony Luciano AG Architecture
Routing - Erosion and Sediment11/1/2013 11/1/2013 PASS
DetailsEvan Jenkins
Routing - PLUMBING10/31/2013 10/31/2013 PASS
DetailsDaryl Spivey
Routing PW Drainage10/29/2013 10/30/2013 PASS
DetailsBrian Murphy
Routing PW Solid Waste10/29/2013 10/29/2013 PASS
DetailsPeter J. McCullough
Routing PW Sewer Rating10/29/2013 10/29/2013 PASS
DetailsConnie Baumgartner
Routing PW Sewer Design10/29/2013 10/29/2013 PASS
DetailsKyle S. Rosenmeyer
Routing PW Environmental10/29/2013 10/29/2013 PASS
DetailsWalt Baumgartner
Routing - PUBLIC WORKS10/29/2013 10/29/2013 PASS
DetailsConnie Baumgartner
Plan resubmittals received  10/25/2013  
Complete plan set of resubmittals received
Plan Reviewer's activity  5/6/2013 DONE
DetailsScott Arellano
*PDS/Fire to verify FD access roadway and FH water supply only.
Route to Impact Fee Review2/6/20132/11/20133/13/2013 PASS
DetailsCindy M. Gould
Plan resubmittals received  3/13/2013  
Routing - PLANNING2/27/2013 2/28/2013 PASS
DetailsJosh Wilson
DRH12-00250 Josh Wilson
Routing - PLAN CHECK  2/25/2013 FAIL
DetailsCarl D Madsen
Failed pending resubmittals for shear wall engineering, emergency escape and rescue openings for the front bedrooms and clarification on rated wall transected by girder trusses. Called and talked to Bill at AG Architecture. 2-25-13 CDM
1st review completed  2/25/2013 FAIL
Failed pending resubmittals for shear wall engineering, emergency escape and rescue openings for the front bedrooms and clarification on rated wall transected by girder trusses. Called and talked to Bill at AG Architecture. 2-25-13 CDM.
These plans will not meet the 1st review timeframes as they are being routed with the commercial submittal package.
Routing - Erosion and Sediment2/13/2013 2/15/2013 PASS
DetailsKimberly M. Johnson
Need more information on non-stormwater discharges. Where will these discharges be directed to. Need phasing plan for clearing and grubbing and permanent stabilization. Ref ESC13-0069 for Plan
Routing PW Sewer Rating2/13/2013 2/13/2013 PASS
DetailsConnie Baumgartner
Routing - PUBLIC WORKS  2/13/2013 FAIL
DetailsConnie Baumgartner
Routing - Addressing2/8/2013 2/8/2013 PASS
DetailsJason C. Taylor
Application received 2/6/20132/7/2013 DONE
DetailsTisha Gallop
Plans ACCEPTED BY PLAN TECH  2/6/2013 DONE
DetailsTisha Gallop
Recd Pcfee & Taken To Pln CK  2/6/2013 DONE
DetailsTisha Gallop
Routing - Erosion and Sediment10/29/2013