Permit NumberBLD13-00222
StatusFinaled
Name VISTA CONSTRUCTION INC
Site Address 200 W FRONT ST
Project NameAda County Courthouse Appeals
Customer Number 
ePlanReviewYes
Description
(ADA COUNTY COURTHOUSE – Appeals Remodel – 1st FLOOR) This building is fully fire sprinklered for floor level above 55 feet and unlimited area building. To remodel an existing 700 square foot microfilm area and convert it to additional open office area. This permit is approved contingent upon adhering to the approved plans on file and attached specifications. Work includes: demolition of interior non-bearing wall to create a 4 foot opening, installation of a new interior non-bearing wall to separate the area in two, new lighting in new open office area, and interior finishes. This building is fully Fire Sprinklered with an approved Fire Alarm system. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. **TLW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice 5/13/20135/8/2013 DONE
Second Notice 5/3/20135/8/2013 DONE
First Notice4/15/20134/15/20134/23/2013 DONE
DetailsDave Hannah
BLD-Final4/15/20134/15/20134/15/2013PPASS
DetailsDave Hannah
Mike Phone #: ###-####
DOC - Permit Finaled4/15/20134/15/20134/15/2013PPASS
DetailsDave Hannah
FIRE-Final Inspection4/15/20134/15/20134/15/2013PPASS
DetailsTroy Cobbley
Life safety passed
BLD-Framing/Rough-in3/19/20133/19/20133/19/2013PPASS
DetailsDave Hannah
Mike Phone #: ###-####
Permit Ready to Issue  3/6/2013  
Inspection Record Card- Bld  3/6/2013  
Issue PAID IN FULL permit  3/6/2013 DONE
Payment Received  2/11/2013 DONE
Payment received via Govolutions
Intake Approval  2/11/2013 PASS
DetailsTim L. Woodard
Plan assigned to (TLW)2/11/2013 2/11/2013 PASS
DetailsTim L. Woodard
Routing - PLAN CHECK2/11/2013 2/11/2013 PASS
DetailsTim L. Woodard
1st review completed  2/11/2013 DONE
DetailsTim L. Woodard
PLANS/APPL TAKEN TO FRONT DESK  2/11/2013 DONE
DetailsTim L. Woodard
Case Summary (BLD)  2/11/2013 DONE
DetailsTim L. Woodard
Application received  2/8/2013 DONE
Application submitted via PDS Online on Feb 8 2013 1:26PM
Intake Approval  2/8/2013 FAIL
DetailsTim L. Woodard
Ken,

Please upload each plan sheet separatly into the drawings folder. Each sheet should be named with its corresponding sheet number and a discription work. Such as A1.0 - Floor Plan. Refer to the "Electronic Submittal Guide" for additional information.

Tim Woodard
City of Boise
Plans Examiner II
###-####