DOC - Permit Finaled | | | 12/23/2015 | | DONE |
|
|
|
|
BLD-Final | 1/2/2015 | 1/5/2015 | 1/5/2015 | P | PASS |
Dave Hannah
|
|
|
Call so he can let you into the building // Roger Phone #: ###-####
|
FIRE-Final Inspection | 12/30/2014 | 12/31/2014 | 12/31/2014 | A | PASS |
Forrest France
|
|
|
Scope of permit work completed. Fire life safety inspection passed. Need to repost suite address numbers as discussed.
|
BLD-Wall Bracing | 3/22/2013 | 3/25/2013 | 3/25/2013 | A | PART |
Tony Young
|
|
|
george Phone #: ###-####,, 1st layer ok after adding more screws
|
BLD-Framing/Rough-in | 3/5/2013 | 3/5/2013 | 3/7/2013 | A | PASS |
Dave Hannah
|
|
|
George Phone #: ###-#### second layer 2hr passage way 14 floor ok to finish.
|
BLD-Framing/Rough-in | 2/26/2013 | 2/27/2013 | 3/7/2013 | P | PART |
Dave Hannah
|
|
|
George Phone #: ###-#### finish layer inside nw stair tower 14 and 15 floor pass. first layer 2hr passage way 14 floor ok to cover with secon layer.
|
BLD-Wall cover | 2/21/2013 | 2/22/2013 | 2/25/2013 | A | PART |
Dave Hannah
|
|
|
george Phone #: ###-#### south stair tower ok to cover
|
Issue PAID IN FULL permit | | | 2/13/2013 | | DONE |
Barbara Stitt
|
|
|
|
Application received | | 2/12/2013 | 2/12/2013 | | DONE |
Barbara Stitt
|
|
|
|
Inspection Record Card- Bld | | | 2/12/2013 | | DONE |
Barbara Stitt
|
|
|
|
Permit Ready to Issue | | | 2/12/2013 | | DONE |
Barbara Stitt
|
|
|
|