BLD-Final | 6/24/2013 | 6/25/2013 | 6/25/2013 | A | PASS |
Mike Jordan
|
|
|
Nathan Phone #: ###-####
|
DOC - Permit Finaled | 6/25/2013 | 6/25/2013 | 6/25/2013 | P | PASS |
Mike Jordan
|
|
|
|
BLD-Final | 6/21/2013 | 6/24/2013 | 6/24/2013 | P | FAIL |
Tom Arcoraci
|
|
|
Nathan-as late as possible please Phone #: ###-#### cn posted needs siding installed on osb
|
BLD-Framing/Rough-in | 6/11/2013 | 6/12/2013 | 6/12/2013 | A | PASS |
Mike Jordan
|
|
|
nathan Phone #: ###-####
|
BLD-Framing/Rough-in | 5/3/2013 | 5/6/2013 | 5/6/2013 | A | CANC |
Mike Jordan
|
|
|
nathan Phone #: ###-####
|
BLD-Wall Bracing | 5/6/2013 | 5/6/2013 | 5/6/2013 | A | PASS |
Mike Jordan
|
|
|
nathan Phone #: ###-####
|
BLD-Foundation | 4/1/2013 | 4/2/2013 | 4/2/2013 | P | PART |
Mike Jordan
|
|
|
nathen Phone #: ###-####
|
BLD-Footing | 3/29/2013 | 4/1/2013 | 4/1/2013 | A | PART |
Mike Jordan
|
|
|
nathan Phone #: ###-####
|
OVERRIDE | | | 3/6/2013 | | |
|
|
|
|
Plan assigned to (PEP) | 3/6/2013 | 3/6/2013 | 3/6/2013 | | PASS |
Perry Paine
|
|
|
|
Routing Walk-In (BLD) | 3/5/2013 | 3/5/2013 | 3/6/2013 | P | DONE |
Perry Paine
|
|
|
|
Inspection Record Card- Bld | | | 3/6/2013 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 3/6/2013 | | DONE |
|
|
|
|
1st review completed | | | 3/6/2013 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/6/2013 | | |
|
|
|
|
Telephone call | | | 3/6/2013 | | DONE |
Christina Prado
|
|
|
called Nathan to give fees due (including Rp books) and advise permit is ready
|
Permit Ready to Issue | | | 3/6/2013 | | DONE |
Christina Prado
|
|
|
|
Routing Walk-In (Zoning) | 2/14/2013 | 2/15/2013 | 2/15/2013 | A | PASS |
Colleen T Carroll
|
|
|
|
Routing Walk-In (BLD) | 2/15/2013 | 2/15/2013 | 2/15/2013 | P | FAIL |
Perry Paine
|
|
|
Engineering on the tall walls and the shear on the garage door wall. 2-15-12 CDM
|
Routing Walk-In (Zoning) | 2/12/2013 | 2/12/2013 | 2/14/2013 | A | FAIL |
Christina Prado
|
|
|
need CUP approval for detached in front of house
|
Application received | | 2/12/2013 | | | |
|
|
|
|