Information based on query as of Tuesday, July 16, 2024.
Permit Information
Permit NumberBLD13-00261
StatusFinaled
Name TAHOE HOMES LLC
Site Address 3082 E HEARTLEAF LN
Project Name 
Customer Number 
ePlanReviewNo
Description
**WUI "B" Valley with WUI Hillside "A" requirements.** Permit for the construction of a new 2421 sq. ft., two story (first story 1050 sq. ft., second story 1371 sq. ft.) single family dwelling with 3 bedrooms, 2.5 bathrooms, approximately 120 sq. ft. of covered patio/porch and a 534 sq. ft. attached garage per the approved plans, plan review report, attached engineering and any notations. R-2D zoning and setbacks per planning. WUI zone A requirements. A letter from the applicant’s geotechnical engineer indicating that the footing sub-grade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at 384-3946. CDM
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Letter of compliance/Occupancy  6/3/2014 DONE
DetailsCandy A. Nichols
BLD-Final9/5/20139/6/20139/6/2013APASS
DetailsTom Arcoraci
clint Phone #: ###-####
DOC - Permit Finaled9/6/20139/6/20139/6/2013PPASS
DetailsTom Arcoraci
BLD-Final8/27/20138/28/20138/28/2013AFAIL
DetailsJim Storey
clint Phone #: ###-#### massanary wall unsupported on sub floor provide engineering to justify load and design.
PubWorks Occupancy Approval8/28/20138/28/20138/28/2013 DONE
DetailsJason C. Taylor
Recieved civil engineers approval for sitew gading and drainage. Project is approved for occupancy. Jason Talyor ###-####.
BLD-Energy code compliance6/17/20136/18/20136/18/2013APASS
DetailsJim Storey
Phone #: ###-#### >> Inspection requested via web by Clint Wall
BLD-Framing/Rough-in6/13/20136/14/20136/14/2013APASS
DetailsJim Storey
Phone #: ###-#### >> Inspection requested via web by Clint Wall
BLD-Other6/10/20136/10/20136/10/2013PPASS
DetailsJim Storey
CLINT Phone #: ###-#### soffits ok to cover
BLD-Wall Bracing5/30/20135/30/20135/30/2013PPASS
DetailsJim Storey
Joey Phone #: ###-####
BLD-Framing/Rough-in5/23/20135/23/20135/23/2013PPART
DetailsJim Storey
Joey-Shear inspection Please Phone #: ###-#### 2nd floor ok
BLD-Foundation4/2/20134/2/20134/2/2013PPASS
DetailsJim Storey
Alvaro Phone #: ###-####
BLD-Footing4/1/20134/1/20134/1/2013PPASS
DetailsJim Storey
Alvaro Phone #: ###-####
BLD-Footing3/29/20133/29/20133/29/2013PCANC
DetailsTom Arcoraci
ready at 4:30//Anton Phone #: ###-####
PubWorks Subgrade Approval3/22/20133/22/20133/22/2013 DONE
DetailsJason C. Taylor
Recieved subgrade approval from geotechnical engineer. Building department can be scheduled for footing inspection. Jason Taylor ###-####.
OVERRIDE  3/7/2013  
Plan assigned to (CDM) 2/14/20133/7/2013 PASS
DetailsCarl D Madsen
PLANS/APPL TAKEN TO FRONT DESK  3/7/2013  
Inspection Record Card- Bld  3/7/2013 DONE
DetailsBarbara Stitt
Telephone call  3/7/2013 DONE
DetailsChristina Prado
advised permit is ready and gave fees due
Permit Ready to Issue  3/7/2013 DONE
DetailsChristina Prado
Issue PAID IN FULL permit  3/7/2013 DONE
DetailsChristina Prado
Plan resubmittals received  3/6/2013 DONE
DetailsChristina Prado
received three sets of plans marked C2; taken to Carl for further review
Routing PW Grading-Hillside3/6/2013 3/6/2013 PASS
DetailsJason C. Taylor
Prior to scheduling footing inspection, Geotechnical Engineer must approve footing subgrade. Jason Taylor ###-####
1st review completed  2/28/2013 FAIL
Failed pending grading and drainage 2-28-13 CDM
Case Summary (BLD)  2/28/2013 DONE
Routing - PLAN CHECK  2/28/2013 PASS
DetailsCarl D Madsen
Routing - FIRE2/20/2013 2/22/2013 PASS
DetailsTim Frost
Telephone call  2/21/2013 DONE
Called Romeo and told him I could not verify that the East Heartleaf Lane is not a dead end at this time. I am waiting on a call from Romeo if fire sprinklers should be required.
Routing - MECHANICAL2/19/2013 2/20/2013 PASS
DetailsTroy James
Routing - PLANNING2/15/2013 2/19/2013 PASS
DetailsDavid Moser
Route to Impact Fee Review2/13/20132/19/20132/15/2013 PASS
DetailsCindy M. Gould
Routing - Addressing2/14/2013 2/15/2013 PASS
DetailsJason C. Taylor
Routing - PUBLIC WORKS  2/15/2013 PASS
DetailsConnie Baumgartner
Routing - Erosion and Sediment2/14/2013 2/14/2013 PASS
DetailsChristina Prado
Per Kim Johnson - No ESC review required for this project
Plans ACCEPTED BY PLAN TECH  2/14/2013 DONE
DetailsChristina Prado
Intake Approval  2/14/2013 PASS
DetailsChristina Prado
Recd Pcfee & Taken To Pln CK  2/14/2013 DONE
DetailsChristina Prado
Intake Approval  2/13/2013 FAIL
DetailsChristina Prado
grading sheet needs to be signed
Application received 2/13/2013