Permit Information
Permit NumberBLD13-00264
StatusFinaled
Name TAHOE HOMES LLC
Site Address 3044 E HEARTLEAF LN
Project Name 
Customer Number 
ePlanReviewNo
Description
"Structure is located in WUI zone A" Permit for the construction of a new 2,560 sq. ft., three story (first story 590 sq. ft., second story 1,380 sq. ft., third story 590 sq. ft.) single family dwelling with 2 bedrooms, 3 bathrooms, approximately 194 sq. ft. of covered patio/porch and a 700 sq. ft. attached garage per the approved plans, plan review report and any notations. R-2D zoning and setbacks per planning. A letter from the applicant’s geotechnical engineer indicating that the footing sub-grade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at 384-3946. CDM
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final9/16/20139/17/20139/17/2013APASS
DetailsJim Storey
Clint Phone #: ###-####
DOC - Permit Finaled9/17/20139/17/20139/17/2013PPASS
DetailsJim Storey
PubWorks Occupancy Approval9/17/20139/17/20139/17/2013 DONE
DetailsJason C. Taylor
Recieved Civil engineers approval for site grading and drainage. OK'd for occupancy. Jason Taylor ###-####.
BLD-Energy code compliance6/11/20136/12/20136/12/2013APASS
DetailsJim Storey
Phone #: ###-#### >> Inspection requested via web by Clint Wall
BLD-Framing/Rough-in6/10/20136/11/20136/11/2013APART
DetailsJim Storey
Clint Phone #: ###-#### max sill height egress window 42 inches floor to finshed sill/ fire blk ceilling shower/bath 1 st floor drop unusable space. ok to insulate.
Plan resubmittals received  6/10/2013 DONE
new manual j
Routing - MECHANICAL6/10/2013 6/10/2013 PASS
DetailsTroy James
resubmitted manual j
BLD-Other5/23/20135/23/20135/23/2013PPASS
DetailsJim Storey
fire soffit inspection Phone #: ###-#### >> Inspection requested via web by Clint Wall
BLD-Other5/21/20135/23/20135/23/2013APASS
DetailsJim Storey
fire block insp//Clint Phone #: ###-####
BLD-Framing/Rough-in5/16/20135/16/20135/16/2013PPASS
DetailsJim Storey
Joey-Shear inspection please Phone #: ###-####
BLD-Wall Bracing5/9/20135/9/20135/9/2013PPASS
DetailsJim Storey
joey Phone #: ###-#### exterior walls ok to cover.
BLD-Foundation3/28/20133/28/20133/28/2013PPASS
DetailsJim Storey
Anton Phone #: ###-####
BLD-Footing3/27/20133/27/20133/27/2013PPASS
DetailsJim Storey
anton Phone #: ###-####
BLD-Footing3/25/20133/26/20133/27/2013ANR
DetailsJim Storey
Late am please-Anton Phone #: ###-####
PubWorks Subgrade Approval3/20/20133/20/20133/20/2013 DONE
DetailsJason C. Taylor
Approval from geotechnical engineer recieved. Building inspector can be scheduled. Jason Talyor ###-####
OVERRIDE  3/7/2013  
Plan assigned to (CDM) 2/14/20133/7/2013 PASS
DetailsCarl D Madsen
Routing - PLAN CHECK3/7/2013 3/7/2013 PASS
DetailsCarl D Madsen
PLANS/APPL TAKEN TO FRONT DESK  3/7/2013  
Case Summary (BLD)  3/7/2013 DONE
Inspection Record Card- Bld  3/7/2013 DONE
DetailsBarbara Stitt
Permit Ready to Issue  3/7/2013 DONE
DetailsChristina Prado
Telephone call  3/7/2013 DONE
DetailsChristina Prado
advised permit is ready and gave fees due
Issue PAID IN FULL permit  3/7/2013 DONE
DetailsChristina Prado
Plan resubmittals received  3/6/2013 DONE
DetailsChristina Prado
received two sets of plans marked A4.0 & three sets of plans marked C2; taken to Carl for further review
Routing PW Grading-Hillside3/6/2013 3/6/2013 PASS
DetailsJason C. Taylor
Prior to scheduling footing inspection, Geotechnical Engineer must approve footing subgrade. Jason Taylor ###-####
Routing - PLAN CHECK  2/28/2013 FAIL
DetailsCarl D Madsen
Failed pending structural resubmittals E-Mailed Leonard with Tahoe 2-28-13 CDM
1st review completed  2/28/2013 FAIL
Routing - FIRE2/21/2013 2/22/2013 PASS
DetailsScott Arellano
Routing - MECHANICAL2/19/2013 2/21/2013 PASS
DetailsTroy James
Routing - PLANNING2/15/2013 2/19/2013 PASS
DetailsDavid Moser
Approved as redlined; Wall next to main door shall comply with 3 foot side setback or reduce wall height to 6 feet
Route to Impact Fee Review2/13/20132/19/20132/15/2013 PASS
DetailsCindy M. Gould
Routing - Addressing2/14/2013 2/15/2013 PASS
DetailsJason C. Taylor
Routing - PUBLIC WORKS GRADING2/14/2013 2/15/2013 PASS
DetailsConnie Baumgartner
Routing - Erosion and Sediment2/14/2013 2/14/2013 PASS
DetailsChristina Prado
Per Kim Johnson - No ESC review is required for this lot
Plans ACCEPTED BY PLAN TECH  2/14/2013 DONE
DetailsChristina Prado
Intake Approval  2/14/2013 PASS
DetailsChristina Prado
Recd Pcfee & Taken To Pln CK  2/14/2013 DONE
DetailsChristina Prado
Intake Approval  2/13/2013 FAIL
DetailsChristina Prado
grading sheet needs to be signed
Application received 2/13/2013