BLD-Final | 11/5/2013 | 11/6/2013 | 11/6/2013 | A | PASS |
Mike Jordan
|
|
|
Jared Phone #: ###-####
|
DOC - Permit Finaled | 11/6/2013 | 11/6/2013 | 11/6/2013 | P | PASS |
Mike Jordan
|
|
|
|
PubWorks Occupancy Approval | 11/5/2013 | 11/5/2013 | 11/5/2013 | | DONE |
Jason C. Taylor
|
|
|
Project completed. Recieved engineers approval for site drainage and grading. Ok for occupancy by P.W. Jason Taylor ###-####
|
BLD-Final | 10/15/2013 | 10/16/2013 | 10/16/2013 | A | NR |
Tom Arcoraci
|
|
|
Jarrod Phone #: ###-####
|
BLD-Energy code compliance | 7/2/2013 | 7/3/2013 | 7/3/2013 | A | PASS |
Dave Hannah
|
|
|
Jared Phone #: ###-####
|
BLD-Framing/Rough-in | 7/1/2013 | 7/2/2013 | 7/2/2013 | A | PASS |
Jim Sly
|
|
|
Patrick Phone #: ###-####
|
BLD-Framing/Rough-in | 6/27/2013 | 6/28/2013 | 6/28/2013 | A | FAIL |
Tony Young
|
|
|
jared Phone #: ###-####,, correction posted,, do not insulate
|
BLD-Other | 6/6/2013 | 6/7/2013 | 6/7/2013 | A | PART |
Tony Young
|
|
|
fire rated soffits - Jarod Phone #: ###-####,, 1st layer ok
|
Plan resubmittals received | | | 6/5/2013 | | DONE |
|
|
|
new manual j
|
Routing - MECHANICAL | 6/5/2013 | | 6/5/2013 | | PASS |
Troy James
|
|
|
resubmitted manual j
|
BLD-Wall Bracing | 5/31/2013 | 6/3/2013 | 6/3/2013 | A | PASS |
Tom Arcoraci
|
|
|
JAROD Phone #: ###-####
|
BLD-Foundation | 4/23/2013 | 4/24/2013 | 4/26/2013 | P | PASS |
Dave Hannah
|
|
|
hyrum Phone #: ###-####
|
BLD-Footing | 4/22/2013 | 4/23/2013 | 4/23/2013 | A | PART |
Dave Hannah
|
|
|
2nd footing - Hyrun Phone #: ###-#### upper level forms up and horz bar in waiting for engioneer on vert splacing ok to place concrete
|
PubWorks Subgrade Approval | 4/23/2013 | 4/23/2013 | 4/23/2013 | | DONE |
Jason C. Taylor
|
|
|
Recieved subgrade approval for column pads (4-southern & 2 eastern). Building department may be scheduled for inspections. Jason Taylor ###-####
|
PubWorks Subgrade Approval | 4/22/2013 | 4/22/2013 | 4/22/2013 | | DONE |
Jason C. Taylor
|
|
|
Recieved subgrade approval for footing locations to the north of the basement wall. Building department may be scheduled for inspections. Jason Taylor ###-####
|
BLD-Foundation | 4/11/2013 | 4/12/2013 | 4/15/2013 | A | PART |
Dave Hannah
|
|
|
hyrum Phone #: ###-#### basement walls
|
BLD-Footing | 4/8/2013 | 4/9/2013 | 4/10/2013 | P | PART |
Dave Hannah
|
|
|
hyrum Phone #: ###-#### basement ftgs ok
|
PubWorks Subgrade Approval | 3/28/2013 | 3/28/2013 | 3/28/2013 | | DONE |
Jason C. Taylor
|
|
|
Subgrade approval recieved from geotechnical engineer for entire building footprint. Building department may be scheduled for footing inspections. Jason Taylor ###-####.
|
Issue PAID IN FULL permit | | | 3/25/2013 | | DONE |
Barbara Stitt
|
|
|
|
OVERRIDE | | | 3/20/2013 | | |
|
|
|
|
Plan assigned to (AJS) | 3/12/2013 | 3/12/2013 | 3/20/2013 | | DONE |
Adele J Schaffeld-Griffin
|
|
|
Recieved resised plans 3/18/13. spoke with Jarrod 3/19/13. The revised sheets did not iclude the engineers stamp for the existing stamped sheets. He will get them re submitted or have the engineer come in and stamp them. 3/19/13 ajs
|
Routing - PLAN CHECK | 3/20/2013 | | 3/20/2013 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/20/2013 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 3/20/2013 | | DONE |
Adele J Schaffeld-Griffin
|
|
|
|
Inspection Record Card- Bld | | | 3/20/2013 | | DONE |
Tisha Gallop
|
|
|
|
Telephone call | | | 3/20/2013 | | DONE |
Christina Prado
|
|
|
called Jerrod to advise permit is ready pending Rp and gave fees due. ***plans in comm drawer under street***
|
Permit Ready to Issue | | | 3/20/2013 | | DONE |
Christina Prado
|
|
|
|
Plan resubmittals received | | | 3/19/2013 | | |
|
|
|
Received 2 copies of sheets 2, 3.1, 4, 5, 8.1, 10, 11 and taken to Adele's desk
|
Plan resubmittals received | | | 3/18/2013 | | |
|
|
|
Recieved 2 copies of cover transmittal, 2 copies of sheets 2, 3.1, 4, 5, 8.1, 10, 11 and taken to Adele's desk
|
Plan assigned to (CDM) | 2/20/2013 | 2/20/2013 | 3/12/2013 | | DEFR |
Carl D Madsen
|
|
|
Deferred to Adele
|
1st review completed | | | 3/12/2013 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
emailed comments to Jarrod 3/12/13
|
Routing PW Grading-Hillside | 3/12/2013 | | 3/12/2013 | | PASS |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing sub-grade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at ###-####
Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Jason Taylor at ###-####.
|
Plan resubmittals received | | | 3/12/2013 | | |
|
|
|
Recieved 3 copies of sheets C1.0, C2.0, C3.0
|
Routing PW Grading-Hillside | 3/5/2013 | | 3/6/2013 | | FAIL |
Jason C. Taylor
|
|
|
Grading plans need revised. Left message with civil engineer. Jason Taylor ###-####
|
Routing - PLANNING | 3/5/2013 | | 3/6/2013 | | PASS |
David Moser
|
|
|
Approved as redlined, reduce chimney height to 35 feet
|
Routing - MECHANICAL | 3/4/2013 | | 3/4/2013 | | PASS |
Troy James
|
|
|
|
Plan resubmittals received | | | 3/4/2013 | | DONE |
Tisha Gallop
|
|
|
received two new sets of plans (sheets , 2, 3, 3.1, 4, 5, 6, 6.1, 7, 8, 8.1, 9, 10, 11, 12) and three sets of civils (sheets C1.0, C2.0, C3.0); taken to Carl Madsen.
|
Routing - FIRE | 3/1/2013 | | 3/4/2013 | | PASS |
Scott Arellano
|
|
|
No comments.
|
Routing - MECHANICAL | 2/28/2013 | | 3/1/2013 | | FAIL |
Troy James
|
|
|
emailed correction to Teds Heating
|
Routing - Erosion and Sediment | 3/1/2013 | | 3/1/2013 | | PASS |
Kimberly M. Johnson
|
|
|
|
Routing - PLANNING | 2/28/2013 | | 2/28/2013 | | FAIL |
David Moser
|
|
|
The building encrouches into both side yards setbacks. call applicant on 2-28-13 and let him know about the setbacks.
|
Routing - Addressing | 2/20/2013 | | 2/28/2013 | | PASS |
Jason C. Taylor
|
|
|
|
Routing - PUBLIC WORKS | 2/28/2013 | | 2/28/2013 | | PASS |
Connie Baumgartner
|
|
|
|
Routing PW Grading-Hillside | 2/20/2013 | | 2/28/2013 | | FAIL |
Jason C. Taylor
|
|
|
Grading plan needs revised, or project needs a Category 1 (old) permit. Jason Talyor ###-####
|
Route to Impact Fee Review | 2/20/2013 | 2/25/2013 | 2/26/2013 | | PASS |
Cindy M. Gould
|
|
|
|
Intake Approval | | | 2/20/2013 | | PASS |
Tisha Gallop
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 2/20/2013 | | DONE |
Tisha Gallop
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 2/20/2013 | | DONE |
Tisha Gallop
|
|
|
|
Intake Approval | | | 2/19/2013 | | FAIL |
Tisha Gallop
|
|
|
need full size sheets ESC (x2) & Civils (x3)
|
Application received | | | 2/18/2013 | | DONE |
|
|
|
Application submitted via PDS Online on Feb 18 2013 4:03PM
|
Routing - PLAN CHECK | 3/4/2013 | | | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
plan check comments emailed to Jarroed 3/12/13
|