Third Notice | | 1/4/2014 | 1/9/2014 | | DONE |
Christina Prado
|
|
|
|
Third Notice | | 12/4/2013 | 12/30/2013 | | DONE |
|
|
|
mailed to GC
|
Third Notice | | 11/4/2013 | 11/29/2013 | | DONE |
|
|
|
faxed to GC
|
Second Notice | | 10/11/2013 | 10/30/2013 | | DONE |
|
|
|
Faxed 10-30-13
|
First Notice | | 9/1/2013 | 10/1/2013 | | DONE |
|
|
|
|
Zoning Approval | 8/22/2013 | 8/22/2013 | 8/22/2013 | | PASS |
Josh Wilson
|
|
|
Landscaping complete.
|
Permanent Occupancy | | | 8/22/2013 | | DONE |
Barbara Stitt
|
|
|
|
PubWorks Occupancy Approval | 8/21/2013 | 8/21/2013 | 8/21/2013 | | DONE |
Tiffany Lowery
|
|
|
|
BLD-Conference | 8/13/2013 | 8/13/2013 | 8/13/2013 | P | DONE |
Jim Sly
|
|
|
Called Jackson Food Stores....Left Robert a V/M.......Need to obtain Perm Occ. Need P/W and Zoning final.
|
BLD-Aging Inspection | 8/9/2013 | 8/9/2013 | 8/13/2013 | | DONE |
Jim Sly
|
|
|
|
Plan resubmittals received | | | 6/5/2013 | | DONE |
Christina Prado
|
|
|
received 5 sets of plans marked C-1a as well as letter addressed to Brian Murphy; Plans taken directly to Brian as change is "field only"
|
BLD-Final | 5/22/2013 | 5/23/2013 | 5/23/2013 | P | PART |
Jim Sly
|
|
|
Kenny-Early pm please Phone #: ###-#### OK for Temp Occ. OK for Perm Occ. when Public Works and Zoning Perms.
|
BLD-Final | 5/21/2013 | 5/22/2013 | 5/23/2013 | P | CANC |
Jim Sly
|
|
|
Kenny Phone #: ###-####
|
FIRE-Final Inspection | 5/22/2013 | 5/23/2013 | 5/23/2013 | A | PASS |
Troy Cobbley
|
|
|
Life safety passed
|
Temporary Occupancy | 5/23/2013 | 8/21/2013 | 5/23/2013 | | DONE |
Barbara Stitt
|
|
|
|
PubWorks Temp Occupancy Appr | 5/23/2013 | 5/23/2013 | 5/23/2013 | | DONE |
Jason C. Taylor
|
|
|
Bond placed for drainage. Temporary Occupancy approved by PW. Jason Taylor ###-####. Drainage facilities must be inspected by city inspectors prior to placement. Project engineer must be consulted to repair previously placed work.
|
Zoning Approval Temp | 5/23/2013 | 5/23/2013 | 5/23/2013 | | PASS |
Josh Wilson
|
|
|
Small amount of landcaping left. 30-day temp occ OK JGW 5-23-13
|
FIRE-Final Inspection | 5/22/2013 | 5/22/2013 | 5/22/2013 | P | FAIL |
Troy Cobbley
|
|
|
The contractor had the approved plans but still does not have the small documents. I explained the electronic plan review process and the need for all of the documents. Fire extinguisher has been provided at pumps.
|
FIRE-Final Inspection | 5/21/2013 | 5/22/2013 | 5/22/2013 | A | FAIL |
Troy Cobbley
|
|
|
No city approved plans or notes on site. I noted that a fire extinguisher is required at the pumps since they exceed 75' from the one in the building.
|
BLD-Ceiling Grid Inspection | 5/16/2013 | 5/17/2013 | 5/17/2013 | P | PASS |
Jim Sly
|
|
|
kenny Phone #: ###-####
|
BLD-Footing | 5/6/2013 | 5/7/2013 | 5/7/2013 | P | CANC |
Jim Sly
|
|
|
###-#### customer would like around 2:00 PM
|
BLD-Conference | 5/1/2013 | 5/2/2013 | 5/2/2013 | A | PASS |
Jim Sly
|
|
|
chuck Phone #: ###-#### Note..........Inspection and approval of front Canopy Framing...OK.
|
BLD-Other | 4/25/2013 | 4/29/2013 | 4/29/2013 | A | PASS |
Jim Sly
|
|
|
request 8:30/grout insp//Chuck Phone #: ###-#### OK Pending MTI insp, tests, and approvals.
|
BLD-Framing/Rough-in | 4/25/2013 | 4/26/2013 | 4/26/2013 | P | PART |
Jim Sly
|
|
|
request 3:30///Chuck Phone #: ###-#### Interior walls....OK.
|
BLD-Other | 4/25/2013 | 4/26/2013 | 4/26/2013 | P | PART |
Jim Sly
|
|
|
request 3:30//grout insp//Chuck Phone #: ###-#### Cmu wall...partial...OK pending MTI insp, tests and approvals.
|
BLD-Foundation | 4/18/2013 | 4/19/2013 | 4/19/2013 | P | PASS |
Jim Sly
|
|
|
pouring at 1 - chuck Phone #: ###-####
|
BLD-Footing | 4/16/2013 | 4/17/2013 | 4/17/2013 | A | PASS |
Jim Sly
|
|
|
Around 9:00 if possible please-Chuck Phone #: ###-#### Epoxy dowels MTI.......Footing...No special insp. required per Engineer. CMU wall requires special inspection.
|
OVERRIDE | | | 4/11/2013 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 4/11/2013 | | DONE |
Barbara Stitt
|
|
|
|
Print Occupancy Form | | | 4/11/2013 | | DONE |
Barbara Stitt
|
|
|
|
Permit Ready to Issue | | | 4/11/2013 | | DONE |
Barbara Stitt
|
|
|
|
Plan assigned to (CJW) | 2/26/2013 | 2/26/2013 | 4/8/2013 | | PASS |
Carl Westfall
|
|
|
JACKSON'S STORE 119 (20 days - March 25) ePlanReview
|
Routing - PLAN CHECK | 4/2/2013 | | 4/8/2013 | | DONE |
Carl Westfall
|
|
|
Routing completed
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/8/2013 | | DONE |
|
|
|
|
Routing - PLUMBING | 4/2/2013 | | 4/5/2013 | | PASS |
Daryl Spivey
|
|
|
Drawings failed 1st review
Water filter may require additional backflow unless installed downstream of rpbp.
Per plan and 2009 ISPC.
|
Routing PW Sewer Rating | 4/2/2013 | | 4/3/2013 | | PASS |
Connie Baumgartner
|
|
|
Change in fixtures
|
Routing - PLAN CHECK | 3/29/2013 | | 4/2/2013 | | PASS |
Carl Westfall
|
|
|
Drawings approved with "red lines" after the 2nd plan review.
|
Routing - Design Review | 4/2/2013 | | 4/2/2013 | | PASS |
Andrea Tuning
|
|
|
|
Plan resubmittals received | | | 3/29/2013 | | DONE |
|
|
|
|
Plan resubmittals requested | | | 3/21/2013 | | DONE |
|
|
|
|
1st review completed | | | 3/21/2013 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 2/26/2013 | | 3/21/2013 | | FAIL |
Carl Westfall
|
|
|
The IBC plan review was started on March 19 and finished on March 21. Revised drawings were required. See the plan review report.
|
Routing PW Solid Waste | 2/26/2013 | | 3/14/2013 | | PASS |
Peter J. McCullough
|
|
|
|
Routing PW Drainage | 2/26/2013 | | 3/11/2013 | | PASS |
Brian Murphy
|
|
|
|
Routing - FIRE | 2/26/2013 | | 3/7/2013 | | PASS |
Scott Arellano
|
|
|
Attached comments to plans.
|
Routing PW Environmental | 2/27/2013 | | 2/27/2013 | | PASS |
Walt Baumgartner
|
|
|
No grease abatement required at this time
|
Routing PW Sewer Rating | 2/27/2013 | | 2/27/2013 | | PASS |
Connie Baumgartner
|
|
|
|
Routing - PUBLIC WORKS | 2/26/2013 | | 2/27/2013 | | PASS |
Connie Baumgartner
|
|
|
|
Routing - PLANNING | 2/26/2013 | | 2/27/2013 | | PASS |
Cody Riddle
|
|
|
Cody Riddle - CVA13-00002
|
Route to Impact Fee Review | 2/26/2013 | 3/1/2013 | 2/26/2013 | | PASS |
Cindy M. Gould
|
|
|
|
Routing Off Site - C.D.H | 2/26/2013 | | 2/26/2013 | | PASS |
|
|
|
|
Routing - Erosion and Sediment | 2/26/2013 | | 2/26/2013 | | PASS |
Kimberly M. Johnson
|
|
|
waiver approved
|
Plan Reviewer's activity | | | 2/26/2013 | | DONE |
Jason Blais
|
|
|
Emailed architect rep to have him contact ACHD for evaluation of any impact fees due. Written verification from ACHD is required to be provided to our Permit Counter prior to the building permit being issued.
|
Routing - Addressing | 2/26/2013 | | 2/26/2013 | | PASS |
Jason C. Taylor
|
|
|
|
Routing - PLUMBING | 2/26/2013 | | 2/26/2013 | | FAIL |
Bill VanDegrift
|
|
|
Need to add a floor sink as marked on plumbing waste and vent plan.
|
Routing - Design Review | 2/26/2013 | | 2/26/2013 | | PASS |
Andrea Tuning
|
|
|
Andrea Tuning - DRH12-00324
|
Intake Approval | | | 2/26/2013 | | PASS |
|
|
|
Plan intake review approved
|
Application received | | | 2/20/2013 | | DONE |
|
|
|
Application submitted via PDS Online on Feb 20 2013 2:10PM
|