Permanent Occupancy | | | 8/11/2015 | | DONE |
Christina Prado
|
|
|
|
PubWorks Occupancy Approval | 7/30/2015 | 7/30/2015 | 7/30/2015 | | DONE |
Tiffany Lowery
|
|
|
|
BLD-Final | 7/29/2015 | 7/29/2015 | 7/29/2015 | P | PASS |
Jim Sly
|
|
|
Craig Phone #: ###-#### OK for perm occ.
|
BLD-Final | 7/27/2015 | 7/28/2015 | 7/28/2015 | A | NR |
Jim Sly
|
|
|
Craig-please call to meet, would like later PM if possible Phone #: ###-#### Need public works
|
BLD-Final | 6/11/2015 | 6/12/2015 | 6/12/2015 | A | FAIL |
Jim Sly
|
|
|
Craig Phone #: ###-####// please call prior Need Public Works and ACHD finals.......Risers at 3 spiral stairs .....opening 4" or less.
|
Zoning Approval | 6/10/2015 | 6/10/2015 | 6/10/2015 | | PASS |
Josh Wilson
|
|
|
|
FIRE-Final Inspection | 6/8/2015 | 6/8/2015 | 6/8/2015 | P | PASS |
Troy Cobbley
|
|
|
life safety passed
|
FIRE-Final Inspection | 6/1/2015 | 6/1/2015 | 6/3/2015 | P | FAIL |
Troy Cobbley
|
|
|
Still no approved plans on site and I need to verify the smoke alarm relocation and testing
|
FIRE-Conference | 5/11/2015 | 5/11/2015 | 5/11/2015 | P | DONE |
Troy Cobbley
|
|
|
No city approved plans on site but I performed a conference anyway. I noted that the main building address is not visible from Ustick Rd, missing tagged fire extinguishes on lower and upper levels and that many of the smoke alarms are installed less than 3'-0" from bathrooms containing a tub or shower.
|
BLD-Conference | 12/17/2014 | 12/17/2014 | 12/17/2014 | P | DONE |
Jim Sly
|
|
|
Dave Phone #: ###-####
|
BLD-Energy code compliance | 8/11/2014 | 8/11/2014 | 8/11/2014 | P | PASS |
Phil Shearer
|
|
|
Travis Phone #: ###-####
|
BLD-Framing/Rough-in | 7/30/2014 | 7/30/2014 | 7/30/2014 | P | PASS |
Jim Sly
|
|
|
Travis Phone #: ###-####
|
BLD-Framing/Rough-in | 7/28/2014 | 7/29/2014 | 7/29/2014 | P | NR |
Jim Sly
|
|
|
Travis-call prior to meet Phone #: ###-####
|
BLD-Conference | 7/22/2014 | 7/23/2014 | 7/23/2014 | A | DONE |
Jim Sly
|
|
|
Travis Phone #: ###-#### Walk thru.....Firestopping.
|
Case Summary (BLD) | | | 1/24/2014 | | DONE |
|
|
|
|
BLD-Conference | 12/4/2013 | 12/5/2013 | 12/5/2013 | A | PASS |
Jim Sly
|
|
|
Travis Phone #: ###-####
|
BLD-Wall Bracing | 12/2/2013 | 12/2/2013 | 12/2/2013 | P | PART |
Jim Sly
|
|
|
Travis Phone #: ###-#### Exterior nailing and strapping only......OK. Need to complete all hold downs and anchor bolts at interior.
|
BLD-Conference | 10/2/2013 | 10/3/2013 | 10/3/2013 | A | DONE |
Jim Sly
|
|
|
travis Phone #: ###-####
|
BLD-Conference | 8/12/2013 | 8/13/2013 | 8/13/2013 | A | DONE |
Jim Sly
|
|
|
Travis phone ###-####
|
BLD-Conference | 8/12/2013 | 8/12/2013 | 8/12/2013 | P | CANC |
Jim Sly
|
|
|
travis Phone #: ###-####
|
Change Expiration Date Only | | | 6/4/2013 | | DONE |
|
|
|
|
BLD-Foundation | 5/20/2013 | 5/20/2013 | 5/20/2013 | P | PASS |
Jim Sly
|
|
|
travis Phone #: ###-####
|
BLD-Footing | 5/17/2013 | 5/17/2013 | 5/20/2013 | P | PASS |
Jim Sly
|
|
|
Travis Phone #: ###-####
|
Issue PAID IN FULL permit | | | 5/17/2013 | | DONE |
Barbara Stitt
|
|
|
|
OVERRIDE | | | 5/16/2013 | | |
|
|
|
|
Print Occupancy Form | | | 5/16/2013 | | DONE |
Barbara Stitt
|
|
|
|
Permit Ready to Issue | | | 5/16/2013 | | DONE |
Barbara Stitt
|
|
|
|
Routing - PLAN CHECK | 5/13/2013 | | 5/13/2013 | | PASS |
Sam Zahorka
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/13/2013 | | DONE |
Sam Zahorka
|
|
|
|
Routing PW Solid Waste | 3/22/2013 | | 5/13/2013 | | PASS |
Peter J. McCullough
|
|
|
Carts only
|
Plan assigned to (SRZ) | 3/22/2013 | | 5/13/2013 | | PASS |
Sam Zahorka
|
|
|
1st Review Completed.
|
Routing - Erosion and Sediment | 3/22/2013 | | 5/13/2013 | | PASS |
Kimberly M. Johnson
|
|
|
Per signed off in ePlanReview.
|
Routing PW Street Lights | 3/22/2013 | | 5/13/2013 | | PASS |
Mike D Hedge
|
|
|
|
Routing PW Sewer Design | 3/22/2013 | | 5/13/2013 | | PASS |
Kyle S. Rosenmeyer
|
|
|
Verify size of capped service line. Line believed to be 6".
|
Routing Off Site - STRUCTURAL | 5/8/2013 | | 5/9/2013 | | PASS |
Sam Zahorka
|
|
|
|
Routing - MECHANICAL | 5/9/2013 | | 5/9/2013 | | PASS |
Troy James
|
|
|
|
Routing - FIRE | 4/30/2013 | | 4/30/2013 | | PASS |
Scott Arellano
|
|
|
Attached revised Fire Code comments to plans.
|
Routing Off Site - STRUCTURAL | 4/30/2013 | | 4/30/2013 | | FAIL |
Sam Zahorka
|
|
|
|
Routing - MECHANICAL | 4/3/2013 | | 4/30/2013 | | FAIL |
Troy James
|
|
|
eplan
|
Routing - PLAN CHECK | 4/29/2013 | | 4/29/2013 | | PASS |
Sam Zahorka
|
|
|
|
1st review completed | | | 4/16/2013 | | DONE |
Sam Zahorka
|
|
|
Failed Fire, Mechanical, Structural, and Building Plan Review.
|
Routing Off Site - STRUCTURAL | 3/22/2013 | | 4/5/2013 | | FAIL |
Sam Zahorka
|
|
|
|
Routing - PLAN CHECK | 3/22/2013 | | 4/4/2013 | | FAIL |
Sam Zahorka
|
|
|
|
Routing PW Drainage | 3/22/2013 | | 4/1/2013 | | PASS |
Brian Murphy
|
|
|
|
Routing - FIRE | 3/22/2013 | 3/22/2013 | 3/29/2013 | | FAIL |
Tim Frost
|
|
|
Emailed architec resubmittals items.
|
Routing - PLUMBING | 3/22/2013 | | 3/26/2013 | | PASS |
Daryl Spivey
|
|
|
Per plan and 2009 ISPC.
|
Routing - Design Review | 3/22/2013 | | 3/26/2013 | | PASS |
Josh Wilson
|
|
|
OK per CUP12-00040 and DRH12-00187
|
Route to Impact Fee Review | 3/22/2013 | 3/27/2013 | 3/25/2013 | | PASS |
Cindy M. Gould
|
|
|
|
Routing PW Sewer Rating | 3/22/2013 | | 3/25/2013 | | PASS |
Connie Baumgartner
|
|
|
|
Routing - PLANNING Land Div | 3/22/2013 | | 3/25/2013 | | PASS |
Dave Abo
|
|
|
Lot 1, Block 2 of Sunningdale Estates Subdivision.
|
Routing - Addressing | 3/22/2013 | | 3/25/2013 | | PASS |
Jason C. Taylor
|
|
|
Apartments uploaded
|
Routing - PUBLIC WORKS | 3/22/2013 | | 3/22/2013 | | PASS |
Connie Baumgartner
|
|
|
|
Pending Assignment by JCM | 3/22/2013 | | 3/22/2013 | | DONE |
John Menard
|
|
|
|
Intake Approval | | | 2/22/2013 | | FAIL |
Tim L. Woodard
|
|
|
Failed need #310 and Fire hydrants identified. TLW
|
Application received | | | 2/20/2013 | | DONE |
|
|
|
Application submitted via PDS Online on Feb 20 2013 3:19PM
|
First Notice | | 8/21/2015 | | | |
|
|
|
|