BLD-Final | 5/9/2014 | 5/12/2014 | 5/12/2014 | A | PASS |
Mike Jordan
|
|
|
Blower door test complete. Results on sticker on side of furnace Phone #: ###-#### >> Inspection requested via web by Scott Zierler
|
DOC - Permit Finaled | 5/12/2014 | 5/12/2014 | 5/12/2014 | P | PASS |
Mike Jordan
|
|
|
|
BLD-Final | 5/7/2014 | 5/8/2014 | 5/8/2014 | A | FAIL |
Mike Jordan
|
|
|
Code is 0813. Thanks Phone #: ###-#### >> Inspection requested via web by Scott Zierler. Needs to post the required energy cert and blower door test results.
|
BLD-Final | 5/5/2014 | 5/6/2014 | 5/6/2014 | P | NR |
Jim Sly
|
|
|
Please give 15 minutes notice. Thanks! Phone #: ###-#### >> Inspection requested via web by Scott Zierler Need Fireplace final.
|
BLD-Framing/Rough-in | 11/8/2013 | 11/12/2013 | 11/12/2013 | A | PASS |
Mike Jordan
|
|
|
Phone #: ###-#### >> Inspection requested via web by Scott Zierler
|
BLD-Energy code compliance | 11/12/2013 | 11/12/2013 | 11/12/2013 | A | PASS |
Mike Jordan
|
|
|
Phone #: ###-#### >> Inspection requested via web by Scott Zierler
|
BLD-Framing/Rough-in | 11/6/2013 | 11/8/2013 | 11/8/2013 | A | PART |
Mike Jordan
|
|
|
Mike. Please give me 15 minutes notice so I can meet you on site to also review the shear and the same time. I was out of town for a funeral for a while. Thanks Scott Phone #: ###-#### >> Inspection requested via web by Scott Zierler. Provide erpair for C7 girder truss, Strap double top plates in garage. Contractor also provided engineering for largerwindow at rear of home for wall bracing issues ok. ok to insulate.
|
BLD-Wall Bracing | 10/21/2013 | 10/23/2013 | 10/23/2013 | A | PART |
Mike Jordan
|
|
|
Concrete contractor should have made corrections with holddowns in back bracing line at master bedroom. Phone #: ###-#### >> Inspection requested via web by Scott Zierler. Ok to cover exterior wall except at south wall were window size was made larger. Will have to redesign this area for wallbracing.
|
Plan resubmittals received | | | 10/23/2013 | | DONE |
|
|
|
new manual j
|
Routing - MECHANICAL | 10/23/2013 | | 10/23/2013 | | PASS |
Troy James
|
|
|
resubmitted manual j
|
BLD-Wall Bracing | 10/21/2013 | 10/22/2013 | 10/21/2013 | A | CANC |
Mike Jordan
|
|
|
Mike. I will be out of town for a funeral. Left a message with Aggregate about missing straps. My framer mentioned you would come back for shear inspection tomorrow AM, but didn''t know if you wanted to wait until the holdowns were fixed. Phone #: ###-#### >> Inspection requested via web by Scott Zierler Inspection cancelled from web by: Scott Zierler
|
BLD-Wall Bracing | 10/18/2013 | 10/21/2013 | 10/21/2013 | P | FAIL |
Mike Jordan
|
|
|
Phone #: ###-#### >> Inspection requested via web by Scott Zierler. Provide missing holddowns, install missing blocking and nail.
|
BLD-Foundation | 10/1/2013 | 10/3/2013 | 10/3/2013 | A | PASS |
Mike Jordan
|
|
|
Bolt inspection at common wall. After 9am. Phone #: ###-#### >> Inspection requested via web by Scott Zierler
|
BLD-Foundation | 8/27/2013 | 8/29/2013 | 8/29/2013 | P | PART |
Mike Jordan
|
|
|
Phone #: 2086971241 >> Inspection requested via mobile web by Heron
|
BLD-Footing | 8/27/2013 | 8/28/2013 | 8/28/2013 | P | PASS |
Mike Jordan
|
|
|
Phone #: 2086971241 >> Inspection requested via mobile web by Heron
|
BLD-Other | 8/19/2013 | 8/20/2013 | 8/20/2013 | A | PASS |
Tom Arcoraci
|
|
|
ESC Site Preparation Inspection Phone #: ###-#### >> Inspection requested via web by Scott Zierler
|
Issue PAID IN FULL permit | | | 8/6/2013 | | DONE |
Christina Prado
|
|
|
|
Expiration Notice | 7/31/2013 | 8/21/2013 | 7/31/2013 | | DONE |
Christina Prado
|
|
|
|
OVERRIDE | | | 6/24/2013 | | |
|
|
|
|
Telephone call | | | 6/24/2013 | | DONE |
Tisha Gallop
|
|
|
called Prestige Homes and left vm permit is ready and fee.
|
Routing - PLAN CHECK | 6/24/2013 | | 6/24/2013 | | PASS |
Carl D Madsen
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/24/2013 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 6/24/2013 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 6/24/2013 | | DONE |
Christina Prado
|
|
|
|
Permit Ready to Issue | | | 6/24/2013 | | DONE |
Tisha Gallop
|
|
|
|
Plan resubmittals received | | | 6/13/2013 | | DONE |
Christina Prado
|
|
|
Received three sets of plans marked A-2, two sets of plans marked A-3 & revised structural calcs; gave to Carl Madsen for review
|
Routing - PLAN CHECK | 5/6/2013 | | 5/6/2013 | | FAIL |
Carl D Madsen
|
|
|
Failed wall bracing 5-6-13 CDM
|
Plan resubmittals received | | | 4/24/2013 | | DONE |
Christina Prado
|
|
|
received two sets of revised plans sheets marked A-1, A-1, A-2, A-3, A-4, A-5, A-6, A-6a, E-1, E-2, S-1, f-1 & F-2: Routed to Carl Madsen for further review
|
1st review completed | | | 3/13/2013 | | FAIL |
|
|
|
|
Routing - PLAN CHECK | 2/25/2013 | | 3/13/2013 | | FAIL |
Carl D Madsen
|
|
|
|
Plan assigned to (AJS) | 3/4/2013 | 3/4/2013 | 3/5/2013 | | DEFR |
Carl D Madsen
|
|
|
Assigned to Carl
|
Plan assigned to (CDM) | 2/21/2013 | 2/21/2013 | 3/4/2013 | | DEFR |
Carl D Madsen
|
|
|
Deferred to Adele
|
Route to Impact Fee Review | 2/21/2013 | 2/26/2013 | 2/26/2013 | | PASS |
Cindy M. Gould
|
|
|
|
Routing - MECHANICAL | 2/25/2013 | | 2/25/2013 | | PASS |
Troy James
|
|
|
|
Routing - PLANNING | 2/22/2013 | | 2/25/2013 | | PASS |
Joshua Johnson
|
|
|
|
Application received | | 2/21/2013 | 2/22/2013 | | DONE |
Tisha Gallop
|
|
|
|
Routing - Addressing | 2/22/2013 | | 2/22/2013 | | PASS |
Jason C. Taylor
|
|
|
|
Routing - PUBLIC WORKS | 2/22/2013 | | 2/22/2013 | | PASS |
Connie Baumgartner
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 2/21/2013 | | DONE |
Tisha Gallop
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 2/21/2013 | | DONE |
Tisha Gallop
|
|
|
|
Intake Approval | | | 2/21/2013 | | PASS |
Tisha Gallop
|
|
|
|