(RITE AID) To remodel a 2,938 square foot portion of an existing 26,025 square foot retail sales store per approved plans. Work to include: construction of new interior non-bearing partition walls to create a new clinic room, clinic waiting room, clinic storage room, and a new pharmacy and consultation room adjacent to the existing pharmacy location; installation of new compressor units, coolers, freezers and low profile in store racking fixtures; install upgrades for accessibility to existing restrooms; suspended ceiling grid system work installed per CISCA guidelines; replace existing interior lighting with new lighting per plans; related interior finishes in compliance with chapter 8 of the 2009 IBC; install new cashier counter and printer station; and all other work per the approved plans, attached plan review report, and all applicable codes. A new Certificate of Occupancy with the new occupant load total is required to be obtained after all work has been inspected and approved. The existing envelope is not being affected by this permit. "This building is fully Fire Sprinklered for area increases with an approved Fire Alarm system. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department." **SRZ**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Print Statement  9/18/2015 DONE
Print Statement  9/4/2015 DONE
Print Statement  11/24/2014 DONE
DetailsChristina Prado
Third Notice 8/31/20149/17/2014 DONE
Print Statement  9/17/2014 DONE
DetailsTisha Gallop
mailed to ESI
Second Notice 7/25/20148/26/2014 DONE
First Notice 6/14/20147/15/2014 DONE
Faxed 7-15-14
BLD-Final6/3/20146/4/20146/4/2014APASS
DetailsTony Young
Devon Phone #: ###-####
Permanent Occupancy  6/4/2014 DONE
DetailsBarbara Stitt
Print Occupancy Form  6/4/2014 DONE
DetailsBarbara Stitt
BLD-Final12/3/201312/4/201312/4/2013PNR
DetailsJim Sly
devon Phone #: ###-####
Need to Obtain a Plumbing permit and final.
Talked to Darla.......
FIRE-Final Inspection12/3/201312/4/201312/4/2013APASS
DetailsForrest France
Verified previous correction items are finished. EM lighting tested okay. *NOTE- discovered a storage closet below the stairs to the mezzanine office lacking fire sprinkler coverage. This existing deficiency to be corrected under a separate FIR permit as agreed.
BLD-Final12/2/201312/3/201312/3/2013ANR
DetailsTony Young
Devon Phone #: ###-####,, needs f/l/s
FIRE-Final Inspection11/13/201311/13/201311/13/2013PFAIL
DetailsCraig D. Hanson
Exit sign needs added to SW corner. Emergency lights need testing.
BLD-Ceiling Grid Inspection10/17/201310/17/201310/17/2013PPASS
DetailsTony Young
We are looking for the ceiling grid inspection for the area on the east side of the sales floor including the pharmacy Phone #: ###-#### >> Inspection requested via web by Matt Perry
BLD-Ceiling Grid Inspection10/10/201310/11/201310/11/2013APART
DetailsTony Young
craig Phone #: ###-####,, west side and main area ok pending trades
BLD-Framing/Rough-in9/13/20139/13/20139/13/2013PPART
DetailsTony Young
CRAIG Phone #: ###-####,, pharmacy walls ok
BLD-Framing/Rough-in9/4/20139/4/20139/4/2013PPART
DetailsTony Young
early as poss// craig Phone #: ###-####,, soffit above check out ok,, no trades involved
BLD-Framing/Rough-in9/3/20139/4/20139/4/2013APASS
DetailsTony Young
Bobby Phone #: ###-####
Override - Parcel Holds  8/1/2013  
Issue PAID IN FULL permit  8/1/2013 DONE
DetailsChristina Prado
Print Occupancy Form  8/1/2013 DONE
DetailsChristina Prado
(F) Reprint permit  8/1/2013 DONE
Override - Parcel Holds  7/31/2013  
Permit Ready to Issue  7/31/2013 DONE
Plan assigned to (SRZ)7/15/20137/15/20137/15/2013 DONE
DetailsSam Zahorka
PLANS/APPL TAKEN TO FRONT DESK  7/15/2013 DONE
DetailsSam Zahorka
Plan mod prior to issuance.
Pending Assignment by SRZ7/12/2013 7/15/2013 DONE
DetailsSam Zahorka
Routing - PLAN CHECK7/12/2013 7/15/2013 PASS
DetailsSam Zahorka
Plan Mod prior to issuance.
Plan assigned to (SRZ)3/5/20133/5/20133/28/2013 PASS
DetailsSam Zahorka
2nd Review Completed. 1st Review completed. ePlanReview case
Routing - PLAN CHECK3/28/2013 3/28/2013 PASS
DetailsSam Zahorka
PLANS/APPL TAKEN TO FRONT DESK  3/28/2013 DONE
DetailsSam Zahorka
Routing - PLAN CHECK3/26/2013 3/26/2013 FAIL
DetailsSam Zahorka
Sheets M0.0 through M4.1 do not provide the required City of Boise Approval Stamp area in the lower right hand corners. Please provide this stamp area an re-upload drawings horizontally.





Telephone call  3/26/2013 DONE
DetailsSam Zahorka
Left message with the architect. Sheets M0.0 through M4.1 do not provide the required City of Boise Approval Stamp area in the lower right hand corners. Please provide this stamp area an re-upload drawings horizontally.
Routing - FIRE3/26/2013 3/26/2013 PASS
DetailsScott Arellano
Attached comments to plans.
Telephone call  3/21/2013 DONE
DetailsSam Zahorka
Left message with the architect Howard Kamura to return my telephone call. Fire and Building Plan Review need corrections. An email has been sent on 3/15/13 for the applicant to resubmit.
1st review completed  3/15/2013  
DetailsSam Zahorka
Failed Fire and Plan Review
Routing - PLAN CHECK3/5/2013 3/15/2013 FAIL
DetailsSam Zahorka
Routing - FIRE3/5/2013 3/12/2013 FAIL
DetailsScott Arellano
emailed resubmittal items to archtiect.
Plan Reviewer's activity  3/11/2013 DONE
DetailsSam Zahorka
No mechanical, plumbing, or electrical plan review required. Plans are deferred to the field. Separate M.E.P. permits required.
Per Bill V. the Mech. / Plumbing supervisor.
Payment Received  3/5/2013 DONE
Payment received via Govolutions
Intake Approval  3/5/2013 PASS
DetailsSam Zahorka
Pending Assignment by JCB3/5/2013 3/5/2013 DONE
DetailsJason Blais
Routing - Addressing3/5/2013 3/5/2013 PASS
DetailsJason C. Taylor
Routing - PUBLIC WORKS3/5/2013 3/5/2013 PASS
DetailsBeverly Mountain
Routing PW Sewer Rating3/5/2013 3/5/2013 PASS
DetailsConnie Baumgartner
Intake Approval  2/26/2013 FAIL
DetailsSam Zahorka
Incomplete submittals. Please call Sam Zahorka at ###-####.
Application received  2/24/2013 DONE