BLD-Final | 4/29/2013 | 5/2/2013 | 5/2/2013 | A | PASS |
Tony Young
|
|
|
Ext 222 Tina Reay-Please call prior to inspection Phone #: ###-####
|
Permanent Occupancy | | | 5/2/2013 | | DONE |
|
|
|
|
FIRE-Final Inspection | 4/29/2013 | 5/1/2013 | 5/1/2013 | A | PASS |
Forrest France
|
|
|
Noted correction items verified for completion. Life safety inspection passed.
|
FIRE-Final Inspection | 3/4/2013 | 3/8/2013 | 3/8/2013 | A | FAIL |
Forrest France
|
|
|
Correction items noted include; post building address, remove manual thumbturn at the main entry/exit, provide approved hardware at the kitchen area exit, remove storage in the basement- mechanical equipment only allowed.
|
BLD-Final | 3/7/2013 | 3/8/2013 | 3/8/2013 | A | FAIL |
Mike Jordan
|
|
|
call Tim Woodard to ride along,,,Tina Phone #: ###-#### x222 or ###-####Repair front door hardware, door hardware at ramp amd remove allstorage from basement.
|
BLD-Final | 3/4/2013 | 3/8/2013 | 3/8/2013 | A | CANC |
Tony Young
|
|
|
Tina Phone #: ###-#### x222 or ###-####
|
Issue PAID IN FULL permit | | | 3/4/2013 | | DONE |
Christina Prado
|
|
|
|
Plan assigned to (TLW) | 2/25/2013 | | 2/28/2013 | | PASS |
Tim L. Woodard
|
|
|
|
Routing - PLAN CHECK | 2/25/2013 | | 2/28/2013 | | PASS |
Tim L. Woodard
|
|
|
|
1st review completed | | | 2/28/2013 | | DONE |
Tim L. Woodard
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/28/2013 | | DONE |
Tim L. Woodard
|
|
|
|
Case Summary (BLD) | | | 2/28/2013 | | DONE |
Tim L. Woodard
|
|
|
|
Print Occupancy Form | | | 2/28/2013 | | DONE |
Christina Prado
|
|
|
|
Permit Ready to Issue | | | 2/28/2013 | | DONE |
Christina Prado
|
|
|
|
Telephone call | | | 2/28/2013 | | DONE |
Christina Prado
|
|
|
Called Tine to advise permit is ready for pick up
|
Plans ACCEPTED BY PLAN TECH | | | 2/25/2013 | | DONE |
Christina Prado
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 2/25/2013 | | DONE |
Christina Prado
|
|
|
|
First Notice | | 5/12/2013 | | | |
|
|
|
|
Application received | | 2/25/2013 | | | |
|
|
|
|