BLD-Final | 7/16/2013 | 7/18/2013 | 7/18/2013 | A | PASS |
Tom Arcoraci
|
|
|
Eric Phone #: ###-####
|
DOC - Permit Finaled | 7/18/2013 | 7/18/2013 | 7/18/2013 | P | PASS |
Tom Arcoraci
|
|
|
|
BLD-Framing/Rough-in | 5/9/2013 | 5/10/2013 | 5/10/2013 | A | PASS |
Jim Sly
|
|
|
eric Phone #: ###-####
|
BLD-Foundation | 4/9/2013 | 4/10/2013 | 4/10/2013 | A | PASS |
Jim Sly
|
|
|
around 11 - scott Phone #: ###-####
|
BLD-Footing | 4/8/2013 | 4/9/2013 | 4/9/2013 | P | PASS |
Jim Sly
|
|
|
scott Phone #: ###-####
|
OVERRIDE | | | 3/6/2013 | | |
|
|
|
|
Routing Walk-In (BLD) | 3/6/2013 | 3/6/2013 | 3/6/2013 | P | DONE |
Perry Paine
|
|
|
|
Case Summary (BLD) | | | 3/6/2013 | | |
|
|
|
|
Inspection Record Card- Bld | | | 3/6/2013 | | |
|
|
|
|
1st review completed | | | 3/6/2013 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/6/2013 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 3/6/2013 | | DONE |
Barbara Stitt
|
|
|
|
Issue PAID IN FULL permit | | | 3/6/2013 | | DONE |
Barbara Stitt
|
|
|
|
Routing Walk-In (Zoning) | 2/26/2013 | 2/26/2013 | 2/26/2013 | P | PASS |
David Moser
|
|
|
Setbacks as per the plat notes. The 400 sq. ft shop shall not have a full size garage door and is not for car parking.
|
Routing Walk-In (BLD) | 2/26/2013 | 2/26/2013 | 2/26/2013 | P | FAIL |
Perry Paine
|
|
|
engineering required
|
Application received | | 2/26/2013 | | | |
|
|
|
|