Second Notice | | 5/15/2014 | 5/23/2014 | | DONE |
Christina Prado
|
|
|
complete 5-23-14
|
Print Statement | | | 5/23/2014 | | DONE |
Christina Prado
|
|
|
|
First Notice | | 4/6/2014 | 5/5/2014 | | DONE |
|
|
|
|
Permanent Occupancy | | | 3/27/2014 | | DONE |
Christina Prado
|
|
|
|
BLD-Final | 3/20/2014 | 3/21/2014 | 3/21/2014 | P | PASS |
Tony Young
|
|
|
Phone #: ###-#### >> Inspection requested via web by Scott Stimpson
|
Zoning Approval | 3/21/2014 | 3/21/2014 | 3/21/2014 | | DONE |
Andrea Tuning
|
|
|
|
Print Occupancy Form | | | 3/21/2014 | | DONE |
Tisha Gallop
|
|
|
|
BLD-Final | 3/19/2014 | 3/21/2014 | 3/20/2014 | A | CANC |
Tony Young
|
|
|
Phone #: ###-#### >> Inspection requested via web by Scott Stimpson Inspection cancelled from web by: Scott Stimpson
|
FIRE-Final Inspection | 3/18/2014 | 3/20/2014 | 3/20/2014 | A | PASS |
Forrest France
|
|
|
Fire life safety inspection completed satisfactory.
|
BLD-Final | 3/18/2014 | 3/20/2014 | 3/19/2014 | P | CANC |
Tony Young
|
|
|
Phone #: ###-#### >> Inspection requested via web by Scott Stimpson Inspection cancelled from web by: Scott Stimpson
|
BLD-Other | 3/4/2014 | 3/5/2014 | 3/5/2014 | A | PASS |
Tony Young
|
|
|
Fire caulking inspection at 2 hr wall tenant side. Phone #: ###-#### >> Inspection requested via web by Scott Stimpson,, east side ok above ceiling
|
BLD-Ceiling Grid Inspection | 2/28/2014 | 2/28/2014 | 2/28/2014 | P | PEND |
Tony Young
|
|
|
Phone #: ###-#### >> Inspection requested via web by Scott Stimpson,, ok pending trades
|
BLD-Other | 2/18/2014 | 2/19/2014 | 2/19/2014 | A | PART |
Tony Young
|
|
|
2 hr wall Sheetrock in progress. Phone #: ###-#### >> Inspection requested via web by Scott Stimpson...work in progress,, ok so far
|
BLD-Other | 2/17/2014 | 2/18/2014 | 2/18/2014 | A | PART |
Tony Young
|
|
|
This is for 2hr wall fire caulking. Phone #: ###-#### >> Inspection requested via web by Scott Stimpson,, west side firewall caulking ok
|
BLD-Energy code compliance | 2/3/2014 | 2/4/2014 | 2/4/2014 | A | PASS |
Jim Storey
|
|
|
Interior sound batt insulation. Phone #: ###-#### >> Inspection requested via web by Scott Stimpson insulation ok
|
Telephone call | | | 2/4/2014 | | DONE |
Sam Zahorka
|
|
|
I spoke with the architect about the fire barrier penetrations. Requested he provide the contractor with directions on how to wrap the penetrations with the assembly, provide blocking, and fire caulking to the roof decking. He said he would email me this information also so I could attach to the permit for the inspectors information during inspection.
|
Plan Reviewer's activity | | | 2/4/2014 | | DONE |
Sam Zahorka
|
|
|
Recieved detail from the architect for penetrations and continuity of the 2-hour fire barrier. Attached this to this case under documents. Called Tony Young the Structural Inspector and let him know.
|
BLD-Other | 2/3/2014 | 2/3/2014 | 2/3/2014 | P | PART |
Jim Storey
|
|
|
This is a 2 hr wall Sheetrocking in progress inspection. Phone #: ###-#### >> Inspection requested via web by Scott Stimpson gyp ok to progress/ need arch to address fire barrior thrur penatrations of roof framing members/ frame to exterior wall at 2 hr on south end.
|
BLD-Framing/Rough-in | 1/31/2014 | 1/31/2014 | 1/31/2014 | P | PART |
Jim Sly
|
|
|
Phone #: ###-#### >> Inspection requested via web by Scott Stimpson Partial framing insp. All walls OK up to 9' level. Structural Engineer to provide a final letter of approval for all Framing. OK to insulate Ext. walls. Fireblock all interior walls at ceiling line......insulation...OK.
|
BLD-Energy code compliance | 1/24/2014 | 1/27/2014 | 1/27/2014 | P | PART |
Tony Young
|
|
|
This is for exterior wall rigid insulation prior to Sheetrock. Phone #: ###-#### >> Inspection requested via web by Scott Stimpson,, ok to cover block walls where no trades are behind coolers
|
BLD-Framing/Rough-in | 1/24/2014 | 1/24/2014 | 1/24/2014 | A | PART |
Tom Arcoraci
|
|
|
Partial wall cover at exterior wall furr out over CMU. Phone #: ###-#### >> Inspection requested via web by Scott Stimpson ok to cover ext cmu walls
|
BLD-Other | 1/12/2014 | 1/13/2014 | 1/13/2014 | A | PASS |
Tony Young
|
|
|
This is for masonry wall infill rebar inspection. Phone #: ###-#### >> Inspection requested via web by Scott Stimpson,, per plan
|
BLD-Conference | 1/8/2014 | 1/9/2014 | 1/9/2014 | A | PART |
Tony Young
|
|
|
Chris IVes-Please call prior to inspection Phone #: ###-####,, walk through with Radix owner,, seeing job status
|
OVERRIDE | | | 11/25/2013 | | |
|
|
|
|
Plan assigned to (SRZ) | 11/13/2013 | 11/13/2013 | 11/25/2013 | | PASS |
Sam Zahorka
|
|
|
Plan mod. pending Design Review to PASS. (Carls Junior)
|
Routing - PLAN CHECK | 11/14/2013 | | 11/25/2013 | | PASS |
Sam Zahorka
|
|
|
Re-routed to Planning and Zoning
|
Routing - PLANNING | 11/25/2013 | | 11/25/2013 | | PASS |
Andrea Tuning
|
|
|
|
Print Occupancy Form | | | 11/25/2013 | | DONE |
Tisha Gallop
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/25/2013 | | DONE |
Tisha Gallop
|
|
|
|
Permit Ready to Issue | | | 11/25/2013 | | DONE |
Barbara Stitt
|
|
|
|
Telephone call | | | 11/25/2013 | | DONE |
Barbara Stitt
|
|
|
Called Jason Smith and told him plan mod is ready for pick & fees due on 11-25-13 @ 11:45am//BAS
|
CHANGE STATUS TO (ISS) | | | 11/25/2013 | | DONE |
Barbara Stitt
|
|
|
|
(F) Reprint permit | | | 11/25/2013 | | DONE |
Barbara Stitt
|
|
|
|
Routing - PLAN CHECK | 11/13/2013 | | 11/14/2013 | | PASS |
Sam Zahorka
|
|
|
|
Routing - Design Review | 11/14/2013 | | 11/14/2013 | | FAIL |
Andrea Tuning
|
|
|
The applicant has submitted a DR application for the changes. The DR application is not yet reviewed.
|
Case Summary (BLD) | | | 11/14/2013 | | DONE |
Sam Zahorka
|
|
|
|
Plan Modification Accepted | | | 11/13/2013 | | DONE |
Tisha Gallop
|
|
|
Plan Modification accepted for Bld13-00395 (Carl's Jr.) because during construction it was discovered that the finished floor elevation of the existing building is higher than was anticipated. As a result the proposed connection from the new entrances on the south side of the building to the existing sidewalk on State Street exceed code maximums for an accessible route. A new accessible ramp with handrails has been added at the southeast corner of the building alon with stairs on the south side to connect to the existing sidewalks on State and 17th. Submitted on plan sheets A-1 & A-2; Ref DRH13-00374; routed to Sam Zahorka.
|
Issue PAID IN FULL permit | | | 8/22/2013 | | DONE |
Barbara Stitt
|
|
|
|
Expiration Notice | 8/8/2013 | 8/29/2013 | 8/8/2013 | | DONE |
Christina Prado
|
|
|
|
Plan assigned to (SRZ) | 5/29/2013 | 5/29/2013 | 6/3/2013 | | PASS |
Sam Zahorka
|
|
|
Minor changes resubmitted by architect prior to issuance. Routed to Mechanical, Planning, and Plumbing.
|
Routing - PLAN CHECK | 5/31/2013 | | 6/3/2013 | | PASS |
Sam Zahorka
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/3/2013 | | DONE |
Sam Zahorka
|
|
|
|
CHANGE STATUS TO (RDY) | | | 6/3/2013 | | |
|
|
|
|
Routing - MECHANICAL | 5/29/2013 | | 5/31/2013 | | PASS |
Troy James
|
|
|
|
Routing - PLUMBING | 5/31/2013 | | 5/31/2013 | | PASS |
Bill VanDegrift
|
|
|
resubmittals- misc. pipe routing changes ok
|
CHANGE STATUS TO (REV) | | | 5/29/2013 | | |
|
|
|
5-29-13 per Sam Z put back in the review status as Andrew Erstad need to make some changes on the plans.
|
Routing - Design Review | 5/29/2013 | | 5/29/2013 | | PASS |
Andrea Tuning
|
|
|
Minor changes resubmitted prior to issuance. See architects transmittal letter for explanation.
|
OVERRIDE | | | 3/26/2013 | | |
|
|
|
|
Plan assigned to (SRZ) | 3/4/2013 | 3/4/2013 | 3/26/2013 | | PASS |
Sam Zahorka
|
|
|
Carl's Jr.
1st review completed.
|
Routing - PLAN CHECK | 3/15/2013 | | 3/26/2013 | | PASS |
Sam Zahorka
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/26/2013 | | DONE |
Sam Zahorka
|
|
|
|
Case Summary (BLD) | | | 3/26/2013 | | DONE |
Sam Zahorka
|
|
|
|
Print Occupancy Form | | | 3/26/2013 | | DONE |
Christina Prado
|
|
|
|
Telephone call | | | 3/26/2013 | | DONE |
Tisha Gallop
|
|
|
called Jason and told him permit is ready, fee, need ACHD, RP, RCE/GC
|
Permit Ready to Issue | | | 3/26/2013 | | DONE |
Tisha Gallop
|
|
|
|
Plan resubmittals received | | | 3/22/2013 | | DONE |
Tisha Gallop
|
|
|
received response letter from architect and two copies of plan sheet A3.1; taken to Sam Zahorka.
|
1st review completed | | | 3/15/2013 | | FAIL |
|
|
|
Failed - Plan Check
|
Routing - FIRE | 3/13/2013 | | 3/15/2013 | | PASS |
Scott Arellano
|
|
|
|
Routing - PLAN CHECK | 3/8/2013 | | 3/13/2013 | | FAIL |
Sam Zahorka
|
|
|
|
Routing - Design Review | 3/8/2013 | | 3/8/2013 | | PASS |
Andrea Tuning
|
|
|
Andrea Tuning - DRH12-00345
|
Routing - PLUMBING | 3/7/2013 | | 3/8/2013 | | PASS |
Bill VanDegrift
|
|
|
1. BFP-2 shows a Wilkens mod. #740 dual check. This is not a testable device and is not approved. all backflow devices must be a testable device in Idaho.
2. Public lavs shall have tempered water or a tempering device. Maximum temp. 120 degrees.
3. May require additional backflow protection.
|
Routing - Erosion and Sediment | 3/6/2013 | | 3/7/2013 | | PASS |
Kimberly M. Johnson
|
|
|
plan approved with minor redlines
|
Routing - PUBLIC WORKS | 3/5/2013 | | 3/6/2013 | | PASS |
Connie Baumgartner
|
|
|
|
Routing - Addressing | 3/4/2013 | | 3/5/2013 | | PASS |
Jason C. Taylor
|
|
|
|
Routing PW Environmental | 3/5/2013 | | 3/5/2013 | | PASS |
Walt Baumgartner
|
|
|
Submitted plans approved as drawn with grease waste line connecting to existing grease interceptor.
|
Routing PW Sewer Rating | 3/5/2013 | | 3/5/2013 | | PASS |
Connie Baumgartner
|
|
|
|
Application received | | 3/1/2013 | 3/4/2013 | | DONE |
|
|
|
|
Pending Assignment by JCB | 3/1/2013 | | 3/4/2013 | | DONE |
Jason Blais
|
|
|
|
Intake Approval | | | 3/1/2013 | | PASS |
|
|
|
Plan intake review approved.
|
Plans ACCEPTED BY PLAN TECH | | | 3/1/2013 | | DONE |
Christina Prado
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 3/1/2013 | | DONE |
Christina Prado
|
|
|
|