Information based on query as of Tuesday, July 16, 2024.
Permit Information
Permit NumberBLD13-00414
StatusFinaled
Name ST LUKES REG MED CNTR
Site Address 190 E BANNOCK ST
Project NameST LUKES - 10TH FLOOR
Customer Number 
ePlanReviewNo
Description
(ST LUKES - NEURO SURGERY CLINIC - 10TH STORY) Fire sprinkler system used for high-rise and for occupancy. To remodel the 7,909 square foot 10th story of the St. Luke’s hospital. The occupied area of the 10th story includes medical exam and treatment rooms, a waiting room, a terrace, a conference room, and offices. At the same level as the occupied area of the 10th story is a roof area open to the sky with roof top HVAC equipment installed. The existing 2 separate smoke compartments will be maintained with a 1-hr smoke barrier wall between them. The existing I-2 Occupancy type corridor will also be maintained. Work is to include a toilet room accessible to the disabled, a bariatric toilet room accessible to those who are overweight, interior nonbearing walls, 1-hr fire-resistance-rated smoke barrier walls, I-2 Occupancy corridor walls and doors, smoke partitions, suspended acoustical ceilings, a dual height drinking fountain, millwork, and finishes. The work is required to comply with the approved drawings, with the plan review report, and with all applicable codes and ordinances. The fire sprinkler system is required to comply with NFPA 13 and the fire alarm system is required to comply with NFPA 72 as regulated by the Fire Department. Quick-response fire sprinkler heads are required throughout the occupied area of the 10th Story. **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice 9/7/20149/5/2014 DONE
This permit finaled on the web by Curtis Weedop
Third Notice 7/14/20149/2/2014 DONE
e-mailed Curtis and Virna
Third Notice 6/15/20147/9/2014 DONE
e-mailed to Curtis
Second Notice 5/15/20146/10/2014 DONE
DetailsBarbara Stitt
Faxed 6-10-14
First Notice 4/14/20145/5/2014 DONE
e-mailed to Curtis Weedop
Permanent Occupancy  4/4/2014 DONE
DetailsBarbara Stitt
BLD-Final3/20/20143/26/20143/26/2014APASS
DetailsDave Hannah
if no answer call ###-#### Phone #: ###-#### >> Inspection requested via web by Rock Self
FIRE-Final Inspection3/20/20143/24/20143/24/2014APASS
DetailsForrest France
Fire life safety completed satisfactory.
BLD-Wall cover1/30/20141/31/20141/31/2014APASS
DetailsDave Hannah
if no answer try ###-#### please Phone #: ###-#### >> Inspection requested via web by Rock Self
BLD-Ceiling Grid Inspection12/11/201312/11/201312/11/2013APEND
DetailsDave Hannah
if no answer try my desk phone ###-#### Phone #: ###-#### >> Inspection requested via web by Rock Self
BLD-Wall cover10/31/201311/1/201311/1/2013PPASS
DetailsDave Hannah
if no answer try my desk phone at ###-#### Thanks Phone #: ###-#### >> Inspection requested via web by Rock Self
Issue PAID IN FULL permit  4/19/2013 DONE
DetailsChristina Prado
Print Occupancy Form  4/4/2013 DONE
DetailsBarbara Stitt
Permit Ready to Issue  4/4/2013 DONE
DetailsBarbara Stitt
Telephone call  4/4/2013 DONE
DetailsBarbara Stitt
E-mail sent to Curtis that permit is ready with fees due on 4-4-13 @ 10:15am//BAS
Plan assigned to (CJW)3/4/20133/4/20134/3/2013 PASS
DetailsCarl Westfall
ST LUKE'S NEURO SURGERY CLINIC - 10TH STORY (20 days - March 29)
Plan resubmittals received  4/3/2013 DONE
DetailsTisha Gallop
received response and two copies of plan sheets G001, G003, G005, A111, A112, A113, A121, A201, I101, M100, M111; taken to Carl Westfall.
PLANS/APPL TAKEN TO FRONT DESK  4/3/2013 DONE
Routing - PLAN CHECK4/2/2013 4/3/2013 PASS
DetailsCarl Westfall
Drawings approved after the resubmittal review.
1st review completed  4/2/2013 FAIL
Failed - Plan Check
Routing - FIRE3/27/2013 4/2/2013 PASS
DetailsScott Arellano
Routing - PLAN CHECK3/6/2013 3/27/2013 FAIL
DetailsCarl Westfall
The IBC plan review was started on March 22 and was finished on March 27. Revised drawings were required. See the plan review report.
Routing - PLUMBING3/5/2013 3/6/2013 PASS
DetailsBill VanDegrift
Need to resize waste line serving rooms 10e106 ,10e107 and 10e108. Need to size it 2 inch up to last sink. Only 1 sink on an 1 1/2 inch drain line in horizontal.
Routing PW Sewer Rating3/5/2013 3/5/2013 PASS
DetailsConnie Baumgartner
Routing - PUBLIC WORKS3/5/2013 3/5/2013 PASS
DetailsConnie Baumgartner
Routing - Addressing3/4/2013 3/5/2013 PASS
DetailsJason C. Taylor
Plans ACCEPTED BY PLAN TECH  3/4/2013 DONE
DetailsChristina Prado
Intake Approval  3/4/2013 PASS
DetailsTim L. Woodard
Recd Pcfee & Taken To Pln CK  3/4/2013 DONE
DetailsChristina Prado
Pending Assignment by JCB3/4/2013 3/4/2013 DONE
DetailsJason Blais
Attached Document  3/4/2013  
Attached Document  3/4/2013  
Application received 3/4/2013