Information based on query as of Wednesday, July 24, 2024.
Permit Information
Permit NumberBLD13-00415
StatusIssued
Name LIGHTHOUSE HOMES AND REMODELING
Site Address 213 N 10TH ST
Project NameStillwater - Masonic Temple
Customer Number 
ePlanReviewNo
Description
(STILLWATER FLOAT CENTER - Masonic Temple) Permit is to remodel an existing 1,400 square foot tanning salon / office space previously remodeled for “Jamaica Me Tan” under BLD03-03070 then remodeled into “Alpha” under BLD11-00947. Approval contingent upon adhering to the approved plans on file. Work to include: demolition of interior non-bearing walls, construction of new interior non-bearing walls to create three float rooms and a storage room, installation of new accessible doors with lever hardware, and finishes in compliance with chapter 8 and chapter 12 of the 2006 IBC. NOTE: Several conditions about the surrounding materials in the float rooms were made in the Plan Review Report. This building is not fully fire sprinklered. **TLW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final8/2/20138/2/20138/5/2013PPASS
DetailsDave Hannah
randy Phone #: ###-####
BLD-Final7/31/20138/1/20138/2/2013APEND
DetailsDave Hannah
Randy-PLease call for access information Phone #: ###-####
BLD-Final8/2/20138/2/20138/2/2013APART
DetailsDave Hannah
Randy-PLease call for access information Phone #: ###-#### ok for temp occ but needs to fix ada issuess
FIRE-Final Inspection7/31/20138/1/20138/1/2013PPASS
DetailsTroy Cobbley
Life safety passed
FIRE-Final Inspection7/31/20137/31/20137/31/2013PFAIL
DetailsForrest France
Fire extinguisher is overdue annual certification, provide approved door hardware at the new storage room.
BLD-Final7/29/20137/29/20137/30/2013PNR
DetailsDave Hannah
randy - call for access Phone #: ###-#### needs fire final and fix door hardware
BLD-Framing/Rough-in3/26/20133/27/20133/28/2013PPASS
DetailsDave Hannah
chris Phone #: ###-####
Issue PAID IN FULL permit  3/15/2013 DONE
DetailsBarbara Stitt
Print Occupancy Form  3/12/2013 DONE
DetailsChristina Prado
Permit Ready to Issue  3/12/2013  
Telephone call  3/12/2013  
3-12-13 called Randy permit ready and fee given ///dld
Plan assigned to (TLW)3/4/2013 3/11/2013 PASS
DetailsTim L. Woodard
Routing - PLAN CHECK3/5/2013 3/11/2013 PASS
DetailsTim L. Woodard
Approved with plan review report and redlines on the drawings. TLW
1st review completed  3/11/2013 DONE
DetailsTim L. Woodard
PLANS/APPL TAKEN TO FRONT DESK  3/11/2013 DONE
DetailsTim L. Woodard
Case Summary (BLD)  3/11/2013 DONE
Routing - Addressing3/4/2013 3/5/2013 PASS
DetailsJason C. Taylor
Routing - PUBLIC WORKS3/5/2013 3/5/2013 PASS
DetailsConnie Baumgartner
Recd Pcfee & Taken To Pln CK  3/4/2013  
Plans ACCEPTED BY PLAN TECH  3/4/2013  
ok per Tim W to take in as a level 1
Application received 3/4/2013