BLD-Final | 8/2/2013 | 8/2/2013 | 8/5/2013 | P | PASS |
Dave Hannah
|
|
|
randy Phone #: ###-####
|
BLD-Final | 7/31/2013 | 8/1/2013 | 8/2/2013 | A | PEND |
Dave Hannah
|
|
|
Randy-PLease call for access information Phone #: ###-####
|
BLD-Final | 8/2/2013 | 8/2/2013 | 8/2/2013 | A | PART |
Dave Hannah
|
|
|
Randy-PLease call for access information Phone #: ###-#### ok for temp occ but needs to fix ada issuess
|
FIRE-Final Inspection | 7/31/2013 | 8/1/2013 | 8/1/2013 | P | PASS |
Troy Cobbley
|
|
|
Life safety passed
|
FIRE-Final Inspection | 7/31/2013 | 7/31/2013 | 7/31/2013 | P | FAIL |
Forrest France
|
|
|
Fire extinguisher is overdue annual certification, provide approved door hardware at the new storage room.
|
BLD-Final | 7/29/2013 | 7/29/2013 | 7/30/2013 | P | NR |
Dave Hannah
|
|
|
randy - call for access Phone #: ###-#### needs fire final and fix door hardware
|
BLD-Framing/Rough-in | 3/26/2013 | 3/27/2013 | 3/28/2013 | P | PASS |
Dave Hannah
|
|
|
chris Phone #: ###-####
|
Issue PAID IN FULL permit | | | 3/15/2013 | | DONE |
Barbara Stitt
|
|
|
|
Print Occupancy Form | | | 3/12/2013 | | DONE |
Christina Prado
|
|
|
|
Permit Ready to Issue | | | 3/12/2013 | | |
|
|
|
|
Telephone call | | | 3/12/2013 | | |
|
|
|
3-12-13 called Randy permit ready and fee given ///dld
|
Plan assigned to (TLW) | 3/4/2013 | | 3/11/2013 | | PASS |
Tim L. Woodard
|
|
|
|
Routing - PLAN CHECK | 3/5/2013 | | 3/11/2013 | | PASS |
Tim L. Woodard
|
|
|
Approved with plan review report and redlines on the drawings. TLW
|
1st review completed | | | 3/11/2013 | | DONE |
Tim L. Woodard
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/11/2013 | | DONE |
Tim L. Woodard
|
|
|
|
Case Summary (BLD) | | | 3/11/2013 | | DONE |
|
|
|
|
Routing - Addressing | 3/4/2013 | | 3/5/2013 | | PASS |
Jason C. Taylor
|
|
|
|
Routing - PUBLIC WORKS | 3/5/2013 | | 3/5/2013 | | PASS |
Connie Baumgartner
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 3/4/2013 | | |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 3/4/2013 | | |
|
|
|
ok per Tim W to take in as a level 1
|
Application received | | 3/4/2013 | | | |
|
|
|
|