Third Notice | | 4/6/2014 | 4/16/2014 | | DONE |
|
|
|
|
Print Statement | | | 4/16/2014 | | DONE |
Tisha Gallop
|
|
|
mailed to Talboy Construction
|
Third Notice | | 3/5/2014 | 4/1/2014 | | DONE |
|
|
|
mailed
|
Second Notice | | 2/6/2014 | 2/28/2014 | | DONE |
Christina Prado
|
|
|
mailed 2-28-14
|
First Notice | | 11/23/2013 | 1/27/2014 | | DONE |
|
|
|
|
BLD-Final | 11/12/2013 | 11/13/2013 | 11/13/2013 | A | PASS |
Jim Storey
|
|
|
Dante Phone #: ###-####
|
Permanent Occupancy UNPAID FEE | | | 11/13/2013 | | DONE |
Barbara Stitt
|
|
|
|
BLD-Final | 11/7/2013 | 11/8/2013 | 11/8/2013 | P | PART |
Jim Storey
|
|
|
dante Phone #: ###-#### signage above entry door temp final ok.
|
FIRE-Final Inspection | 11/7/2013 | 11/8/2013 | 11/8/2013 | P | PASS |
Troy Cobbley
|
|
|
Life safety passed
|
BLD-Final | 11/5/2013 | 11/5/2013 | 11/5/2013 | P | NR |
Jim Storey
|
|
|
Dante Phone #: ###-####
|
BLD-Final | 11/4/2013 | 11/5/2013 | 11/5/2013 | A | DEFR |
Jim Storey
|
|
|
Dante Phone #: ###-####
|
FIRE-Final Inspection | 11/4/2013 | 11/4/2013 | 11/4/2013 | P | PART |
Troy Cobbley
|
|
|
A temporary occupancy is given with Scott Arellano's permission for a max of 10 days. Items needing correct are the fire doors do not have activation per NFPA 80 (links on both sides), access controled egress doors do not have sensors or connection to the fire alarm system per IFC 1008.1.4.4, exit discharge lights need to be installed, add exit sign/emergency light in corridor, install tile in office, contact fire dept for gate at west side of building that is only 14'-6" wide.
|
BLD-Final | 10/31/2013 | 11/1/2013 | 11/1/2013 | P | NR |
Jim Storey
|
|
|
Dante-Late afternoon please Phone #: ###-####
|
FIRE-Final Inspection | 10/31/2013 | 11/1/2013 | 11/1/2013 | P | FAIL |
Craig D. Hanson
|
|
|
FA system not ready. Doors not installed. No mag holders.
|
Routing - PLAN CHECK | 10/24/2013 | | 10/25/2013 | | PASS |
John Menard
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/25/2013 | | DONE |
John Menard
|
|
|
|
Print Occupancy Form | | | 10/25/2013 | | DONE |
|
|
|
|
Telephone call | | | 10/25/2013 | | DONE |
Christina Prado
|
|
|
calle Richard to advise permit is ready and gave fees due
|
Permit Ready to Issue | | | 10/25/2013 | | DONE |
Christina Prado
|
|
|
|
CHANGE STATUS TO (ISS) | | | 10/25/2013 | | DONE |
|
|
|
|
(F) Reprint permit | | | 10/25/2013 | | DONE |
|
|
|
|
Plan assigned to (JCM) | 9/10/2013 | | 10/25/2013 | | PASS |
John Menard
|
|
|
Plan Mod Review completed 10/1 JCM
|
Routing - FIRE | 10/23/2013 | | 10/24/2013 | | PASS |
Craig D. Hanson
|
|
|
Attached IFC comments to plans.
|
Plan Reviewer's activity | | | 10/23/2013 | | PASS |
John Menard
|
|
|
Reviewed and approved plan modification revisions. JCM
|
Routing - PLAN CHECK | 10/3/2013 | | 10/23/2013 | | PASS |
John Menard
|
|
|
|
Plan resubmittals received | | | 10/22/2013 | | DONE |
John Menard
|
|
|
Received transmittal letter with two sets of sheets A1-1, A2-1 A4-1 and EN1-1
|
BLD-Other | 10/9/2013 | 10/10/2013 | 10/10/2013 | A | PART |
Jim Storey
|
|
|
2hr wall //Dante Phone #: ###-#### core board ok
|
BLD-Energy code compliance | 10/8/2013 | 10/8/2013 | 10/8/2013 | P | PASS |
Jim Storey
|
|
|
Dante Phone #: 2###-####
|
Routing - FIRE | 10/1/2013 | | 10/3/2013 | | FAIL |
Craig D. Hanson
|
|
|
Exit and lighting plan not included
|
Routing - PLAN CHECK | 9/17/2013 | | 10/1/2013 | | FAIL |
John Menard
|
|
|
|
Plan resubmittals requested | | | 10/1/2013 | | DONE |
John Menard
|
|
|
|
Routing - PUBLIC WORKS | 9/16/2013 | | 9/17/2013 | | PASS |
Connie Baumgartner
|
|
|
|
Telephone call | | | 9/16/2013 | | DONE |
Christina Prado
|
|
|
called Action Couriers for pick up
|
Routing - Addressing | 9/16/2013 | | 9/16/2013 | | PASS |
Jason C. Taylor
|
|
|
|
Routing PW Sewer Rating | 9/16/2013 | | 9/16/2013 | | PASS |
Connie Baumgartner
|
|
|
|
Routing - PLAN CHECK | 9/10/2013 | | 9/16/2013 | | |
John Menard
|
|
|
|
Plan Modification Accepted | | | 9/10/2013 | | |
|
|
|
9-10-13 Plan Mod excepted for BLD13-00440 ,to modify the entry lobby, add a vestibule area at entry. This will result in minor changes to the exterior. make provisions for future office space in a portion of the mezzanine, and add a stairway from mezzanine to new exterior exit. pages A-0.0,A-0.1,A-2.1,A-2.2,A3.1,A4.1,A4.2,A-4.3 A-4.4,A-7.1,A-7.2, GN-1,F-1,F-2,F-3,F-4,S-1,S-2 Sent to John M for review ///dld
|
BLD-Foundation | 7/5/2013 | 7/8/2013 | 7/8/2013 | A | PASS |
Jim Storey
|
|
|
Dante Phone #: ###-#### ft in slab ok
|
BLD-Conference | 6/18/2013 | 6/19/2013 | 6/19/2013 | A | PASS |
Jim Storey
|
|
|
stem wall//Dante Phone #: ###-####
|
BLD-Footing | 6/14/2013 | 6/17/2013 | 6/17/2013 | A | PASS |
Jim Storey
|
|
|
pouring around noon - dante Phone #: ###-####
|
BLD-Foundation | 6/10/2013 | 6/11/2013 | 6/11/2013 | P | PASS |
Jim Storey
|
|
|
Dante Phone #: ###-#### walls and piers rebar ok si pending report.
|
BLD-Footing | 6/3/2013 | 6/4/2013 | 6/4/2013 | A | PASS |
Jim Storey
|
|
|
Dante Phone #: ###-#### ft rebar ok / si pending.
|
Print Occupancy Form | | | 6/4/2013 | | DONE |
|
|
|
|
Print Occupancy Form | | | 5/22/2013 | | DONE |
Tisha Gallop
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/22/2013 | | |
Tisha Gallop
|
|
|
|
Permit Ready to Issue | | | 5/22/2013 | | |
|
|
|
|
Telephone call | | | 5/22/2013 | | |
|
|
|
5-22-13 Called Richard permit ready and fee given. ///DLD
|
Issue PAID IN FULL permit | | | 5/22/2013 | | DONE |
Tisha Gallop
|
|
|
|
Routing - PLAN CHECK | 5/16/2013 | | 5/21/2013 | | |
John Menard
|
|
|
|
Plan assigned to (JCM) | 3/7/2013 | | 5/21/2013 | | DONE |
John Menard
|
|
|
1st Review completed 3/25/2013
|
Routing - FIRE | 5/20/2013 | | 5/21/2013 | | PASS |
Scott Arellano
|
|
|
|
Routing - PLAN CHECK | 5/21/2013 | | 5/21/2013 | | PASS |
John Menard
|
|
|
|
Telephone call | | | 5/20/2013 | | DONE |
Scott Arellano
|
|
|
E-mailed resubmittal items to general contractor; per their request.
|
Plan Reviewer's activity | | | 5/20/2013 | | DONE |
Scott Arellano
|
|
|
Received email from Tom Micklich regarding the installation of a remote Post Indicating Valve (PIV) to control the Fire Sprinkler supply. Refer to plan sheet A1.1 for details.
|
Routing - FIRE | 5/20/2013 | | 5/20/2013 | | PASS |
Scott Arellano
|
|
|
Attached updated comments to plans. Addition of remote PIV note is required to be placed on revised architectual plan sheet A1.1.
|
Routing - PLAN CHECK | 5/20/2013 | | 5/20/2013 | | |
John Menard
|
|
|
|
Plan resubmittals received | | | 5/20/2013 | | DONE |
Tisha Gallop
|
|
|
received two copies of plan sheet A1.1; inserted by arch. rep. and taken back to John Menard.
|
Routing - FIRE | 5/13/2013 | | 5/16/2013 | | FAIL |
Scott Arellano
|
|
|
E-mailed resubmittal items to architect.
|
Routing - PLAN CHECK | 4/16/2013 | | 5/13/2013 | | PASS |
John Menard
|
|
|
|
Plan resubmittals received | | | 4/22/2013 | | DONE |
Tisha Gallop
|
|
|
received two copies of response from arch., reduced setback request, walls/partitions details, plan sheets S-2, M2.0 and as-builts; sheets inserted by rep. and taken back to John Menard.
|
Plan Reviewer's activity | | | 4/16/2013 | | DONE |
Scott Arellano
|
|
|
Per Boise City Fire Marshal, IFC plan review revised to address the existing aircraft fuel dispensing station in close proximity to the proposed building addition.
|
Routing - PLANNING Land Div | 4/12/2013 | | 4/15/2013 | | PASS |
Todd Tucker
|
|
|
|
Plan resubmittals requested | | | 4/12/2013 | | DONE |
John Menard
|
|
|
|
Routing - PLAN CHECK | 3/25/2013 | | 4/12/2013 | | FAIL |
John Menard
|
|
|
|
Routing Off Site - STRUCTURAL | 4/10/2013 | | 4/11/2013 | | PASS |
John Menard
|
|
|
Received e-mail from consulting structural engineer approving resubmitted structural calculations. JCM
|
Plan resubmittals received | | | 4/10/2013 | | DONE |
Christina Prado
|
|
|
Received response letter, R & M Steel calcs, SunSky calcs, new roof construction calcs and two sets of plans marked A1.1, A7.1, A7.2, EN1.1 & E1.1; plans inserted by arch rep and taken back to John for review
|
Routing - FIRE | 3/21/2013 | 3/21/2013 | 3/25/2013 | | FAIL |
Scott Arellano
|
|
|
Emailed resubmittal items to architect.
|
1st review completed | | | 3/25/2013 | | FAIL |
|
|
|
Failed structural, fire, and plan check.
|
Route to Impact Fee Review | 3/21/2013 | 3/26/2013 | 3/22/2013 | | PASS |
Cindy M. Gould
|
|
|
|
Routing - PLAN CHECK | 3/12/2013 | | 3/21/2013 | | FAIL |
John Menard
|
|
|
|
Routing Off Site - STRUCTURAL | 3/7/2013 | | 3/14/2013 | | FAIL |
John Menard
|
|
|
Called Action Couriers for pick up on 3-7-13 @ 2:15pm///BAS - Received comment list from consulting structural engineer requesting revisions. JCM
|
Routing - PLANNING | 3/12/2013 | | 3/12/2013 | | PASS |
Sarah Schafer
|
|
|
No DR required. Meets setbacks.
|
Routing - PLUMBING | 3/11/2013 | | 3/12/2013 | | PASS |
Daryl Spivey
|
|
|
Per plans and 2009 ISPC.
|
Routing PW Environmental | 3/11/2013 | | 3/11/2013 | | PASS |
Walt Baumgartner
|
|
|
Turbo Air - Hangar addition floor drainage to new blind sump box
|
Routing PW Sewer Rating | 3/8/2013 | | 3/11/2013 | | PASS |
Connie Baumgartner
|
|
|
|
Routing - PUBLIC WORKS | 3/8/2013 | | 3/11/2013 | | PASS |
Connie Baumgartner
|
|
|
|
Routing - Erosion and Sediment | 3/11/2013 | | 3/11/2013 | | PASS |
Kimberly M. Johnson
|
|
|
Approved with redlines: 1) Attached inspection checklist submitted by PD on 3/11; 2) Attached construction entrance detail from the manual; 3) Temporary stabilization requirements redlined; 4) maintenance trigger for concrete washout redlined. Ref ESC13-00184.
|
Plan routing begun/NEW & ADDTN | | | 3/8/2013 | | |
|
|
|
|
Routing - Addressing | 3/8/2013 | | 3/8/2013 | | PASS |
Jason C. Taylor
|
|
|
|
Routing - PLANNING Land Div | 3/8/2013 | | 3/8/2013 | | FAIL |
Todd Tucker
|
|
|
|
Pending Assignment by JCM | 3/7/2013 | | 3/7/2013 | | DONE |
John Menard
|
|
|
|
Application received | | 3/7/2013 | | | |
|
|
|
|