BLD-Final | 9/13/2013 | 9/13/2013 | 9/13/2013 | P | PASS |
Mike Jordan
|
|
|
Denton Phone #: ###-####
|
DOC - Permit Finaled | 9/13/2013 | 9/13/2013 | 9/13/2013 | P | PASS |
Mike Jordan
|
|
|
|
BLD-Final | 9/12/2013 | 9/13/2013 | 9/13/2013 | A | NR |
Jim Sly
|
|
|
Paul Phone #: ###-#### Need Mech Final.
|
BLD-Energy code compliance | 7/22/2013 | 7/23/2013 | 7/23/2013 | A | PASS |
Mike Jordan
|
|
|
paul Phone #: ###-####
|
BLD-Framing/Rough-in | 7/18/2013 | 7/18/2013 | 7/18/2013 | P | PASS |
Jim Storey
|
|
|
paul Phone #: ###-####
|
BLD-Wall Bracing | 5/21/2013 | 5/22/2013 | 5/22/2013 | A | PASS |
Mike Jordan
|
|
|
paul Phone #: ###-####
|
BLD-Conference | 5/8/2013 | 5/8/2013 | 5/8/2013 | P | DONE |
Mike Jordan
|
|
|
paul Phone #: ###-####
|
BLD-Other | 3/28/2013 | 3/29/2013 | 3/29/2013 | A | PART |
Mike Jordan
|
|
|
stem wall//paul Phone #: ###-####
|
BLD-Footing | 3/28/2013 | 3/28/2013 | 3/28/2013 | P | PASS |
Mike Jordan
|
|
|
Paul Phone #: ###-####
|
OVERRIDE | | | 3/19/2013 | | |
|
|
|
|
Plan assigned to (AJS) | 3/7/2013 | 3/7/2013 | 3/19/2013 | | DONE |
Adele J Schaffeld-Griffin
|
|
|
|
Issue PAID IN FULL permit | | | 3/19/2013 | | DONE |
Barbara Stitt
|
|
|
|
Routing - PLAN CHECK | 3/19/2013 | | 3/19/2013 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/19/2013 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 3/19/2013 | | DONE |
Christina Prado
|
|
|
|
Permit Ready to Issue | | | 3/19/2013 | | DONE |
Christina Prado
|
|
|
|
Routing - PLAN CHECK | 3/18/2013 | | 3/18/2013 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
The electronic sheets were not uploaded correctly. Spoke with Alex and sent them back to applicant to upload correctly
|
Routing - MECHANICAL | 3/7/2013 | | 3/13/2013 | | PASS |
Troy James
|
|
|
|
Routing - PLANNING | 3/7/2013 | | 3/11/2013 | | PASS |
Joshua Johnson
|
|
|
|
Routing - Addressing | 3/7/2013 | | 3/8/2013 | | PASS |
Jason C. Taylor
|
|
|
|
Routing - PUBLIC WORKS | 3/7/2013 | | 3/8/2013 | | PASS |
Connie Baumgartner
|
|
|
|
Application received | | | 3/7/2013 | | DONE |
|
|
|
Application submitted via PDS Online on Mar 7 2013 10:07AM
|
Route to Impact Fee Review | 3/7/2013 | 3/12/2013 | 3/7/2013 | | PASS |
Cindy M. Gould
|
|
|
|
Plan assigned to (CDM) | 3/7/2013 | 3/7/2013 | 3/7/2013 | | DEFR |
Carl D Madsen
|
|
|
expedite - eplanreview
Assigned to Adele
|
Routing - PLAN CHECK | 3/7/2013 | | 3/7/2013 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 3/7/2013 | | DONE |
|
|
|
|
Intake Approval | | | 3/7/2013 | | PASS |
|
|
|
|
1st review completed | | | 3/7/2013 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
Wall bracing shall be identified on the plans as required by the IRC. If there is a shear design from a design professional please provide the stamped design. For Braced Wall Design please specify if you are choosing to use intermittent or continuous sheathed method. This would be indicated as cs-wsp for continuous wood structural panel or BWP and ABW for intermittent braced wall panels that are 4feet ABW for walls less than 4 feet or PFG for any portal frame. Please provide a detail for ABW and PFG for intermittent design or the corner detail from chapter 6 for continuous method.See submittal check list for additional information on our website.
|