BLD-Final | 4/18/2013 | 4/19/2013 | 4/19/2013 | A | PASS |
Dave Hannah
|
|
|
Kelly Phone #: ###-####
|
DOC - Permit Finaled | 4/19/2013 | 4/19/2013 | 4/19/2013 | P | PASS |
Dave Hannah
|
|
|
|
BLD-Footing | 3/15/2013 | 3/18/2013 | 3/19/2013 | A | PASS |
Dave Hannah
|
|
|
Kelly Phone #: ###-####
|
PubWorks Subgrade Approval | 3/18/2013 | 3/18/2013 | 3/18/2013 | | DONE |
Jason C. Taylor
|
|
|
Recieved subgrade approval from geotechnical engineer. Footing inspection can be scheduled with building department. Jason Taylor ###-####.
|
Routing Walk-In (Zoning) | 3/15/2013 | 3/15/2013 | 3/15/2013 | A | PASS |
Dave Abo
|
|
|
Addition to be 30 feet from rear property line as per requirement of the A-1 zone.
|
Routing Walk-In (BLD) | 3/15/2013 | 3/15/2013 | 3/15/2013 | A | DONE |
Perry Paine
|
|
|
|
Plan assigned to (PEP) | 3/15/2013 | 3/15/2013 | 3/15/2013 | | DONE |
Perry Paine
|
|
|
|
Permit Ready to Issue | | | 3/15/2013 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 3/15/2013 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 3/15/2013 | | |
|
|
|
|
Inspection Record Card- Bld | | | 3/15/2013 | | |
|
|
|
|
1st review completed | | | 3/15/2013 | | |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/15/2013 | | DONE |
|
|
|
|
Routing Walk-In (Zoning) | 3/12/2013 | 3/12/2013 | 3/12/2013 | P | DONE |
Colleen T Carroll
|
|
|
needs to verify setbacks
|
Routing Walk-In (PW Hillside) | 3/12/2013 | 3/12/2013 | 3/12/2013 | P | PASS |
Jason C. Taylor
|
|
|
Patio footings need subgrade inspection prior to placement of concrete. Jason Taylor ###-####
|
Application received | | 3/12/2013 | | | |
|
|
|
|