Print Occupancy Form | | | 5/8/2013 | | DONE |
Barbara Stitt
|
|
|
|
Permanent Occupancy | | | 5/8/2013 | | DONE |
Barbara Stitt
|
|
|
|
BLD-Final | 4/30/2013 | 5/3/2013 | 5/3/2013 | P | PASS |
Tom Arcoraci
|
|
|
greg Phone #: ###-#### ok for occ no card
|
FIRE-Final Inspection | 4/30/2013 | 5/1/2013 | 5/1/2013 | A | PASS |
Troy Cobbley
|
|
|
Life safety passed. Directional arrow on west exit sign needs punched out so people are not led to the locked door prior to the building inspection
|
Plan Reviewer's activity | | | 3/22/2013 | | DONE |
Adele J Schaffeld-Griffin
|
|
|
Met with applicant 3-22-13 after fire inspection was completed. There were 2 doors added in hallways at some time with out a permit. These doors do not meet ADA and the applicant will revome them and the framing to put it back to original hallway widths. There are 2 small interior non bearing partition walls shown on the plans creating office space that are no longer installed. I noted on the plans that the removal of the walls was okay as they did not effect any life safety requirments. AJS
|
BLD-Final | 3/15/2013 | 3/20/2013 | 3/20/2013 | A | NR |
Tom Arcoraci
|
|
|
call 1/2 before to meet//Greg Gaddis Phone #: ###-####
|
FIRE-Final Inspection | 3/18/2013 | 3/19/2013 | 3/19/2013 | A | FAIL |
Troy Cobbley
|
|
|
Resubmit plans showing the actual floor layout, repair exit signs and emergency lights, provide emergency lighting in all common paths of egress (if not existing) as discussed, provide fire extinguishers as discussed.
|
FIRE-Final Inspection | 3/15/2013 | 3/18/2013 | 3/18/2013 | P | FAIL |
Troy Cobbley
|
|
|
call 1/2 before to meet//Greg Gaddis Phone #: ###-#### (called and left message just after 1pm, arrived at job at 1:25. Waited until 1:32 and then left. No contact with owner and building is locked.)
|
Issue PAID IN FULL permit | | | 3/15/2013 | | DONE |
Tisha Gallop
|
|
|
|
Plan assigned to (AJS) | 3/14/2013 | 3/14/2013 | 3/14/2013 | | DONE |
Adele J Schaffeld-Griffin
|
|
|
|
1st review completed | | | 3/14/2013 | | DONE |
Adele J Schaffeld-Griffin
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/14/2013 | | DONE |
Adele J Schaffeld-Griffin
|
|
|
|
Case Summary (BLD) | | | 3/14/2013 | | DONE |
Adele J Schaffeld-Griffin
|
|
|
|
Print Occupancy Form | | | 3/14/2013 | | DONE |
|
|
|
|
Telephone call | | | 3/14/2013 | | DONE |
|
|
|
spoke with greg permit ready fees due
|
Permit Ready to Issue | | | 3/14/2013 | | DONE |
|
|
|
|
Plan assigned to (TLW) | 3/13/2013 | | 3/14/2013 | | DEFR |
Tim L. Woodard
|
|
|
assigned to Adele
|
Routing - PLAN CHECK | 3/13/2013 | | 3/14/2013 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
Adele
|
Application received | | 3/13/2013 | 3/13/2013 | | DONE |
Barbara Stitt
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 3/13/2013 | | DONE |
Barbara Stitt
|
|
|
|
First Notice | | 5/18/2013 | | | |
|
|
|
|