Information based on query as of Tuesday, July 16, 2024.
Permit Information
Permit NumberBLD13-00550
StatusFinaled
Name PARADIGM CONSTRUCTION COMPANY LLC
Site Address 531 S PINE ISLAND LN
Project Name 
Customer Number 
ePlanReviewNo
Description
Permit for the construction of a new 1471 sq. ft., two story (first story 638 sq. ft., second story 833 sq. ft.) single family dwelling with 3 bedrooms, 2 1/2 bathrooms, approximately 55 sq. ft. of covered patio/porch and a 425 sq. ft. attached garage per the approved plans, attached engineering, plan review report and any notations. R-2D zoning and setbacks per planning. AJS
Contact Information
See Activities list for contact information
Color Key
Current location of plans being reviewed:  
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final1/30/20141/31/20141/31/2014APASS
DetailsMike Jordan
Call brian 30 minutes before inspection Phone #: ###-#### >> Inspection requested via web by Brian Stark
DOC - Permit Finaled1/31/20141/31/20141/31/2014PPASS
DetailsMike Jordan
BLD-Blower Door Test Results1/31/20141/31/20141/31/2014PDONE
DetailsMike Jordan
4.0
BLD-Final1/28/20141/29/20141/29/2014ANR
DetailsMike Jordan
Call Brian 30 minutes prior to inspection Phone #: ###-#### >> Inspection requested via web by Brian Stark
BLD-Wall cover11/5/201311/5/201311/5/2013PCANC
DetailsMike Jordan
Firewall assembly Phone #: ###-#### >> Inspection requested via web by Brian Stark. No assembly on this unit.
BLD-Wall cover11/1/201311/4/201311/4/2013ANR
DetailsMike Jordan
Interior firewall fastening Phone #: ###-#### >> Inspection requested via web by Brian Stark
BLD-Energy code compliance10/25/201310/28/201310/28/2013APASS
DetailsMike Jordan
Phone #: ###-#### >> Inspection requested via web by Brian Stark
BLD-Framing/Rough-in10/28/201310/28/201310/28/2013APASS
DetailsMike Jordan
Phone #: ###-#### >> Inspection requested via web by Brian Stark
BLD-Framing/Rough-in10/21/201310/22/201310/22/2013PPART
DetailsMike Jordan
Phone #: ###-#### >> Inspection requested via web by Brian Stark. Provide truss engineering. Ok to insulate after mech. rough in inspection.
Plan resubmittals received  10/18/2013 DONE
new manual j
Routing - MECHANICAL10/18/2013 10/18/2013 PASS
DetailsTroy James
resubmitted manual j
BLD-Wall Bracing8/20/20138/20/20138/20/2013APASS
DetailsJim Storey
Phone #: ###-#### >> Inspection requested via web by James Larkin
BLD-Wall Bracing8/9/20138/9/20138/9/2013PPASS
DetailsMike Jordan
Phone #: ###-#### >> Inspection requested via web by James Larkin
BLD-Wall Bracing7/26/20137/26/20137/26/2013PPASS
DetailsMike Jordan
Phone #: ###-#### >> Inspection requested via web by James Larkin
BLD-Footing7/8/20137/8/20137/8/2013PPASS
DetailsMike Jordan
BLD-Footing7/3/20137/8/20137/8/2013ANR
DetailsMike Jordan
Greg Phone #: ###-####
BLD-Foundation6/24/20136/24/20136/24/2013PPASS
DetailsJim Sly
BLD-Footing6/24/20136/24/20136/24/2013PPASS
DetailsJim Sly
BLD-Energy code compliance6/24/20136/24/20136/24/2013PPASS
DetailsMike Jordan
greg Phone #: ###-####. Rigid foam insulation, under slab on grade, interior side of stemwall.
Issue PAID IN FULL permit  6/13/2013 DONE
DetailsBarbara Stitt
OVERRIDE  4/29/2013  
Plan assigned to (AJS)3/14/20133/14/20134/29/2013 PASS
DetailsAdele J Schaffeld-Griffin
1ST REVIEW COMPLETED
Routing - PLAN CHECK4/29/2013 4/29/2013 PASS
DetailsAdele J Schaffeld-Griffin
Case Summary (BLD)  4/29/2013 DONE
DetailsAdele J Schaffeld-Griffin
PLANS/APPL TAKEN TO FRONT DESK  4/29/2013 DONE
Case Summary (BLD)  4/29/2013 DONE
DetailsAdele J Schaffeld-Griffin
PLANS/APPL TAKEN TO FRONT DESK  4/29/2013 DONE
Inspection Record Card- Bld  4/29/2013 DONE
DetailsTisha Gallop
Telephone call  4/29/2013 DONE
DetailsChristina Prado
called Jim to advise permit is ready and gave fees due
Permit Ready to Issue  4/29/2013 DONE
DetailsChristina Prado
Routing - PLANNING3/22/2013 4/29/2013 PASS
DetailsSue Cummings
Plan resubmittals received  4/1/2013  
Received 2 copies of sheets A2.1, A4.1, A5.1 and 2 copies structural calcs then taken back to Sue Cummings office
Routing - MECHANICAL3/22/2013 3/22/2013 PASS
DetailsTroy James
1st review completed  3/22/2013 FAIL
DetailsAdele J Schaffeld-Griffin
need planning approval
Routing - PLAN CHECK3/22/2013 3/22/2013 FAIL
DetailsAdele J Schaffeld-Griffin
Email sent to Jim 3-22-13
1. Beam number 8 in the structural calculations and the beam called out in the plans do not correspond. There was not hand calculations for beam 8 in the calculations on the wood works design. Please revise.

2. The lateral design for braced wall line A from the structural calculations does not correspond with the design on the plans. Please revise
Routing - MECHANICAL  3/21/2013 FAIL
DetailsTroy James
emailed correction to dustin mori, need 2.5 ton equipment
Route to Impact Fee Review3/14/20133/19/20133/15/2013 PASS
DetailsCindy M. Gould
Routing - Addressing3/14/2013 3/15/2013 PASS
DetailsJason C. Taylor
Routing - PUBLIC WORKS3/15/2013 3/15/2013 PASS
DetailsConnie Baumgartner
Application received 3/14/20133/14/2013 DONE
DetailsBarbara Stitt
Plans ACCEPTED BY PLAN TECH  3/14/2013  
DetailsBarbara Stitt
Intake Approval  3/14/2013  
DetailsBarbara Stitt
Recd Pcfee & Taken To Pln CK  3/14/2013 DONE
DetailsBarbara Stitt
Routing - PLANNING3/15/2013   FAIL
Needs CU modification SAC