BLD-Final | 1/30/2014 | 1/31/2014 | 1/31/2014 | A | PASS |
Mike Jordan
|
|
|
Call brian 30 minutes before inspection Phone #: ###-#### >> Inspection requested via web by Brian Stark
|
DOC - Permit Finaled | 1/31/2014 | 1/31/2014 | 1/31/2014 | P | PASS |
Mike Jordan
|
|
|
|
BLD-Blower Door Test Results | 1/31/2014 | 1/31/2014 | 1/31/2014 | P | DONE |
Mike Jordan
|
|
|
4.0
|
BLD-Final | 1/28/2014 | 1/29/2014 | 1/29/2014 | A | NR |
Mike Jordan
|
|
|
Call Brian 30 minutes prior to inspection Phone #: ###-#### >> Inspection requested via web by Brian Stark
|
BLD-Wall cover | 11/5/2013 | 11/5/2013 | 11/5/2013 | P | CANC |
Mike Jordan
|
|
|
Firewall assembly Phone #: ###-#### >> Inspection requested via web by Brian Stark. No assembly on this unit.
|
BLD-Wall cover | 11/1/2013 | 11/4/2013 | 11/4/2013 | A | NR |
Mike Jordan
|
|
|
Interior firewall fastening Phone #: ###-#### >> Inspection requested via web by Brian Stark
|
BLD-Energy code compliance | 10/25/2013 | 10/28/2013 | 10/28/2013 | A | PASS |
Mike Jordan
|
|
|
Phone #: ###-#### >> Inspection requested via web by Brian Stark
|
BLD-Framing/Rough-in | 10/28/2013 | 10/28/2013 | 10/28/2013 | A | PASS |
Mike Jordan
|
|
|
Phone #: ###-#### >> Inspection requested via web by Brian Stark
|
BLD-Framing/Rough-in | 10/21/2013 | 10/22/2013 | 10/22/2013 | P | PART |
Mike Jordan
|
|
|
Phone #: ###-#### >> Inspection requested via web by Brian Stark. Provide truss engineering. Ok to insulate after mech. rough in inspection.
|
Plan resubmittals received | | | 10/18/2013 | | DONE |
|
|
|
new manual j
|
Routing - MECHANICAL | 10/18/2013 | | 10/18/2013 | | PASS |
Troy James
|
|
|
resubmitted manual j
|
BLD-Wall Bracing | 8/20/2013 | 8/20/2013 | 8/20/2013 | A | PASS |
Jim Storey
|
|
|
Phone #: ###-#### >> Inspection requested via web by James Larkin
|
BLD-Wall Bracing | 8/9/2013 | 8/9/2013 | 8/9/2013 | P | PASS |
Mike Jordan
|
|
|
Phone #: ###-#### >> Inspection requested via web by James Larkin
|
BLD-Wall Bracing | 7/26/2013 | 7/26/2013 | 7/26/2013 | P | PASS |
Mike Jordan
|
|
|
Phone #: ###-#### >> Inspection requested via web by James Larkin
|
BLD-Footing | 7/8/2013 | 7/8/2013 | 7/8/2013 | P | PASS |
Mike Jordan
|
|
|
|
BLD-Footing | 7/3/2013 | 7/8/2013 | 7/8/2013 | A | NR |
Mike Jordan
|
|
|
Greg Phone #: ###-####
|
BLD-Foundation | 6/24/2013 | 6/24/2013 | 6/24/2013 | P | PASS |
Jim Sly
|
|
|
|
BLD-Footing | 6/24/2013 | 6/24/2013 | 6/24/2013 | P | PASS |
Jim Sly
|
|
|
|
BLD-Energy code compliance | 6/24/2013 | 6/24/2013 | 6/24/2013 | P | PASS |
Mike Jordan
|
|
|
greg Phone #: ###-####. Rigid foam insulation, under slab on grade, interior side of stemwall.
|
Issue PAID IN FULL permit | | | 6/13/2013 | | DONE |
Barbara Stitt
|
|
|
|
OVERRIDE | | | 4/29/2013 | | |
|
|
|
|
Plan assigned to (AJS) | 3/14/2013 | 3/14/2013 | 4/29/2013 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
1ST REVIEW COMPLETED
|
Routing - PLAN CHECK | 4/29/2013 | | 4/29/2013 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
|
Case Summary (BLD) | | | 4/29/2013 | | DONE |
Adele J Schaffeld-Griffin
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/29/2013 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 4/29/2013 | | DONE |
Adele J Schaffeld-Griffin
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/29/2013 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 4/29/2013 | | DONE |
Tisha Gallop
|
|
|
|
Telephone call | | | 4/29/2013 | | DONE |
Christina Prado
|
|
|
called Jim to advise permit is ready and gave fees due
|
Permit Ready to Issue | | | 4/29/2013 | | DONE |
Christina Prado
|
|
|
|
Routing - PLANNING | 3/22/2013 | | 4/29/2013 | | PASS |
Sue Cummings
|
|
|
|
Plan resubmittals received | | | 4/1/2013 | | |
|
|
|
Received 2 copies of sheets A2.1, A4.1, A5.1 and 2 copies structural calcs then taken back to Sue Cummings office
|
Routing - MECHANICAL | 3/22/2013 | | 3/22/2013 | | PASS |
Troy James
|
|
|
|
1st review completed | | | 3/22/2013 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
need planning approval
|
Routing - PLAN CHECK | 3/22/2013 | | 3/22/2013 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
Email sent to Jim 3-22-13
1. Beam number 8 in the structural calculations and the beam called out in the plans do not correspond. There was not hand calculations for beam 8 in the calculations on the wood works design. Please revise.
2. The lateral design for braced wall line A from the structural calculations does not correspond with the design on the plans. Please revise
|
Routing - MECHANICAL | | | 3/21/2013 | | FAIL |
Troy James
|
|
|
emailed correction to dustin mori, need 2.5 ton equipment
|
Route to Impact Fee Review | 3/14/2013 | 3/19/2013 | 3/15/2013 | | PASS |
Cindy M. Gould
|
|
|
|
Routing - Addressing | 3/14/2013 | | 3/15/2013 | | PASS |
Jason C. Taylor
|
|
|
|
Routing - PUBLIC WORKS | 3/15/2013 | | 3/15/2013 | | PASS |
Connie Baumgartner
|
|
|
|
Application received | | 3/14/2013 | 3/14/2013 | | DONE |
Barbara Stitt
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 3/14/2013 | | |
Barbara Stitt
|
|
|
|
Intake Approval | | | 3/14/2013 | | |
Barbara Stitt
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 3/14/2013 | | DONE |
Barbara Stitt
|
|
|
|
Routing - PLANNING | 3/15/2013 | | | | FAIL |
|
|
|
Needs CU modification SAC
|