Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD13-00551
StatusFinaled
Name PARADIGM CONSTRUCTION COMPANY LLC
Site Address 579 S PINE ISLAND LN
Project Name 
Customer Number 
ePlanReviewNo
Description
Permit for the construction of a new 1471 sq. ft., two story (first story 638 sq. ft., second story 833 sq. ft.) single family dwelling with 3 bedrooms, 2.5 bathrooms, approximately 50 sq. ft. of covered patio/porch and a 425 sq. ft. attached garage per the approved plans, attached engineering, plan review report and any notations. R-2D zoning and setbacks per planning. CDM
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Print Occupancy Form  1/16/2014  
Letter of compliance/Occupancy  1/16/2014  
BLD-Final1/3/20141/6/20141/6/2014APASS
DetailsMike Jordan
Call Brah Phone #: ###-#### >> Inspection requested via web by James Larkin
DOC - Permit Finaled1/6/20141/6/20141/6/2014PPASS
DetailsMike Jordan
BLD-Blower Door Test Results1/6/20141/6/20141/6/2014ADONE
DetailsMike Jordan
3
BLD-Wall cover10/21/201310/21/201310/21/2013PPASS
DetailsMike Jordan
Call brian prior to inspection. For interior sheetrock fastener schedule. Phone #: ###-#### >> Inspection requested via web by Brian . 1hr. wall, interior side ok.
BLD-Energy code compliance10/10/201310/11/201310/11/2013APASS
DetailsMike Jordan
Contact Brian Phone #: ###-#### >> Inspection requested via web by James Larkin
BLD-Framing/Rough-in10/8/201310/9/201310/9/2013ACANC
DetailsMike Jordan
Call 30 minutes prior to inspection. Thanks. Brian Phone #: ###-#### >> Inspection requested via web by James Larkin
BLD-Framing/Rough-in10/8/201310/9/201310/9/2013APASS
DetailsMike Jordan
Call 30 minutes prior to inspection. Thanks. Brian Phone #: ###-#### >> Inspection requested via web by James Larkin
BLD-Wall Bracing8/1/20138/1/20138/1/2013PPASS
DetailsMike Jordan
Phone #: ###-#### >> Inspection requested via web by James Larkin
BLD-Footing7/2/20137/3/20137/3/2013PPASS
DetailsMike Jordan
Greg Phone #: ###-#### nterior thickened footing.
BLD-Energy code compliance6/24/20136/24/20136/24/2013PPASS
DetailsMike Jordan
Rigid foam insulation, under slab on grade, interior side of stemwall.
BLD-Foundation6/18/20136/19/20136/19/2013PPASS
DetailsJim Sly
Phone #: 2086971241 >> Inspection requested via mobile web by Heron
BLD-Footing6/18/20136/18/20136/18/2013PPASS
DetailsJim Sly
Phone #: 2086971241 >> Inspection requested via mobile web by Heron
Issue PAID IN FULL permit  6/13/2013 DONE
DetailsBarbara Stitt
OVERRIDE  4/29/2013  
Plan assigned to (AJS) 3/14/20134/29/2013 PASS
DetailsAdele J Schaffeld-Griffin
1ST REVIEW COMPLETED
Routing - PUBLIC WORKS  4/29/2013 PASS
DetailsConnie Baumgartner
Case Summary (BLD)  4/29/2013 DONE
DetailsAdele J Schaffeld-Griffin
Routing - PLAN CHECK4/29/2013 4/29/2013 PASS
DetailsAdele J Schaffeld-Griffin
PLANS/APPL TAKEN TO FRONT DESK  4/29/2013 DONE
Inspection Record Card- Bld  4/29/2013 DONE
DetailsTisha Gallop
Telephone call  4/29/2013 DONE
DetailsChristina Prado
called Jim to advise permit is ready and gave fees due
Permit Ready to Issue  4/29/2013 DONE
DetailsChristina Prado
Routing - PLANNING3/22/2013 4/29/2013 PASS
DetailsSue Cummings
Plan resubmittals received  4/1/2013  
Received 2 copies of sheets A2.1, A4.1, A5.1, 2 copies of structural calcs and taken back to Sue Cummings office
Plan resubmittals received  4/1/2013  
Received 2 copies of sheets A2.1, A4.1, A5.1 and 2 copies structural calcs then taken back to Sue Cummings office
Routing - MECHANICAL3/22/2013 3/22/2013 PASS
DetailsTroy James
1st review completed  3/22/2013 FAIL
DetailsAdele J Schaffeld-Griffin
Routing - PLAN CHECK3/22/2013 3/22/2013 FAIL
DetailsAdele J Schaffeld-Griffin
email sent to Jim 3-22-13

1. Beam number 8 in the structural calculations and the beam called out in the plans do not correspond. There was not hand calculations for beam 8 in the calculations on the wood works design. Please revise.

2. The lateral design for braced wall line A from the structural calculations does not correspond with the design on the plans. Please revise
Routing - MECHANICAL  3/21/2013 FAIL
DetailsTroy James
emailed correction to dustin Mori
Route to Impact Fee Review3/14/20133/19/20133/15/2013 PASS
DetailsCindy M. Gould
Routing - Addressing3/14/2013 3/15/2013 PASS
DetailsJason C. Taylor
Application received 3/14/20133/14/2013 DONE
DetailsBarbara Stitt
Plans ACCEPTED BY PLAN TECH  3/14/2013 DONE
DetailsChristina Prado
Intake Approval  3/14/2013 PASS
DetailsBarbara Stitt
Recd Pcfee & Taken To Pln CK  3/14/2013 DONE
DetailsChristina Prado
Routing - PLANNING    FAIL
Needs CU modification SAC