Permit Information
Permit NumberBLD13-00552
StatusFinaled
Name PARADIGM CONSTRUCTION COMPANY LLC
Site Address 581 S PINE ISLAND LN
Project Name 
Customer Number 
ePlanReviewNo
Description
Permit for the construction of a new 1769 sq. ft., two story (first story 782 sq. ft., second story 987 sq. ft.) single family dwelling with 3 bedrooms, 2.5 bathrooms, approximately 42 sq. ft. of covered patio/porch and a 439 sq. ft. attached garage per the approved plans, attached Res Check, attached engineering, plan review report and any notations. The south west angled portion of the structure is located on the property line. Pinetree sub #3 Platt note #12 and hashed marks indicates it abuts an irrigation easement and a no build open space to be maintained by the H.O.A. No portion of the structure may project over the property line. The irrigation easement runs the length of the West wall line. As this is platted open area it was counted as yard space in regards to fire rating requirements based on set back from property line. R-2D zoning and setbacks per planning. AJS
Contact Information
See Activities list for contact information
Color Key
Current location of plans being reviewed:  
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final1/31/20142/3/20142/3/2014APASS
DetailsMike Jordan
Phone #: ###-#### >> Inspection requested via web by Brian Stark
DOC - Permit Finaled2/3/20142/3/20142/3/2014PPASS
DetailsMike Jordan
BLD-Blower Door Test Results2/3/20142/3/20142/3/2014ADONE
DetailsMike Jordan
4.0
BLD-Final1/30/20141/31/20141/31/2014ANR
DetailsMike Jordan
Phone #: ###-#### >> Inspection requested via web by Brian Stark
BLD-Final1/28/20141/29/20141/29/2014ANR
DetailsMike Jordan
Phone #: ###-#### >> Inspection requested via web by Brian Stark
BLD-Wall cover11/5/201311/5/201311/5/2013PPASS
DetailsMike Jordan
Firewall assembly Phone #: ###-#### >> Inspection requested via web by Brian Stark
BLD-Wall cover11/1/201311/4/201311/4/2013ANR
DetailsMike Jordan
Fastening on firewall assembly...interior sheetrock Phone #: ###-#### >> Inspection requested via web by Brian Stark
BLD-Energy code compliance10/25/201310/28/201310/28/2013APASS
DetailsMike Jordan
Phone #: ###-#### >> Inspection requested via web by Brian Stark
BLD-Framing/Rough-in10/28/201310/28/201310/28/2013APASS
DetailsMike Jordan
Phone #: ###-#### >> Inspection requested via web by Brian Stark
BLD-Framing/Rough-in10/21/201310/22/201310/22/2013PPART
DetailsMike Jordan
Phone #: ###-#### >> Inspection requested via web by Brian Stark. Provide floor truss repair at stairs from truss engineer. Complte airseal pack at missed locations. Pending mechanical rough in inspection.
Plan resubmittals received  10/18/2013 DONE
new manual j
Routing - MECHANICAL10/18/2013 10/18/2013 PASS
DetailsTroy James
resubmitted manual j
BLD-Wall Bracing8/1/20138/1/20138/1/2013PPASS
DetailsMike Jordan
Phone #: ###-#### >> Inspection requested via web by James Larkin
BLD-Footing7/2/20137/3/20137/3/2013PPASS
DetailsMike Jordan
Greg Phone #: ###-#### nterior thickened footing.
BLD-Energy code compliance6/24/20136/24/20136/24/2013PPASS
DetailsMike Jordan
greg Phone #: ###-#### Rigid foam insulation, under slab on grade, interior side of stemwall.
BLD-Foundation6/18/20136/19/20136/19/2013PPASS
DetailsJim Sly
Phone #: 2086971241 >> Inspection requested via mobile web by Heron
BLD-Footing6/18/20136/18/20136/18/2013PPASS
DetailsJim Sly
Phone #: 2086971241 >> Inspection requested via mobile web by Heron
Issue PAID IN FULL permit  6/13/2013 DONE
DetailsBarbara Stitt
OVERRIDE  5/3/2013  
Plan assigned to (AJS) 3/14/20135/3/2013 PASS
DetailsAdele J Schaffeld-Griffin
1ST REVIEW COMPLETED
Case Summary (BLD)  5/3/2013 DONE
DetailsAdele J Schaffeld-Griffin
Routing - PLAN CHECK5/3/2013 5/3/2013 PASS
DetailsAdele J Schaffeld-Griffin
1st review completed  5/3/2013 DONE
DetailsAdele J Schaffeld-Griffin
PLANS/APPL TAKEN TO FRONT DESK  5/3/2013 DONE
Inspection Record Card- Bld  5/3/2013 DONE
DetailsBarbara Stitt
Telephone call  5/3/2013 DONE
DetailsChristina Prado
emailed contractor
Permit Ready to Issue  5/3/2013 DONE
DetailsChristina Prado
Routing - PLANNING3/25/2013 5/3/2013 PASS
DetailsSue Cummings
Plan resubmittals received  5/2/2013  
Received 2 copies of sheets A1.1, A2.1, A3.1 taken and added to the plans at Sue Cummings desk
1st review completed  3/25/2013 FAIL
DetailsAdele J Schaffeld-Griffin
Needs CU approval home extends over properyl line. did not review.
Routing - PLAN CHECK3/22/2013 3/25/2013 FAIL
DetailsAdele J Schaffeld-Griffin
Needs CU approval home extends over properyl line. did not review.
Routing - MECHANICAL  3/22/2013 PASS
DetailsTroy James
Route to Impact Fee Review3/14/20133/19/20133/15/2013 PASS
DetailsCindy M. Gould
Routing - Addressing3/14/2013 3/15/2013 PASS
DetailsJason C. Taylor
Routing - PUBLIC WORKS3/15/2013 3/15/2013 PASS
DetailsConnie Baumgartner
Application received 3/14/20133/14/2013 DONE
DetailsBarbara Stitt
Plans ACCEPTED BY PLAN TECH  3/14/2013 DONE
DetailsChristina Prado
Recd Pcfee & Taken To Pln CK  3/14/2013 DONE
DetailsChristina Prado
Intake Approval  3/14/2013 PASS
DetailsBarbara Stitt
Routing - PLANNING3/15/2013   FAIL
DetailsSue Cummings