BLD-Final | 7/10/2014 | 7/11/2014 | 7/11/2014 | P | PASS |
Dave Hannah
|
|
|
Clyde-coming in AM to take care of bond Phone #: ###-####
|
DOC - Permit Finaled | 7/11/2014 | 7/11/2014 | 7/11/2014 | P | PASS |
Dave Hannah
|
|
|
|
PubWorks Occupancy Approval | 7/11/2014 | 7/11/2014 | 7/11/2014 | | DONE |
Jason C. Taylor
|
|
|
A bond for the sites final grading and re-vegetation has been received by Public Works. Occupancy may be approved by the building department. Jason Taylor ###-####.
|
BLD-Final | 7/3/2014 | 7/7/2014 | 7/7/2014 | A | NR |
Dave Hannah
|
|
|
Clive Phone #: ###-#### needs hill side finaled
|
BLD-Final | 6/18/2014 | 6/19/2014 | 6/19/2014 | A | FAIL |
Jim Storey
|
|
|
clive Phone #: ###-#### handrails atreem and upper roof deck
|
BLD-Energy code compliance | 11/8/2013 | 11/12/2013 | 11/12/2013 | A | PASS |
Jim Storey
|
|
|
jared Phone #: ###-####
|
BLD-Framing/Rough-in | 11/6/2013 | 11/7/2013 | 11/7/2013 | A | PASS |
Jim Storey
|
|
|
Jared Phone #: ###-####
|
BLD-Framing/Rough-in | 11/4/2013 | 11/5/2013 | 11/5/2013 | P | NR |
Jim Storey
|
|
|
Jared Phone #: ###-#### need truss engineering
|
BLD-Framing/Rough-in | 10/24/2013 | 10/25/2013 | 10/25/2013 | A | FAIL |
Jim Storey
|
|
|
sheet rock in the sofits-Jared Phone #: ###-#### gyp ok need all canlights to be protected
|
BLD-Wall Bracing | 10/14/2013 | 10/15/2013 | 10/15/2013 | A | PASS |
Dave Hannah
|
|
|
jared Phone #: ###-####
|
BLD-Wall Bracing | 10/9/2013 | 10/10/2013 | 10/10/2013 | A | PART |
Tom Arcoraci
|
|
|
Jared Phone #: ###-#### fire places need hds other ok
|
BLD-Wall Bracing | 9/9/2013 | 9/10/2013 | 9/10/2013 | A | FAIL |
Dave Hannah
|
|
|
jarrod Phone #: ###-#### install hold downs and stapel/nail per engineering
|
BLD-Conference | 9/3/2013 | 9/4/2013 | 9/4/2013 | P | DONE |
Dave Hannah
|
|
|
jared Phone #: ###-####
|
Plan resubmittals received | | | 8/22/2013 | | DONE |
|
|
|
new manual j
|
Routing - MECHANICAL | 8/22/2013 | | 8/22/2013 | | PASS |
Troy James
|
|
|
resubmitted manual j
|
BLD-Foundation | 5/15/2013 | 5/16/2013 | 5/16/2013 | P | PASS |
Dave Hannah
|
|
|
hyrum Phone #: ###-####
|
BLD-Footing | 5/9/2013 | 5/10/2013 | 5/10/2013 | A | PASS |
Jim Sly
|
|
|
hyrum Phone #: ###-####
|
PubWorks Subgrade Approval | 5/9/2013 | 5/9/2013 | 5/9/2013 | | DONE |
Jason C. Taylor
|
|
|
Sungrade approval recieved from geotechnical engineer. Footing inspections can be scheduled with building department.Jason Taylor ###-####.
|
Issue PAID IN FULL permit | | | 5/7/2013 | | DONE |
Christina Prado
|
|
|
|
Route to Impact Fee Review | 4/16/2013 | 4/19/2013 | 4/16/2013 | | PASS |
Cindy M. Gould
|
|
|
|
Plan assigned to (AJS) | 3/14/2013 | 3/14/2013 | 4/16/2013 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
1ST REVIEW COMPLETED
|
Routing - PLAN CHECK | 4/16/2013 | | 4/16/2013 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/16/2013 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 4/16/2013 | | DONE |
Adele J Schaffeld-Griffin
|
|
|
|
Inspection Record Card- Bld | | | 4/16/2013 | | DONE |
Christina Prado
|
|
|
|
Permit Ready to Issue | | | 4/16/2013 | | |
|
|
|
|
Telephone call | | | 4/16/2013 | | |
|
|
|
4-16-13 called left message for Jarrod permit ready and fee given ///dld
|
Routing PW Grading-Hillside | 4/11/2013 | | 4/11/2013 | | PASS |
Jason C. Taylor
|
|
|
Grading plan approved as a Category 1 (new-easy) hillside permit.
A letter from the applicant’s geotechnical engineer indicating that the footing sub-grade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at ###-####
Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Jason Taylor at ###-####.
|
Plan resubmittals received | | | 4/8/2013 | | DONE |
Tisha Gallop
|
|
|
received two copies of response from architect, response from engineer, ES Report, Structural Calcs, ResCheck, plan sheets S2.1, S2.2; taken to Adele
|
1st review completed | | | 3/28/2013 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
plan review comments emailed to Jarroed 3/28/13
|
Routing - PLAN CHECK | 3/26/2013 | | 3/27/2013 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
plan review comments emailed to Jarroed 3/28/13
|
Routing - FIRE | 3/26/2013 | | 3/26/2013 | | PASS |
Scott Arellano
|
|
|
No Fire Sprinklers Required.
|
Routing - Erosion and Sediment | 3/21/2013 | | 3/25/2013 | | PASS |
Kimberly M. Johnson
|
|
|
|
Routing - MECHANICAL | 3/21/2013 | | 3/21/2013 | | PASS |
Troy James
|
|
|
|
Routing - MECHANICAL | 3/18/2013 | | 3/20/2013 | | FAIL |
Troy James
|
|
|
emailed corrections to Teds Heating
|
Routing - PLANNING | 3/18/2013 | | 3/18/2013 | | PASS |
David Moser
|
|
|
|
Routing - PUBLIC WORKS | 3/15/2013 | | 3/18/2013 | | PASS |
Connie Baumgartner
|
|
|
|
Routing - Addressing | 3/14/2013 | | 3/15/2013 | | PASS |
Jason C. Taylor
|
|
|
|
Routing PW Grading-Hillside | 3/14/2013 | | 3/15/2013 | | FAIL |
Jason C. Taylor
|
|
|
(Please re-route to Hillside for approval) Grading plan needs revised to show roof drain connections to storm drain system. Jason Taylor ###-####.
|
Application received | | | 3/14/2013 | | DONE |
|
|
|
Application submitted via PDS Online on Mar 14 2013 10:22AM
|
Plans ACCEPTED BY PLAN TECH | | | 3/14/2013 | | DONE |
|
|
|
|
Intake Approval | | | 3/14/2013 | | PASS |
|
|
|
|