Permit Information
Permit NumberBLD13-00597
StatusFinaled
Name BOISE CITY PARKS & REC
Site Address 1001 N AMERICANA BLVD
Project NameEyrie Shelter
Customer Number 
ePlanReviewYes
Description
(EYRIE SHELTER - Trellace) Permit to construct a new overhead open slat trellace structure on top of existing stone pillar/columns. The trellis will be constructed and consist of 5-1/4" X 8" Glulam beams convered with 6" cedar split rails 12" o.c. Connections and concrete anchoring per engineering. SPECIAL INSPECTIONS ARE REQUIRED. All work shall comply with the approved drawings, engineering, and all applicable codes. A certificate of completion shall be issued when work is completed and a final inspection has occurred. **SRZ**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice 7/6/20137/2/2013 DONE
Second Notice 6/13/20137/1/2013 DONE
e-mailed to Kelly Burrows
First Notice5/9/20135/9/20136/3/2013 DONE
DetailsTom Arcoraci
Faxed 6-3-13
BLD-Final5/9/20135/9/20135/9/2013PPASS
DetailsTom Arcoraci
Rod-PLease call prior to inspection so that he can meet ya out there Phone #: ###-####
BLD-Final5/9/20135/9/20135/9/2013PPASS
DetailsTom Arcoraci
Rod-PLease call prior to inspection so that he can meet ya out there Phone #: ###-####
DOC - Permit Finaled5/9/20135/9/20135/9/2013PPASS
DetailsTom Arcoraci
Fees Due Hold5/3/2013 5/9/2013 DONE
DetailsBarbara Stitt
BLD-Final5/2/20135/6/20135/6/2013AFAIL
DetailsTom Arcoraci
###-#### ROD-please call prior to insepction no inspection due to fee hold
Inspection Record Card- Bld  5/2/2013 DONE
DetailsBarbara Stitt
Permit Ready to Issue  5/2/2013 DONE
DetailsBarbara Stitt
Issue & PRINT to be Invoiced  5/2/2013 DONE
DetailsBarbara Stitt
Plan assigned to (SRZ)3/21/2013 3/26/2013 PASS
DetailsSam Zahorka
Routing - PLAN CHECK3/21/2013 3/26/2013 PASS
DetailsSam Zahorka
1st review completed  3/26/2013 DONE
DetailsSam Zahorka
PLANS/APPL TAKEN TO FRONT DESK  3/26/2013 DONE
DetailsSam Zahorka
Routing - PLANNING3/21/2013 3/25/2013 PASS
DetailsSarah Schafer
Project is in the A-1 zone, outside of floodplain and is an allowed use. No DR or CU required.
Routing - FIRE3/21/2013 3/22/2013 PASS
DetailsScott Arellano
No comments attached.
Intake Approval  3/21/2013 PASS
DetailsTim L. Woodard
Intake Approval  3/18/2013 FAIL
DetailsJohn Menard
1. Each plan sheet to be uploaded as a separate file. Please delete the plan file and re-upload each drawing as a separate file.
2. The small documents to be uploaded into the documents folder. Please delete the calculations, 304 form and 520 checklist and re-upload in the documents folder.
3. Additional information requested.
Please submit an elevation drawing indicating the trellis height and design.
Please submit drawings and structural information for the existing columns.
Please add a detail for the split rail attachment.
Is this trellis replacing an existing trellis?
Were the existing columns constructed under a previous building permit?
If so, please provide the permit number for reference.
Application received  3/15/2013 DONE
Application submitted via PDS Online on Mar 15 2013 2:10PM