Permit NumberBLD13-00649
StatusFinaled
Name ESTEP BUILDERS INC
Site Address 600 S 8TH ST
Project NameRevolution 22
Customer Number 
ePlanReviewNo
Description
(Revolution 22)(Foothills School)Permit to renovate existing tenant space to create worship space for church services on weekends. Occupancy will change from the existing "E" to "A-3" on weekends in the modified space. An alternate was approved by the building official and fire marshal for a reduced occupant load, see comments on approved modifications. Two large overhead doors will be installed in the nonbearing wall between the two rooms intended to be used for worship to make the space one. Minor demolition shall be per the approved plans. Interior finishes shall comply with chapter 8 IBC. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. **AJS**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice 11/5/201311/7/2013 DONE
Third Notice 10/15/201310/31/2013 DONE
mailed to Estep Builders
Second Notice 9/8/201310/10/2013 DONE
Mailed 10-2-13
First Notice 8/25/20138/29/2013 DONE
FIRE-Final Inspection8/15/20138/15/20138/15/2013PPASS
DetailsForrest France
Fire life safety inspection completed satisfactory.
BLD-Final8/15/20138/15/20138/15/2013PPASS
DetailsDave Hannah
Ok per Forrest
Permanent Occupancy  8/15/2013 DONE
DetailsChristina Prado
BLD-Framing/Rough-in7/25/20137/26/20137/26/2013PPASS
DetailsDave Hannah
Bren-Please call at least 30 mins prior to inspections Phone #: ###-####
Plan assigned to (AJS)7/16/20137/16/20137/25/2013 PASS
DetailsAdele J Schaffeld-Griffin
Level 2 Due 7/29 Early start issued
Routing - PLAN CHECK7/16/2013 7/25/2013 PASS
DetailsAdele J Schaffeld-Griffin
1st review completed  7/25/2013 DONE
DetailsAdele J Schaffeld-Griffin
Case Summary (BLD)  7/25/2013 DONE
DetailsAdele J Schaffeld-Griffin
PLANS/APPL TAKEN TO FRONT DESK  7/25/2013 DONE
DetailsAdele J Schaffeld-Griffin
Print Occupancy Form  7/25/2013 DONE
DetailsBarbara Stitt
Permit Ready to Issue  7/25/2013 DONE
DetailsTisha Gallop
Telephone call  7/25/2013 DONE
DetailsTisha Gallop
called rob and left vm permit is ready, fee and need GC
Issue PAID IN FULL permit  7/25/2013 DONE
DetailsBarbara Stitt
Routing - PLANNING7/24/2013 7/24/2013 PASS
DetailsCody Riddle
The church is accessory to the primary use of the property (school). Churches are allowed in the underlying (C-5) zone, and the site is located in the P-1 Parking Overlay, so no additional parking is required.
Plans ACCEPTED BY PLAN TECH  7/16/2013 DONE
DetailsChristina Prado
Intake Approval  7/16/2013 PASS
DetailsAdele J Schaffeld-Griffin
Override - Parcel Holds  7/16/2013  
Recd Pcfee & Taken To Pln CK  7/16/2013 DONE
DetailsChristina Prado
Application received 3/21/2013