FIRE-Final Inspection | 4/17/2013 | 4/23/2013 | 4/23/2013 | A | PASS |
Forrest France
|
|
|
Noted correction items have been finished. Life safety passed.
|
BLD-Final | 4/17/2013 | 4/23/2013 | 4/23/2013 | P | PASS |
Jim Storey
|
|
|
jonathan Phone #: ###-####
|
Permanent Occupancy | | | 4/23/2013 | | DONE |
Tisha Gallop
|
|
|
|
Case Summary (BLD) | | | 4/18/2013 | | DONE |
|
|
|
|
FIRE-Final Inspection | 4/15/2013 | 4/17/2013 | 4/17/2013 | P | FAIL |
Forrest France
|
|
|
Need to provide approved door hardware at several locations, remove or disable manual thumbturns at required exit doors, post "door to remain..." signage at the main entry/exit, min. rated fire extinguisher is 2A10BC.
|
Issue PAID IN FULL permit | | | 4/15/2013 | | DONE |
Tisha Gallop
|
|
|
|
Print Occupancy Form | | | 4/15/2013 | | DONE |
Tisha Gallop
|
|
|
|
Routing - PUBLIC WORKS | 4/5/2013 | | 4/8/2013 | | PASS |
Connie Baumgartner
|
|
|
|
Routing - Addressing | 4/5/2013 | | 4/8/2013 | | PASS |
Jason C. Taylor
|
|
|
|
Routing PW Sewer Rating | 4/8/2013 | | 4/8/2013 | | CLB |
Connie Baumgartner
|
|
|
|
Override - Parcel Holds | | | 4/8/2013 | | |
|
|
|
|
Permit Ready to Issue | | | 4/8/2013 | | DONE |
Tisha Gallop
|
|
|
|
Telephone call | | | 4/8/2013 | | DONE |
Tisha Gallop
|
|
|
called Jonothan and told him revised fees due because installing drinking fountain and that he can pay and pick up permit on 4/15 when appeal period is up.
|
Routing - PLAN CHECK | 4/4/2013 | | 4/5/2013 | | PASS |
Tim L. Woodard
|
|
|
|
Plan assigned to (TLW) | 3/25/2013 | | 4/5/2013 | | PASS |
Tim L. Woodard
|
|
|
|
Routing - FIRE | | | 4/5/2013 | | PASS |
|
|
|
|
Routing - PLAN CHECK | 4/5/2013 | | 4/5/2013 | | PASS |
Tim L. Woodard
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/5/2013 | | DONE |
Tim L. Woodard
|
|
|
|
Case Summary (BLD) | | | 4/5/2013 | | DONE |
Tim L. Woodard
|
|
|
|
Print Occupancy Form | | | 4/5/2013 | | DONE |
|
|
|
|
CHANGE STATUS TO (REV) | | | 4/5/2013 | | DONE |
Tisha Gallop
|
|
|
change out of fee status, route to PW for addition of drinking fountain.
|
Plan Reviewer's activity | | | 4/4/2013 | | DONE |
|
|
|
Emailed Fire Code Plan Review.
|
Routing - FIRE | 4/2/2013 | | 4/4/2013 | | FAIL |
Scott Arellano
|
|
|
|
1st review completed | | | 4/4/2013 | | FAIL |
Scott Arellano
|
|
|
Failed Fire.
|
Routing - PLAN CHECK | 3/25/2013 | | 4/2/2013 | | PASS |
Tim L. Woodard
|
|
|
Approved with specific conditions. Refer to attached report. TLW
|
Application received | | 3/25/2013 | 3/25/2013 | | DONE |
Tisha Gallop
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 3/25/2013 | | DONE |
Tisha Gallop
|
|
|
|
First Notice | | 5/3/2013 | | | |
|
|
|
|