First Notice | | 10/27/2014 | 11/12/2014 | | DONE |
|
|
|
This permit finaled on the web by Scott Raymes
|
Permanent Occupancy | | | 10/17/2014 | | DONE |
Christina Prado
|
|
|
|
BLD-Final | 10/15/2014 | 10/16/2014 | 10/16/2014 | A | PASS |
Jim Storey
|
|
|
Odie Phone #: ###-####
|
Zoning Approval | 9/18/2014 | 9/18/2014 | 9/18/2014 | | PASS |
Josh Wilson
|
|
|
|
BLD-Final | 9/16/2014 | 9/17/2014 | 9/17/2014 | A | NR |
Jim Storey
|
|
|
Odie Phone #: ###-####
|
FIRE-Final Inspection | 9/15/2014 | 9/16/2014 | 9/16/2014 | P | PASS |
Forrest France
|
|
|
C/N items completed. Fire life safety passed inspection.
|
FIRE-Final Inspection | 9/3/2014 | 9/4/2014 | 9/4/2014 | A | NR |
Forrest France
|
|
|
Fire life safety final pending project related FIR13-00308.
|
FIRE-Final Inspection | 8/12/2014 | 8/15/2014 | 8/19/2014 | A | PART |
Forrest France
|
|
|
Odie Phone #: ###-####-please give as much notice as possible so he can meet
|
BLD-Framing/Rough-in | 6/23/2014 | 6/24/2014 | 6/24/2014 | A | PASS |
Jim Storey
|
|
|
Odie Phone #: ###-####
|
PubWorks Occupancy Approval | 6/9/2014 | 6/9/2014 | 6/9/2014 | | DONE |
Tiffany Lowery
|
|
|
|
FIRE-Conference | 5/27/2014 | 5/27/2014 | 5/27/2014 | P | DONE |
Forrest France
|
|
|
Regarding floorplan modifications at the new and existing office areas 1st and 2nd floor.
|
BLD-Framing/Rough-in | 5/13/2014 | 5/14/2014 | 5/14/2014 | A | PASS |
Jim Storey
|
|
|
Odie Phone #: ###-####
|
BLD-Final | 4/17/2014 | 4/18/2014 | 4/18/2014 | A | FAIL |
Jim Storey
|
|
|
Bodie-temp occupancy Phone #: ###-#### door 128 must meet exit door 1008
|
FIRE-Final Inspection | 4/16/2014 | 4/17/2014 | 4/17/2014 | A | PART |
Forrest France
|
|
|
Inspection completed for the new office area addition 1st and 2nd floors. Noted adjustments necessary to exit signage and fire sprinkler coverage. Also completed functional fire alarm testing including occupant notification.
|
BLD-Framing/Rough-in | 12/23/2013 | 12/23/2013 | 12/23/2013 | P | PART |
Jim Storey
|
|
|
Ceiling insepction--Odie Phone #: ###-#### pending others/ vapor barrior at exterior wall at stair.
|
BLD-Framing/Rough-in | 9/16/2013 | 9/17/2013 | 9/17/2013 | P | PASS |
Jim Storey
|
|
|
odie Phone #: ###-#### east exterior wal ok/ interior ok for backing material
|
BLD-Framing/Rough-in | 9/9/2013 | 9/10/2013 | 9/10/2013 | A | PART |
Jim Storey
|
|
|
ernie Phone #: ###-#### exterior walls ok
|
BLD-Framing/Rough-in | 8/22/2013 | 8/23/2013 | 8/23/2013 | A | PART |
Jim Storey
|
|
|
odie Phone #: ###-#### grid 7 exterior wall ok to cover
|
BLD-Conference | 7/10/2013 | 7/10/2013 | 7/10/2013 | A | PART |
Jim Storey
|
|
|
ft and wall performed with si pending reports. contractorto call in for inspection with si requist. si to e-mail reports to 301.
|
OVERRIDE | | | 5/22/2013 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 5/22/2013 | | DONE |
Barbara Stitt
|
|
|
|
Print Occupancy Form | | | 5/22/2013 | | DONE |
Barbara Stitt
|
|
|
|
Permit Ready to Issue | | | 5/22/2013 | | DONE |
Barbara Stitt
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/8/2013 | | DONE |
John Menard
|
|
|
|
Routing Off Site - STRUCTURAL | 5/1/2013 | | 5/8/2013 | | PASS |
John Menard
|
|
|
|
Plan assigned to (JCM) | 3/29/2013 | | 5/8/2013 | | PASS |
John Menard
|
|
|
1st Review completed 4/17/2013. JCM
|
Routing - Erosion and Sediment | 5/1/2013 | | 5/3/2013 | | PASS |
Kimberly M. Johnson
|
|
|
pass with redlines
|
Routing PW Drainage | 5/1/2013 | | 5/2/2013 | | PASS |
Brian Murphy
|
|
|
|
Routing - PLUMBING | 5/2/2013 | | 5/2/2013 | | PASS |
Daryl Spivey
|
|
|
Provide tempered water to lavs and showers and per plan and 2009 ISPC.
|
Routing - PLAN CHECK | 5/1/2013 | | 5/2/2013 | | PASS |
John Menard
|
|
|
|
Routing - PUBLIC WORKS | 5/1/2013 | | 5/1/2013 | | PASS |
Connie Baumgartner
|
|
|
|
1st review completed | | | 4/17/2013 | | FAIL |
John Menard
|
|
|
|
Routing - PLAN CHECK | 3/29/2013 | | 4/17/2013 | | FAIL |
John Menard
|
|
|
|
Plan resubmittals requested | | | 4/17/2013 | | DONE |
John Menard
|
|
|
Resubmitals requested through ProjectDox. JCM
|
Routing Off Site - STRUCTURAL | 3/29/2013 | | 4/15/2013 | | FAIL |
John Menard
|
|
|
|
Routing - FIRE | 3/29/2013 | | 4/10/2013 | | PASS |
Scott Arellano
|
|
|
Attached Plan review comments to plans.
|
Routing PW Drainage | 4/1/2013 | | 4/3/2013 | | FAIL |
Brian Murphy
|
|
|
|
Routing PW Environmental | 4/1/2013 | | 4/2/2013 | | PASS |
Walt Baumgartner
|
|
|
|
Routing PW Sewer Rating | 4/1/2013 | | 4/1/2013 | | PASS |
Connie Baumgartner
|
|
|
|
Route to Impact Fee Review | 3/29/2013 | | 4/1/2013 | | PASS |
Cindy M. Gould
|
|
|
|
Routing - PLUMBING | 3/29/2013 | | 4/1/2013 | | PASS |
Daryl Spivey
|
|
|
Provide tempered wated to lavs and showers per ISPC.
Per plans and 2009 ISPC>
|
Routing - Addressing | 3/29/2013 | | 4/1/2013 | | PASS |
Jason C. Taylor
|
|
|
|
Routing - PUBLIC WORKS | 3/29/2013 | | 4/1/2013 | | PASS |
Connie Baumgartner
|
|
|
|
Payment Received | | | 3/29/2013 | | DONE |
|
|
|
Payment received via Govolutions
|
Pending Assignment by JCM | 3/29/2013 | | 3/29/2013 | | DONE |
John Menard
|
|
|
|
Routing - Design Review | 3/29/2013 | | 3/29/2013 | | PASS |
Josh Wilson
|
|
|
|
Routing - Erosion and Sediment | 3/29/2013 | | 3/29/2013 | | FAIL |
Kimberly M. Johnson
|
|
|
1. This site is subject to federal NPDES permitting. Please include notification to the contractor in the ESC plan of their obligation to submit an NOI or LEW. Please note, this plan does not fulfill the 2012 CGP SWPPP requirements.
2. Please describe what temporary stabilization measures will be used for stockpiles and if portions of the site become inactive.
3. Please describe what waste disposal practices will be followed for paint, mortar, stucco, ect.
4. Provide the details for the BMPs as referenced.
|
Routing - PLANNING Land Div | 3/29/2013 | | 3/29/2013 | | PASS |
Dave Abo
|
|
|
Parcel 1 of ROS 4265.
|
Intake Approval | | | 3/29/2013 | | PASS |
John Menard
|
|
|
|
Application received | | | 3/26/2013 | | DONE |
|
|
|
Application submitted via PDS Online on Mar 26 2013 3:16PM
|