Telephone call | | | 10/16/2014 | | DONE |
Candy A. Nichols
|
|
|
called James Hullyburton-asked him what the valuation was for electrical (it was hard to tell what it was) he said 1933.00. Also the Mechanical was what they paid for for the plans and it was included in the building value. So no fees for mechanical
|
First Notice | 9/3/2014 | 9/3/2014 | 10/6/2014 | | DONE |
Candy A. Nichols
|
|
|
sent in mail 10-6-14
|
BLD-Final | 8/13/2014 | 9/3/2014 | 9/3/2014 | P | PASS |
Jim Storey
|
|
|
jimmy - ###-#### -please call with a meet time-wwould like at 4:00 if possible
|
DOC - Permit Finaled | 9/3/2014 | 9/3/2014 | 9/3/2014 | P | PASS |
Jim Storey
|
|
|
|
DOC - Permit Finaled | 9/3/2014 | 9/3/2014 | 9/3/2014 | P | PASS |
Jim Storey
|
|
|
|
FIRE-Final Inspection | 8/13/2014 | 9/2/2014 | 9/2/2014 | P | PASS |
Forrest France
|
|
|
Life safety passed. Scope of work completed.
|
BLD-Framing/Rough-in | 6/17/2013 | 6/18/2013 | 6/18/2013 | P | PASS |
Jim Storey
|
|
|
Jimmy Phone #: ###-#### ok to cover upon ele permit and aproval.
|
Inspection Record Card- Bld | | | 4/25/2013 | | DONE |
Tisha Gallop
|
|
|
|
Permit Ready to Issue | | | 4/25/2013 | | DONE |
Christina Prado
|
|
|
|
Telephone call | | | 4/25/2013 | | DONE |
Christina Prado
|
|
|
Called Ken to advise permit is ready to issue pending GC/RCE also gave fees due. Ken stated owner will be GC so all we need is the signature form
|
Issue PAID IN FULL permit | | | 4/25/2013 | | DONE |
Christina Prado
|
|
|
|
Plan assigned to (TLW) | 3/27/2013 | | 4/24/2013 | | PASS |
Tim L. Woodard
|
|
|
1st Review completed
|
Plan resubmittals received | | | 4/24/2013 | | DONE |
Tim L. Woodard
|
|
|
Kenneth Reed made changes to the drawings with pen to show compliance. The engineer ran new span charts for switching to 2X6 floor on mezzanine. TLW
|
Routing - PLAN CHECK | 4/24/2013 | | 4/24/2013 | | PASS |
Tim L. Woodard
|
|
|
|
Case Summary (BLD) | | | 4/24/2013 | | DONE |
Tim L. Woodard
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/24/2013 | | DONE |
Tim L. Woodard
|
|
|
|
Routing - PLAN CHECK | 3/27/2013 | | 4/16/2013 | | FAIL |
Tim L. Woodard
|
|
|
Refer to plan review report. TLW
|
1st review completed | | | 4/16/2013 | | DONE |
Tim L. Woodard
|
|
|
|
Application received | | 3/27/2013 | 3/27/2013 | | DONE |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 3/27/2013 | | DONE |
Tisha Gallop
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 3/27/2013 | | DONE |
Tisha Gallop
|
|
|
|