BLD-Final | 1/3/2014 | 1/7/2014 | 1/7/2014 | P | PASS |
Jim Sly
|
|
|
hanic - late afternoon please Phone #: ###-####
|
DOC - Permit Finaled | 1/7/2014 | 1/7/2014 | 1/7/2014 | P | PASS |
Jim Sly
|
|
|
|
BLD-Energy code compliance | 9/4/2013 | 9/5/2013 | 9/5/2013 | P | PASS |
Jim Sly
|
|
|
late as poss // Sabahudin Phone #: ###-####
|
BLD-Framing/Rough-in | 8/8/2013 | 8/8/2013 | 8/8/2013 | P | PASS |
Tom Arcoraci
|
|
|
Saki Phone #: ###-#### call 30 min ahesd
|
BLD-Framing/Rough-in | 8/7/2013 | 8/8/2013 | 8/8/2013 | A | NH |
Tom Arcoraci
|
|
|
Saki Phone #: ###-####
|
BLD-Framing/Rough-in | 6/5/2013 | 6/5/2013 | 6/5/2013 | P | PART |
Jim Sly
|
|
|
Please call ahead to meet on site - Senad Phone #: ###-####
shear inspection.....OK
|
BLD-Conference | 5/15/2013 | 5/16/2013 | 5/16/2013 | A | DONE |
Jim Sly
|
|
|
requests after 10 - senad Phone #: ###-####
|
OVERRIDE | | | 4/24/2013 | | |
|
|
|
|
BLD-Foundation | 4/24/2013 | 4/24/2013 | 4/24/2013 | P | PASS |
Tom Arcoraci
|
|
|
senab Phone #: ###-####
|
Routing Walk-In (BLD) | 4/24/2013 | 4/24/2013 | 4/24/2013 | P | PASS |
Perry Paine
|
|
|
|
Case Summary (BLD) | | | 4/24/2013 | | |
|
|
|
|
Inspection Record Card- Bld | | | 4/24/2013 | | |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/24/2013 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 4/24/2013 | | DONE |
Christina Prado
|
|
|
|
(F) Reprint permit | | | 4/24/2013 | | DONE |
Christina Prado
|
|
|
|
CHANGE STATUS TO (ISS) | | | 4/24/2013 | | DONE |
Christina Prado
|
|
|
|
Routing Walk-In (BLD) | 4/23/2013 | 4/23/2013 | 4/23/2013 | P | PASS |
Perry Paine
|
|
|
need floor plan of upper level to add 2nd floor addition to the project...4-23-2013 3-13-2013
|
BLD-Foundation | 4/19/2013 | 4/22/2013 | 4/22/2013 | A | DONE |
Jim Sly
|
|
|
please call 30min prior for access - senad Phone #: ###-#### Met with contr.........
|
OVERRIDE | | | 3/29/2013 | | |
|
|
|
|
Routing Walk-In (Zoning) | 3/29/2013 | 3/29/2013 | 3/29/2013 | A | PASS |
Colleen T Carroll
|
|
|
|
Routing Walk-In (BLD) | 3/29/2013 | 3/29/2013 | 3/29/2013 | A | DONE |
Perry Paine
|
|
|
|
Plan assigned to (PEP) | 3/29/2013 | 3/29/2013 | 3/29/2013 | | PASS |
Perry Paine
|
|
|
|
Case Summary (BLD) | | | 3/29/2013 | | |
|
|
|
|
Inspection Record Card- Bld | | | 3/29/2013 | | |
|
|
|
|
1st review completed | | | 3/29/2013 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/29/2013 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 3/29/2013 | | DONE |
Barbara Stitt
|
|
|
|
Issue PAID IN FULL permit | | | 3/29/2013 | | DONE |
Barbara Stitt
|
|
|
|
Application received | | 3/29/2013 | | | |
|
|
|
|