BLD-Final | 8/2/2013 | 8/2/2013 | 8/2/2013 | P | PASS |
Dave Hannah
|
|
|
bernie Phone #: ###-####
|
DOC - Permit Finaled | 8/2/2013 | 8/2/2013 | 8/2/2013 | P | PASS |
Dave Hannah
|
|
|
|
BLD-Final | 6/18/2013 | 6/18/2013 | 6/19/2013 | P | FAIL |
Dave Hannah
|
|
|
Bernie Phone #: ###-#### gates and fence not to code per apx G
|
BLD-Footing | 4/26/2013 | 4/29/2013 | 4/29/2013 | A | PASS |
Dave Hannah
|
|
|
james Phone #: ###-####
|
PubWorks Subgrade Approval | 4/26/2013 | 4/26/2013 | 4/26/2013 | | DONE |
Jason C. Taylor
|
|
|
Received subgrade approval from geotechnical engineer (Bob Jones). Footing inspections can be scheduled with the building department. Jason Taylor ###-####
|
BLD-Footing | 4/22/2013 | 4/24/2013 | 4/24/2013 | A | FAIL |
Dave Hannah
|
|
|
bernie Phone #: ###-#### needs a geo tech ok on sub soils
|
Issue PAID IN FULL permit | | | 4/2/2013 | | DONE |
Tisha Gallop
|
|
|
|
OVERRIDE | | | 4/1/2013 | | |
|
|
|
|
Routing Walk-In (BLD) | 4/1/2013 | 4/1/2013 | 4/1/2013 | P | DONE |
Perry Paine
|
|
|
|
Plan assigned to (PEP) | 4/1/2013 | 4/1/2013 | 4/1/2013 | | PASS |
Perry Paine
|
|
|
|
Routing Walk-In (Erosion) | 3/29/2013 | 3/29/2013 | 4/1/2013 | P | PASS |
Kimberly M. Johnson
|
|
|
for ESC plan waiver Request.
|
Telephone call | | | 4/1/2013 | | DONE |
Tisha Gallop
|
|
|
called Bernie and left vm permit is ready, fee and RP license is expired.
|
1st review completed | | | 4/1/2013 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/1/2013 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 4/1/2013 | | DONE |
Tisha Gallop
|
|
|
|
Permit Ready to Issue | | | 4/1/2013 | | DONE |
Tisha Gallop
|
|
|
|
Routing Walk-In (PW Hillside) | 3/29/2013 | 3/29/2013 | 3/29/2013 | P | PASS |
Jason C. Taylor
|
|
|
Pool setback from toe of slope was approved by geotechnical engineer (Bob Jones). Subgrade approval will be required prior to footing inspections by building department. Jason Taylor ###-####
|
Routing Walk-In (Zoning) | 3/29/2013 | 3/29/2013 | 3/29/2013 | P | PASS |
David Moser
|
|
|
|
Routing Walk-In (BLD) | 3/29/2013 | 3/29/2013 | 3/29/2013 | P | CANC |
Perry Paine
|
|
|
|
Routing Walk-In (BLD) | 3/29/2013 | 3/29/2013 | 3/29/2013 | P | DONE |
Perry Paine
|
|
|
|
Application received | | 3/29/2013 | | | |
|
|
|
|